Acceptance test

The basic condition of the Standard application - the availability of stable coupled probabilistic or the multiple probabilistic relations between then controlled quality indexes and magnetic characteristics of steel. All the probabilistic estimates, used in the Standard, are applied at confidence level not less than 0,95. General requirements to the means of control and procedure of its performance are also stipulated. Engineers of standard development endeavoured take into consideration the existed practice of technical control performance and test at the enterprises that is why the preparation of object control for the performance of nondestructive test can be done during the process of ordinary acceptance test. It is suggested that every enterprise is operated in correspondence with direct and non-destructive tests, obtained exactly at it, for detailed process chart and definite product type, however the tests have long since been performed after development of the Standard displayed that process gives way to unification. [Pg.25]

Effective specification control often can be estabUshed other than through requirements placed on the end use material, ie, the specification may beat on the taw materials, the process used to produce the material, or ancillary materials used in its processing. Related but supplementary techniques ate approved vendor Hsts, accredited testing laboratories, and pteptoduction acceptance tests. [Pg.21]

It is necessary to estabUsh a criterion for microbial death when considering a sterilization process. With respect to the individual cell, the irreversible cessation of all vital functions such as growth, reproduction, and in the case of vimses, inabiUty to attach and infect, is a most suitable criterion. On a practical level, it is necessary to estabUsh test criteria that permit a conclusion without having to observe individual microbial cells. The failure to reproduce in a suitable medium after incubation at optimum conditions for some acceptable time period is traditionally accepted as satisfactory proof of microbial death and, consequentiy, stetihty. The appHcation of such a testing method is, for practical purposes, however, not considered possible. The cultured article caimot be retrieved for subsequent use and the size of many items totally precludes practical culturing techniques. In order to design acceptable test procedures, the kinetics and thermodynamics of the sterilization process must be understood. [Pg.404]

Sa.lt Spray Tests. One of the older accelerated corrosion tests is the salt spray test (40). Several modifications of this imperfect test have been proposed, some of which are even specified for particular appHcations. The neutral salt spray test persists, however, especially for coatings that are anodic to the substrate and for coatings that are dissolved or attacked by neutral salt fog. For cathodic coatings, such as nickel on steel, the test becomes a porosity test, because nickel is not attacked by neutral salt fog. Production specifications that call for 1000 hours salt spray resistance are not practical for quahty acceptance tests. In these cases, the neutral salt spray does not qualify as an accelerated test, and faster results from different test methods should be sought. [Pg.151]

ASME recommends periodic monitoring of all pumps. Pump vibration level should fall within the prescribed Emits. The reference vibration level is measured during acceptance testing. This level is specified by the manufacturer. [Pg.914]

Arrester Testing and Standards Regulatory and approval agencies and insurers impose acceptance testing requirements, sometimes as part of certification standards. The user may also request testing to demonstrate specific performance needs, just as the manufacturer can help develop standards. These interrelationships have resulted in several new and updated performance test procedures. Listing of an arrester by a testing laboratoiy refers only to performance under a defined set of test conditions. The flame arrester user should develop specific application requirements based on the service involved and the safety and risk criteria adopted. [Pg.2304]

In drawing contracts and making acceptance tests, refer to the pertinent ASTM standards. ASTM Standards contain specifications (classifications) and test methods for burner fuels (D 396), motor and aviation gasolines (D 4814 and D 910), diesel fuels (D 975), and avia-... [Pg.2362]

To fulfil the above requirements the material inputs for the motor, such as stampings, steel, enamelled copper wire, insulations and varnishes, bearings, enclosure materials and hardware must be subjected to a series of acceptance tests according to norms and standard specifications. For example, enamelled copper wire used... [Pg.250]

The final acceptance test would probably be made by measuring two of the three quantities and using the appropriate equation. For a completely valid efficiency test the effect of hold-up (D) and loss ( ) must also be taken into account. [Pg.452]

Insulation systems were first classified according to the material used, and permissible temperatures were established based on the thermal aging characteristics of these materials. For example. Class B insulation was defined as inorganic materials such as mica and glass with organic binders 130°C was the allowable maximum operating temperature. The present definition of insulation system Class B stipulates that the system be proven. . by experience or accepted tests. .. to have adequate life expectancy at its rated temperature, such life expectancy to equal or... [Pg.261]

When the seal maximum pressure is such that the gas test must be conducted well below rated discharge pressure, then another test, or substituted test, may be invoked in which the seals are removed. It may require removing the rotor however, with this procedure the joint makeup still remains a problem when the rotor is replaced. However, without the seals, the test described earlier is performed, using the rated discharge pressure rather than the maximum seal pressure. The acceptance test is the same also no leaks should be detected. The latter test should help to still controversy about minor joint leaks on a hydrostatic test, if the casing is proven at rated pressure on gas. [Pg.414]

To be able to test according to accepted test codes which may be impractical or impossible at the site. [Pg.416]

Wong, W., Acceptance Testing of Centrifugal Compressors and the Application of ASME Power Test Code PTC 10-1965, 1. Mech. Conference Publication 1978-1, Mechanical Engineering Publications, Ltd., for the Institution of Mechanical Engineers, 1978, pp, 123-129. [Pg.436]

Bultzo, C., Turbomachinery Acceptance Testing for Conformance to Design Criteria and Overall Performance Evaluation, ASME Petroleum Division Conference, New Orleans, LA, September 14, 1972... [Pg.437]

MULTIPLE CHEMICAL SENSITIVITY An acquired disorder characterized by recurrent symptoms, referable to multiple organ systems, occurring in response to many chemically-unrelated compounds at doses far below those established in the general population to cause harmful effects. No single widely accepted test of physiologic function can be shown to coiTelate with symptoms. [Pg.16]

Acceptance Testing Test procedures to determine the water cooling capacity of towers. Instrumentation used and measurement procedures should be those recommended by the Cooling Tower Institute (CTI) in its "Acceptant Text Procedures. "... [Pg.89]

Rupture discs are typically manufactured to order, where each order represents a lot. The ASME Code defines three mediods of acceptance testing for rupture discs. The most common method requires dial at least two discs from the lot be burst tested at the specified disc temperature. The results of these tests must fall within the rupture tolerance. Table 12-5 shows the changes between the old requirements and the new sizing methodology and certification process. [Pg.983]

The quality of the product can be verified by you witnessing the final acceptance tests and inspections on the subcontractor s premises. (If you don t possess the necessary equipment or skill to carry out product verification, this method is an economic compromise and should yield as much confidence in the product as the previous methods. You do, however, need to recognize that your presence on the subcontractor s premises may affect the results. They may omit tests which are problematical or your presence may cause them to be particularly diligent, a stance which may not be maintained when you are not present.)... [Pg.321]

It is important that you inform the subcontractor through the contract of how the product or service will be accepted. Will it be as a result of receipt inspection at the specified destination or as a result of acceptance tests witnessed on site by your authorized representative These details need to be specified at the tendering stage so that the subcontractor can make provision in the quotation to support any of your activities on site. If you have invoked ISO 9001 in the subcontract, you are protected by clause 4.6.4.2. If you have not, you need to specify a similar provision in your subcontract, otherwise you may lose the right to reject the product later. There is no requirement for you to document your proposal to verify product at the subcontractor s premises but such a plan would indeed be a useful section in any quality plan that you produced. (See also Control of subcontractors in this chapter.)... [Pg.329]

Transport and delivery of materials and equipment Inspection of equipment entering the site Storage of equipment awaiting installation Storage of spares and consumables Installation of equipment Commissioning tests Acceptance tests... [Pg.349]

When equipment or plant is taken out of service, either for maintenance or for repair, it should not be re-introduced into service without being subject to formal acceptance tests that are designed to verify that it meets your declared standard operating conditions. Your procedures need to provide for such activities and for records of the tests to be maintained. [Pg.358]

The key phrase in this clause is or otherwise verified as it allows you to receive product into your company and straight onto the production line if you have verified that it conforms to the specified requirements before it arrives. An example of this is where you have performed acceptance tests or witnessed tests on the supplier s premises. You may also have obtained sufficient confidence in your supplier that you can operate a Just-in-time arrangement but you must be able to show that you have a continuous monitoring program which informs you of the supplier s performance. [Pg.379]

To accomplish this, you need to specify either in the quality plan or the documented procedures, the inspections and tests you intend to carry out to verify that the product meets specified requirements. In Part 2 Chapter 4 there is a description of a Design Verification Plan and this includes a specification of the tests and inspections to be performed on each production item as a means of ensuring that the qualified design standard is being maintained. This requires that you produce something like an Acceptance Test Plan which contains, as appropriate, some or all of the following ... [Pg.386]

There is a need to have all accepted test standards require that deflagration testing he done with a restricted outlet. More research is needed to evaluate the effect of restriction size and location on flame arrester effectiveness. Not all test standards require this for deflagration testing. This is important since protected side restrictions severely reduce flame arrester capability. [Pg.183]

FM will condnct tests at their own test facilities nsnally only for deflagration flame arresters, following their Class 6061 test procednre. They will also observe and approve tests done at a hame arrester mannfactnrer s own test facility for both dehagration and detonation type hame arresters. For detonation hame arresters FM will accept tests that are done in accor-... [Pg.191]

Abnahmet/. decrease, decline, drop, diminution taking off or away acceptance sale, -ver-such, m. acceptance test, tbnarben, v.t. buff scrape, tbnehmbar a. removable, detachable, tbnehmen, v.t. take off, take away, remove accept infer. — v.i. decrease, decline, diminish, wane. [Pg.7]

Additional detailed information is available from the Cooling Tower Institute, including ATF-105 Acceptance Test Procedure for Water-Cooling Towers, STD-101 CTI Grades of Redwood Lumber [31], STD-102 Structural Design Data [70], and TSC-302 Cooling Tower Wood Maintenance [16],... [Pg.383]

Acceptance Test Procedure for Water-Gooling Towers, ATP-105, Cooling Tower Institute, Palo Alto, Calif. [Pg.411]

Class A—An insulation system that, by experience or accepted test, can be shown to have suitable thermal endurance when operating at the limiting Class A temperature specified in the temperature rise standard for the machine under consideration. [Pg.655]


See other pages where Acceptance test is mentioned: [Pg.79]    [Pg.384]    [Pg.451]    [Pg.410]    [Pg.517]    [Pg.133]    [Pg.298]    [Pg.422]    [Pg.67]    [Pg.12]    [Pg.266]    [Pg.531]    [Pg.181]    [Pg.317]    [Pg.278]   
See also in sourсe #XX -- [ Pg.375 ]




SEARCH



Acceptance Tests for PET Scanners

Acceptance test plan

Acceptance testing

Acceptance testing

Acceptance testing definition

Acceptance testing overview

Acceptance tests scatter fraction

Acceptance tests sensitivity

Assembly process Acceptance testing

Corrosion acceptance testing

Criteria for acceptable performance of laboratories in proficiency testing

Design acceptance tests

Factory acceptance test , Good

Factory acceptance testing

Factory acceptance testing (FAT)

Factory acceptance tests

Field Tests for Minimum Acceptable Throughput

Installation acceptance testing

Plant Testing, Acceptance, and Commissioning Instructions

Pre-start-up acceptance tests

Safety requirement specification factory acceptance test

Screen Tests and Product Acceptance

Site acceptance tests

Supplier acceptance testing

Testing acceptance tests

Testing and Acceptance

Testing technologies user acceptance

User Acceptance Testing

Worker acceptance, tests

© 2024 chempedia.info