Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

System installers

Several parameters come into the relation between density and equivalence ratio. Generally, the variations act in the following sense a too-dense motor fuel results in too lean a mixture causing a potential unstable operation a motor fuel that is too light causes a rich mixture that generates greater pollution from unburned material. These problems are usually minimized by the widespread use of closed loop fuel-air ratio control systems installed on new vehicles with catalytic converters. [Pg.188]

Prior to moving the rig and all auxiliary equipment the site will have to be cleared of vegetation and levelled. To protect against possible spills of hydrocarbons or chemicals the surface area of a location should be coated with plastic lining and a closed draining system installed. Site management should ensure that any pollutant is trapped and properly disposed of. [Pg.43]

The cost of implementing CAO depends of course on the system installed, but for a new field development is likely to be in the order of 1 -5% of the project capital expenditure, plus 1-5% of the annual operating expenditure. [Pg.282]

The specific results of well over 1 year of continued monitoring will be discussed in a second paper. It is pointed out here that the AEBIL monitoring system installed in the power plant for the above monitoring purposes has efficiently and continuedly performed during this time interval, with no instrumentation reliability problems. [Pg.71]

The configuration of the AEBIL system, installed in an ENEL power plant can be summarized as follows ... [Pg.77]

The AEBIL acoustic emission monitoring system installed on site has shown a good level of functional reliability no instrumentation failure is to be recorded in over 1 year of continuous in-plant operation. [Pg.79]

Three demonstrations of the LIMB technology have been carried out. The first was a privately funded project in the 75 MWt Boiler 405 at the No. 4 AC Station of Inland Steel Industries, Inc. (56). By injecting 70 wt % minus 200 mesh (74 -lm) limestone, approximately 40% SO2 removal was achieved at a Ca S ratio of 3. This rose to 50% removal when the Ca S ratio was increased to 4. The second LIMB demonstration was the backup desulfurization system installed by B W as part of the relocation, repowering, and reconfiguration of the PCS power plant (46). [Pg.261]

Design ventilation system to keep flammable concentration below lower flammable limit Provide on-line flammable gas detection and activation of inerting system Install automatic sprinkler system Install deflagration vents... [Pg.50]

Install depressurizing system Install emergency relief device Develop emergency response plan... [Pg.59]

San Diego Gas Electric s system was originally installed as a research project. The intent of the research project was to test the hardware in this application, test the feasibility of operating such a system remotely with no local operators, and to prove the economics. Similar systems had been installed within process plants where operators were present to start and stop the system and monitor its operation. However, this was the first system installed on a natural gas transmission system with completely remote operation. [Pg.471]

At the Lipari Landfill site in New Jersey, the gas venting system installed in 1983 consisted of two underground 4-inch (10-cm) perforated PVC pipes and five vent risers. Two parallel PVC pipes were installed 200 feet apart prior to cap emplacement during the period of wall construction and were placed about 3 feet beneath the finished grade. The vent risers were connected to the buried manifold pipes and consisted of open pipe installed perpendicular to the underground pipes and the ground surface. Filters were not attached to the riser exit points (U.S. EPA, 1987). [Pg.134]

Specify the responsibility of each trade, system installer, or equipment supplier. [Pg.39]

For an existing process plant, the designer has the opportunity to take measurements of the fume or plume flow rates in the field. There are two basic approaches which can be adopted. For the first approach, the fume source can be totally enclosed, and a temporary duct and fan system installed to capture the contaminant. For this approach, standard techniques can be used to measure gas flow rates, gas compositions, gas temperatures, and fume loadings. From the collected fume samples, the physical and chemical characteristics can be established using standard techniques. For most applications, this approach is not practical and not very cost effec tive. For the second approach, one of three field measurement techniques, described next, can be used to evaluate plume flow rates and source heat fl uxes. [Pg.1269]

Product specifications should specify requirements for the manufacture, assembly, and installation of the product in a manner that provides acceptance criteria for inspection and test. They may be written specifications, engineering drawings, diagrams, inspection and test specifications, and schematics. With complex products you may need a hierarchy of documents from system drawings showing the system installation to component drawings for piece-part manufacture. Where there are several documents that make up the product specification there should be an overall listing that relates documents to one another. [Pg.252]

When planning an on-site review, worit to be sure that your visit will not be too disruptive. You do not want your visit to distract people from system installation and become the cause of a delay, so tiy to keep your visit brief. You should not need more than a day at a time on site, and should only do on-site reviews infrequently. [Pg.180]

Key technologies that are used in modern lighting include electronic ballasts, more efficient tubular fluorescent lamps, compact fluorescent lamps, and lighting controls. Fluorescent lighting is the predominant lighting system installed in post-1980 buildings and is used in 71 percent of floor space. Specialty retail stores use a combination of fluorescent and... [Pg.195]

Electric utilities did have a vested financial interest in heat pumps, since most designs used electricity for heating and cooling. But utilities were not manufacturers or consumers. Despite their attempts to promote heat pumps with articles and showcase system installations, they failed to create the demand for the product. [Pg.610]

The choice of access-control technology depends upon the level of security to be achieved, number of users and traffic at peak periods, etc. Proper design of the system is critical to its performance (and user acceptance), and reliability and expert advice should be obtained from equipment manufacturers and system installers. [Pg.169]

Improved reliability of equipment, but much still to be done Maintenance costs often too high Desire to go more automatic and on-line Awareness that system installation is expensive Continuing interest in new techniques... [Pg.1131]

A number of industrial applications have been described including successful subsea installation . Double layer activation has been used in the laboratory for estimation of both shape and growth of pits in stainless steel. Advantages of TLA are that (a) the concept is easily understood, (b) interpretation is relatively easy and (c) the system installation can be non-invasive. [Pg.1141]

Another operational problem that may develop concerns multiple LP steam-heating system installations in which an imbalance in waterside chemistry results in low TDS/chemical inhibitor in one boiler and high TDS/chemical inhibitor in a second unit. [Pg.184]

Figure 2. The natural air draft system installed inside the aerobic tank of the constructed wetland. Figure 2. The natural air draft system installed inside the aerobic tank of the constructed wetland.
T)man (2005) reported on a case study of a CHP (combined heat and power) system installed at a dairy facility in Ireland. The CHP system generates electricity and uses the generated heat to provide steam. The overall efficiency of the process is 58%. Reported energy savings were 1.7M euros/year with reduction of 27,920 tons of CO2. [Pg.78]

Software producers must fulfill the requirements for development, testing, and documentation. When the user is confident that these requirements have been met, and the system functions adequately to fulfill his or her needs, the user must perform validation prior to placing the software in service. An analytical laboratory is an example of an end-user that conducts testing prior to software/computer system installation. [Pg.1058]

Guthrie15 listed the cost of a water-treatment system. However, it is not known what this included. From his data the cost of the complete water-treatment system, installed, was estimated as 27,300. Since the equipment costs are needed for certain estimates, they had to be obtained from the installed cost. It was assumed that the major cost in constructing a sand filter (see Chapter 16) would be on-site labor. This gives an F.O.B. price of around 5,000 for the sand filter. [Pg.268]

Early in the program, critical components (e.g.,the turbomolecular pump) and circuit boards were tested for their ability to survive neutron and gamma irradiation rates and doses similar to those that would be received from exposure to the detonation of a tactical nuclear device. All components were powered up at the start of the gamma irradiation tests but not during the neutron irradiation tests. Circuit boards were protected by circumvention circuits that powered down critical circuits in 10 to lOOps upon detecting radiation. All components survived the nuclear radiation tests. This unusual performance was noted with positive commendations by the staff at the White Sands Missile Range, where the tests were performed. Tests of the fully integrated CBMS II system, installed in a reconnaissance vehicle, will be conducted in the future. [Pg.85]

A sprinkler system installed in a home that is under construction will cost about 1.5% of the total building cost. The same system, installed after the home is built, is about 4% of the total building cost. How much would a homeowner save by installing a sprinkler system in a 150,000 home while the home is still under... [Pg.91]

Termination Increase Firefighting equipment and procedures Relief systems Sprinkler systems Installation of check and emergency shutoff valves... [Pg.19]


See other pages where System installers is mentioned: [Pg.382]    [Pg.432]    [Pg.516]    [Pg.31]    [Pg.651]    [Pg.326]    [Pg.185]    [Pg.345]    [Pg.610]    [Pg.215]    [Pg.1017]    [Pg.371]    [Pg.381]    [Pg.124]    [Pg.432]    [Pg.80]    [Pg.384]    [Pg.462]    [Pg.530]    [Pg.554]    [Pg.25]    [Pg.107]   
See also in sourсe #XX -- [ Pg.105 , Pg.152 , Pg.168 , Pg.169 ]




SEARCH



Automatic fire detection installations systems

Baghouses systems installation

Electrical installations and wiring systems

Fire-fighting installations, fixed sprinkler systems

Galvanic anode system installation

Hydraulic systems installation

Install Mixing Systems

Install a Blameless Reporting System

Installation and Types of Anode System

Installation carbon dioxide systems

Installation clean agent systems

Installation cost, solar systems

Installation cost, solar systems requirements

Installation foam active protective systems

Installation of wiring systems and enclosures

Installation sprinkler systems

Installation systems

Installation systems

Installation water spray systems

Installation water supply systems

Installation-based Inventory systems

Leak monitoring system installation

Piping system installation

Protection systems installation

Ship installed chemical system

Support systems installation/removal

© 2024 chempedia.info