Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Preliminary assessment

Since we have begun this analysis during the concept phase of the project life cycle, it would be prudent to develop a preliminary hazard list of basic safety concerns associated with the project concept. Then, as the project moves into the design phase, a PHA can be performed based upon the information contained on the PHL. [Pg.81]


M. A. DeLuchi, E. D. Laison, and R. H. WiUiams, Hjdrogen andMethanol Production and Use in Fuel Cell andintemal Combustion Engine Vehicles—-A preliminary Assessment, Vol. 12, Solid Fuel Conversion for the Transportation Sector, ASME, Fuels and Combustion Technologies Division, New York, 1991, pp. 55-70. [Pg.435]

All the PMBs are Hsted on the U.S. EPA s Toxic Substances Control Act NonConfidential Chemical Substances Inventory (Table 8). In the early to mid-1980s, pseudocumene, mesitylene, hemimellitene, and trimethylbenzene were coveted by TSCA Section 8(a) Preliminary Assessment Information Rule (PAIR) reporting requirements (22) and by TSCA Section 8(d) for health and safety data (23). Mesitylene is the subject of a test rule subacute oral toxicity and subchtonic oral toxicity in tats were underway in 1994 (24). The Safe Drinking Water Act (SDWA) allows monitoring for pseudocumene and mesitylene at the discretion of the State (25). Of the PMBs, only pseudocumene is subject to SARA Tide III section 313 annual release reporting (26). [Pg.509]

For a new produc4, the ratio of manufacturing expense to sales price Ch e/cs should be compared with the ratio of total manufacturing cost or expense to sales revenue for the company as a whole. If the ratio Ch e/cs is less than or equal to the ratio for the company, then the proposed sales price appears to be reasonable and the product is probably commerci ly viable. This comparison is, of course, used only as an approximate guide in preliminary assessments. [Pg.853]

In addition, the reactions occurring at the impressed current cathode should be heeded. As an example. Fig. 21-7 shows the electrochemical behavior of a stainless steel in flowing 98% H2SO4 at various temperatures. The passivating current density and the protection current requirement increase with increased temperature, while the passive range narrows. Preliminary assessments for a potential-controlled installation can be deduced from such curves. [Pg.476]

The determination and evaluation of potentiodynamic curves can only be used as a preliminary assessment of corrosion behavior. The protection current requirement and the limiting value for the potential control can only be determined from so-called chronopotentiostatic experiments as in DIN 50918. in systems that react with spontaneous activation after the protection current is switched off or there is a change in the operating conditions, quick-acting protection current devices must be used. Figure 8-6 shows the circuit diagram for such a potentiostat. [Pg.477]

In order to make a preliminary assessment of the importance of turbine cooling in cycle analysis, the real gas calculations of a simple open uncooled cycle, carried out in Chapter 3 for various pressure ratios and combustion temperatures, are now repeated with single step turbine cooling, i.e. including cooling of the first turbine row, the stationary nozzle guide vanes. [Pg.65]

The preliminary assessment of noncarcinogcnic risk associated with a hazardous waste site as recommended by the USEPA is typically calculated in four major steps (6). [Pg.332]

Sources of tliis information include site descriptions mid data from the preliminary assessment (PA), site inspection (SI), and remedial investigation (RI) reports. Other sources include local soil sur eys, wetland maps, aerial photographs, and reports by the National Oceanograpliic and Atmospheric Association (NOAA) and tlie U.S. Geological Sur ey (USGS). One cmi also consult with appropriate tecluiical e.xperts (e.g., hydrogeologists, air modelers) as needed to cluuacterize tlie site. [Pg.355]

Adler, K. Grant, M. and Scliroeer, W. (1998). Emissions Reduction Potential of the Congestion Mitigation and Air Ciuahty Improvement Program A Preliminary Assessment. Transportation Research Record 1641. Transportation Research Board. Washington, ITC National Research Council. [Pg.1153]

Heede, H. R. (198.S). A Preliminary Assessment of Federal Energy Subsidies in FYl984. Washington, DC Tesdmony submitted to the Subcommittee on Energy and Agricultural Taxation, Committee on Finance, United States Senate, June 21. [Pg.1171]

It is seen that, although the dimensions and particle sizes may not be precisely matched, all three columns are of a size closely similar to those commercially available with, perhaps, the exception of the long high efficiency column. The small 3 cm column is excellent for the preliminary assessment of a sample. As a result of its size it does not use large volumes of solvent and can be quickly reconditioned after a separation in readiness for the next run. It is very convenient for choosing the best phase system in method development. The other columns would be chosen on a basis of the efficiency required to separate the critical pair in the reduced chromatogram of the sample for analysis. [Pg.116]

The applicant must submit complete copies of dossier to the EMEA, and directly to each of the rapporteurs. The EMEA are allowed 14 days to validate the application to ensure that it is complete and in accordance with the regulations, after which the rapporteurs can commence the scientific evaluation. The review process involves considerable feedback between the rapporteurs, the CHMP and the applicant, central to which can be achieving agreement on the final text of the SPC, labels and leaflet. The rapporteurs are required to deliver preliminary assessment reports to the CHMP within 80 days of the start of the review process. The applicant is also copied on the report. Over the next 40 days issues raised in... [Pg.119]

The decentralised procedure can be used in cases where the product has never been authorised in any of the Member States, and the applicant wishes to obtain a license in a number of states simultaneously. The applicant must submit applications with the complete dossier to the Competent Authorities of each of the Member States where authorisation is desired. A single Member State should be chosen as the reference state to undertake the scientific assessment ofthe complete dossier, while the other states are designated as concerned states. The review process has many parallels vhth the centralised procedure, in that similar time lines exist, the reference State plays the role ofthe rapporteur, and the concerned States replace the CHMP. Once all States have validated that the dossiers are complete, the reference State is allowed 70 days to review the dossier and prepare a preliminary assessment report, which is circulated to the concerned Member States and the applicant. Comments from the concerned Member States and applicant responses are collected so that by day 120 the reference State may issue a draft assessment report together vhth draft SPC, label and leaflet texts. The clock may be stopped until requested responses from the applicant are received. The application then enters the second step in the assessment process, during which all the concerned Member States consider the... [Pg.121]

I Scientific Review (Rapporteurs) Preliminary Assessment Reports (Rapporteurs) ---------------- ... [Pg.122]

Preliminary assessment of the mentee s learning and development needs. Creating an initial development plan will be one of the most invaluable types of data with regard to matching mentors and mentees. Data regarding the mentee s development needs could initially be collated from, for example, the mentee s self-assessment and/or the assessment of his or her immediate supervisor or manager. [Pg.234]

The critical observation from the above is that installation factors are complex for small plants, and particularly when trying to relate B2C plant costs. Attempts to scale and interrelate costs using simple exponential methods of single installation factors for the plant are unlikely to be sufficiently accurate, even for preliminary assessment. [Pg.318]

Squillace PI, JS Zogorski, WG Wilber, CV Price (1996) Preliminary assessment of the occurrence and possible sources of MTBE in groundwater in the United States, 1993-1994. Environ Sci Technol 30 1721-1730. [Pg.690]

Make a preliminary assessment of each of the combinations of low and high levels for the purpose of verifying that the individual combinations of levels are suitable for experimental implementation Some combinations may not be technically feasible If some combinations are not acceptable, revise the ranges of the factors until each combination of levels in the 2 factorial table can be accepted as a suitable test condition ... [Pg.70]

Sprovieri F, Pirrone N. 2000. A preliminary assessment of mercury levels in the Antarctic and Arctic troposphere. J Aerosol Sci 31 757-758. [Pg.46]

Concerning indicator species, as a preliminary assessment in describing the wildlife component of a mercury monitoring network, based on criteria evaluated in Section 5.5 and studies cited herein, additional concerns noted above, and professional judgment of the authors, candidate wildlife species for inclusion in such a network have been selected and are indicated in Table 5.4. [Pg.163]

Ihnat M (1990) Preliminary assessment of homogeneity of new candidate agricultural/food reference materials. Fresenius J Anal Chem 338 455-460. [Pg.231]

Morrison JL, Richardson JM (1996) Preliminary assessment of barium determination in Zinn-waldite ZW-C by X-ray fluorescence spectrometry. Geostds Newslett 20 65-69. [Pg.233]

Following preliminary assessment of the Medicinal Chemistry synthesis, the decision was made to modify the synthesis for scale-up to address some of the issues identified but, without a ready alternative for the double bond introduction, (PhSeO)20 would be used in the first scale-up to kilogram scale. [Pg.81]

Once a potential release has been discovered, the information is entered into the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS), a computerized database used to track hazardous substance sites. After being entered into CERCLIS, each site undergoes a preliminary assessment (PA) to determine whether the site poses a potential hazard and whether further action is necessary. If the threat is immediate, a removal action may be conducted. [Pg.468]

Preliminary assessments have been conducted at more than 31,000 sites reported as possible sources of contamination. In 1990 there were over 1100 sites (presenting the greatest health risk and hence eligible for Superfund reimbursement) on the NPL.8-9 The NCP has outlined the level of cleanup necessary at Superfund sites and established the basic procedures that have to be followed for the discovery, notification, response, and remediation of the hazardous waste sites.10... [Pg.591]

Cost correlations for vessels are normally expressed in terms of the mass of the vessel. This means that not only a preliminary sizing of the vessel is required but also a preliminary assessment of the mechanical design9,10. [Pg.19]

Harrad S, Wijesekera R, Hunter S, Halliwell C, Baker R (2004) Preliminary assessment of U.K. human dietary and inhalation exposure to polybrominated diphenyl ethers. Environ Sci Technol 38(8) 2345-2350. doi 10.1021/es0301121... [Pg.311]

Electrochemical tests in half-cells allow the preliminary assessment of the WUT carbon as well as of the impact of grinding on the electrochemical performance. The data from the chart on the Figure 5 indicate that the material has high reversible capacity (similar to the capacities of the commercial graphites described earlier). [Pg.213]

Law, F.C.P. and J.A. Gudaitis. 1994. A preliminary assessment of human health risks due to consumption of fish contaminated by dioxins and furans in Fraser and Thompson Rivers. Chemosphere 28 1079-1086. [Pg.1063]

Brown, J.A., P.H. Johansen, P.W. Colgan, and R.A. Mathers. 1987. Impairment of early feeding behavior of largemouth bass by pentachlorophenol exposure a preliminary assessment. Trans. Amer. Fish. Soc. 116 71-78. [Pg.1226]

National Oceanic and Atmospheric Administration (NOAA). 1987. National Status and Trends Programs for Marine Environmental Quality. Progress Report and Preliminary Assessment of Findings of the Benthic Surveillance Project — 1984. NOAA, Rockville, MD. 81 pp. [Pg.1334]

A preliminary assessment of a process for the hydrodealkylation of toluene is to be made. The reaction involved is ... [Pg.249]

An aromatic hydrocarbon feedstock consisting mainly of m-xylene is to be isomerised catalytically in a process for the production of / -xylene. The product from the reactor consists of a mixture of p-xylene, m-xylene, o-xylene and ethylbenzene. As part of a preliminary assessment of the process, calculate the composition of this mixture if equilibrium were established over the catalyst at 730 K. [Pg.253]

Smith, RN. et al., Preliminary assessment of perchlorate in ecological receptors at the Longhorn Army Ammunition Plant (LHAAP), Karnack, Texas, Ecotoxicology, 10, 305, 2001. [Pg.398]

Lancaster, N. 2002. Flux of aeolian sediment in the McMurdo Dry Valleys, Antarctica a preliminary assessment. Arctic, Antarctic, and Alpine Research, 34, 318-323. [Pg.210]


See other pages where Preliminary assessment is mentioned: [Pg.2717]    [Pg.363]    [Pg.543]    [Pg.1182]    [Pg.123]    [Pg.479]    [Pg.477]    [Pg.596]    [Pg.390]    [Pg.3]    [Pg.2111]    [Pg.503]    [Pg.31]    [Pg.1632]   
See also in sourсe #XX -- [ Pg.468 , Pg.1027 , Pg.1110 ]

See also in sourсe #XX -- [ Pg.159 , Pg.160 ]




SEARCH



Functional hazard analysis Preliminary System Safety Assessment

PRELIMINARY AND FINAL SAFETY ASSESSMENT

Preliminary

Preliminary Aircraft Safety Assessment

Preliminary Assessment Information

Preliminary Assessment Information Rule

Preliminary System Safety Assessment

Preliminary System Safety Assessment PSSA)

Preliminary steps in conducting risk assessment

Preliminary subcontractor assessment

Risk Assessment Code preliminary hazard analysis

Risk assessment codes preliminary

Risk assessment preliminary hazard analysis

The Preliminary Assessment Information Rule—PAIR

© 2024 chempedia.info