System installation

Measurement Requirements. Any analysis of measurement requirements must begin with consideration of the particular accuracy, repeatabihty, and range needed. Depending on the appHcation, other measurement considerations might be the speed of system response and the pressure drop across the flow meter. For control appHcations repeatabihty may be the principal criterion conversely for critical measurements, the total installed system accuracy should be considered. This latter includes the accuracy of the flow meter and associated readout devices as well as the effects of piping, temperature, pressure, and fluid density. The accuracy of the system may also relate to the required measurement range. [Pg.56]

Economic Considerations. The principal economic consideration is, of course, total installed system cost, including the initial cost of the flow primary, flow secondary, and related ancillary equipment as well as material and labor required for installation. Other typical considerations are operating costs and the requirements for scheduled maintenance. An economic factor of increasing importance is the cost of disposal at the end of normal flow meter service life. This may involve meter decontamination if hazardous fluids have been measured. [Pg.56]

In applying power recovery, three basic problems are (1) hmitations in designing equipment to recover the power, (2) operating reluctance to consider rotating equipment that is not absolutely necessaiy, and (3) the way in which the economics of the installed system is evaluated. It is important to recognize that there has always been an opera-... [Pg.2524]

Install system to prevent unauthorized software access and changes... [Pg.123]

The second phase, becoming effective January 1, 2000, will require approximately 2000 utilities to reduce their emissions to a level equivalent to the product of an emissions rate of (1.2 lbs of S02/mm Btu) X (the average mm Btu of their 1985-1987 fuel use). In both phases, affected sources will be required to install systems that continuously monitor emissions in order to track progress and assure compliance. [Pg.401]

Agents must be compatible with the process, with each other, and with any other installed systems. [Pg.196]

Figure 23. Ufe-cycle design - installed system at southern Texas site (treating phenol in a brine aquifer) (Nyer, 1987). Figure 23. Ufe-cycle design - installed system at southern Texas site (treating phenol in a brine aquifer) (Nyer, 1987).
Are installed systems consistent with the company s goals ... [Pg.180]

In addition, the plant engineer is responsible for testing newly installed systems to assure that they comply with procurement and performance specifications. [Pg.14]

Time-domain data are presented with amplitude as the vertical axis and elapsed time as the horizontal axis. Time-domain profiles are the sum of all vibration components (i.e., frequencies, impacts, and other transients) that are present in the machine-train and its installed system. Time traces include all frequency components, but the individual components are more difficult to isolate than with frequency-domain data. [Pg.683]

While frequency-domain data analysis is much easier to learn than time-domain data analysis, it does not provide the ability to isolate and identify all incipient problems within the machine or its installed system. Because of this. [Pg.700]

It follows that if the planned maintenance system is to be shown as effective, the number of breakdowns reported must reduce, irrespective as to whether it be a manual or computer system. A satisfactorily installed system allows the engineer to plan his department s work and, when necessary, action emergency items or additional work, without their being detrimental to the department s overall performance. [Pg.789]

More accurate measurement of air flow can be achieved with nozzles or orifice plates. In such cases, the measuring device imposes a considerable resistance to the air flow, so that a compensating fan is required. This method is not applicable to an installed system and is used mainly as a development tool for factory-built packages, or for fan testing. Details of these test methods will be found in BS.1042, BS.2852, and ASHRAE 16-83. [Pg.277]

Is there a list of previously installed systems available ... [Pg.1044]

NMR microscopy is ultimately an innovative method of research and it is not surprising that most of the commercially installed systems, approximately 80%, are installed in public scientific research centers, where new applications are continuously being developed. The method is not particularly widely distributed in industry, where standardized methods are more often used. However, NMR microscopy is mainly used in the pharmaceutical industry for the development of new drugs, in the food industry for the development of new types of food, in the chemical industry for creating and characterizing new materials and in the polymer industry, e.g., for creating new mixtures for tires. [Pg.64]

The first bullet indicates that the NFPA standards should be used to determine the fire water requirements for a facility. The NFPA standards do not define when a system is required. The first bullet does not achieve the result of defining when protection is necessary. In addition, the level of protection needed for a process facility is not covered by the cited NFPA standards. The NFPA standards simply describe howto design and install system components. [Pg.23]

Several different materials and installation systems are available and include various types of proprietary materials, plasters containing perlite or ver-miculite, concrete mixtures, or lightweight concretes. The selected material and installation system, encasement, or surface application should provide protection for the expected fire duration. For more information refer to Chapter 7, Section 7.3.2. [Pg.257]

Fire resistant insulating material can provide passive protection for both vertical and horizontal structural steel members. The level or rating of fire resistance should be consistent to the expected fire duration. Where only fire resistant insulating material will be used, the material and its installation system should be specified to have a 2- to 3-hour fire rating (UL 1709). In applications using a combination of fixed water spray or sprinkler protection and fire resistant insulation, a 1- to 2-hour fire rating (UL 1709) is frequently specified for the fireproofing. [Pg.257]

Figures 7.9(a) and 7.9(b) show two different approaches to the samphng of the dissolution baths prior to analysis. Figure 7.9(a) shows the most commonly installed system, which uses a series of spectroscopic cells, one to coincide with the hath being sampled. The system uses a peristaltic pump to withdraw the sample through the pump tubing and into... Figures 7.9(a) and 7.9(b) show two different approaches to the samphng of the dissolution baths prior to analysis. Figure 7.9(a) shows the most commonly installed system, which uses a series of spectroscopic cells, one to coincide with the hath being sampled. The system uses a peristaltic pump to withdraw the sample through the pump tubing and into...
Allows for easy installation systems are skid or trailer mounted. [Pg.888]

The SQI system was first used in the early 1970s and has since been used in over 125 installed systems around the world. This technology is currently commercially available. According to the vendor, SQI technology offers the following advantages ... [Pg.1074]

Conducts required water supply tests, including, but not limited to, hydrants and installed systems in structures and on apparatus. [Pg.26]

As part of the installation system, drawings and diagrams should be generated. They are an absolute must not only for setting up a network and networked systems, but even more important, for maintaining them. They should be part of the IQ documents and should include the following diagrams ... [Pg.269]

The technology to be applied for removing arsenic solids is considered state-of-the-art. A flow diagram of the Installed system is depicted in Figure 3-1. The arsenic removal system will be located within HP s slurry room as indicated in Figure 3-2. This was the same location where pilot studies were carried out. [Pg.359]

The payback periods of alternative energy installations range from 5 to 20 years, with solar hot water systems being the least expensive and solar-hydrogen systems the most. The payback period for installing a photovoltaic (PV) electricity-generating system in California is about 15 years. This number is based on a home with a monthly electricity bill of 100, an installed system cost of 50,000, and a rebate plus tax credit of 20,000. If the monthly electricity bill is 250, the payback period drops to about 8 years, and if one also considers the increase in the value of the home, the payback period can drop to about 4 years. These payback periods were calculated on the assumption that the electricity cost in the area is 12 /kWh, and it will not rise. As was mentioned earlier, this cost in my household in Connecticut is 18.9c /kWh and rising. [Pg.128]

It was necessary, because of economic restraints, to locate the americium extraction battery in the same canyon as the mainline PRF TBP extraction equipment. Compromises in americium extraction equipment design and hydraulics were mandated to accommodate the americium extraction system in this existing facility. In particular, all the columns had to be shortened from the optimum heights recommended by the pilot plant studies. The hydraulics of the installed system were such that the organic flowrate to the extraction column (WE-1 Column) was inadequate with the result that the extraction factor was too low to permit quantitative extraction of all the 21tlAm. Furthermore, the combination of a short extraction column and a 1-inch air pulse leg sometimes led to a hydraulic upset whereby the entire column contents were lost recovery from such hydraulic upsets required an hour or more. [Pg.127]


See other pages where System installation is mentioned: [Pg.105]    [Pg.6]    [Pg.88]    [Pg.444]    [Pg.216]    [Pg.293]    [Pg.293]    [Pg.293]    [Pg.13]    [Pg.18]    [Pg.259]    [Pg.155]    [Pg.105]    [Pg.395]    [Pg.41]    [Pg.325]    [Pg.383]   
See also in sourсe #XX -- [ Pg.340 ]




SEARCH



Automatic fire detection installations systems

Baghouses systems installation

Electrical installations and wiring systems

Fire-fighting installations, fixed sprinkler systems

Galvanic anode system installation

Hydraulic systems installation

Install Mixing Systems

Install a Blameless Reporting System

Installation and Types of Anode System

Installation carbon dioxide systems

Installation clean agent systems

Installation cost, solar systems

Installation cost, solar systems requirements

Installation foam active protective systems

Installation of wiring systems and enclosures

Installation sprinkler systems

Installation water spray systems

Installation water supply systems

Installation-based Inventory systems

Leak monitoring system installation

Piping system installation

Protection systems installation

Ship installed chemical system

Support systems installation/removal

System installers

System installers