The next phases are detailed planning of restoration measures, planning of project assessment and project implementation. The final phase, utilization, includes maintenance measures, evaluation of project success, adaptive management and the communication of results. Throughout all phases of the project, the general political and societal framework conditions are taken into account. In short, project managers must deal with complex processes and consider the contextual analysis [7]. [Pg.250]

The team that will develop the enterprise business model is assembled and briefed on the purpose, scope, and framework of the model. The team members may be from various parts of the enterprise, typically including representatives from the key business processes (strategic, core, and resource management). The internal team may be supplemented by outside resources, as necessary (e.g., information specialists, process facilitators, and the like). A skilled project manager is appointed whose role is to ensure that the model-development effort is properly planned and completed on time and within budget. [Pg.33]

Before moving on from the design criteria to the detailed planning of engineering work, there are several project management systems and procedures which need to be in existence. These are simply standardized methods of working, which are indispensable in a team operation to promote efficiency and avoid omission, duplication, and confusion. The following are part of the basic framework. [Pg.33]

Example 6 During the concrete works the site manager informs the project management of a foundation that has been misplaced by one meter. After a revision of the framework plans released by the project management it is... [Pg.72]

The design and implementation of risk manag ent plans and frameworks will need to take into account the varying needs of a specific organization, as well as its particular objectives, context, structure, operations, processes, functions, projects, products, services, assets, and specific practices employed. It is intended that ISO 31000 2009 be used to complement risk management processes in existing and future standards. It provides a common approach in support of standards dealing with specific risks and/or sectors and does not replace those standards. [Pg.50]

A logical first item is overall planning and development of the framework for the RM project. It includes consideration of end-use requirements of the material and provision for scientific and technical management and execution of the project by trained, dedicated, critical scientists and technologists. End-use requirement dictates an assessment of the nature of the problem to be addressed by the product, the market requirements, the analytical methods to be served, the measurands, forms and concentrations to be certified, the level of certification required, and the quantities of starting and final product needed, leading to overall definition of the undertaking. [Pg.24]

The technical staff use the procedures as a framework within which they can conduct facility tests and assist with troubleshooting. Management may also use the procedures when planning large projects such as a turnaround or revamp. In such situations, it is likely that many temporary procedures will have to be written. [Pg.285]

A process model is an ideal definition of the software life cycle or of how actual software projects work. As such, they are prescriptions for how to organize the software engineering activity. In reality, actual software projects deviate from these models but the models nevertheless give both managers and engineers a framework in which to plan and schedule their work. [Pg.297]

The impact of all mitigating actions and sources of assurance are considered before calculating the residual risk. Reduction of each of likelihood and consequence depends on underlying subject issue and specific control considered. When the actual control plan is not correctly implemented, then the concerned person of the risk team and manager risk team need to think of improvement for action plan implementation and/or modify the framework for control action as warranted for the project. After completion of risk register, all risk should be populated in a consolidated risk matrix (or heat map) with risk IDs. Based on this, a report summary is put before management for consideration major points here are ... [Pg.17]

In a second step, PC Manufacturing Inc. needs to identify the time frame, resource and cost framework of the project. The minimum and maximum distance between activities is hereby determined. This can be done with different methods mentioned in chapter 12-Phase 5. There are different costs which need to be taken into consideration, which are labor costs, direct costs, indirect costs, contingency funds and management reserves. The resource analysis examines and reviews each phase and integrates the resources with the help of the resource plan. [Pg.304]

The first part, A decision framework for CDM, identifies the major areas for decision, the main participants that are involved, and the key interfaces for communication and co-ordination under the CDM Regulations. This framework has been developed to help those that are involved in refurbishment projects to clarify, understand and structure their roles, relationships and responsibilities, one with another, in the development and implementation of safety strategies, safety plans and safety actions. It is intended that the decision framework will be used to provide practical support to the management of health and safety risks during refurbishment projects. [Pg.6]

Each Gen-lV system requires challenging R D projects some are common to all whereas others are specific to the system. For example, the list of Gen-lV safety crosscut items comprises system optimization and safety assessment methodology, emergency planning methods, licensing and regulatory framework, radionuclide transport and dose assessment, and human factors. Additional R D areas of common interest are proposed as instrumentation and control, human machine interface, reactor physics and thermal-hydraulics, risk management, operation and maintenance. [Pg.255]

AH (Company C) companies, contractors and joint ventures under our operational control must manage HSSE and social performance in line with the Commitment and Policy, local laws and the terms of relevant permits and approvals. To help our staff and contractors to put the Commitment and Policy into practice we launched the HSSE and SP Control Framework. It includes a set of mandatory standards and manuals covering areas such as managing greenhouse gas emissions, impacts on biodiversity, road safety and security. We also include requirements for integrating environmental and social factors into the way we plan, design and take investment decisions on new projects. [Pg.36]


See other pages where Project management framework planning is mentioned: [Pg.111]    [Pg.495]    [Pg.90]    [Pg.433]    [Pg.382]    [Pg.861]    [Pg.884]    [Pg.1367]    [Pg.84]    [Pg.15]    [Pg.298]    [Pg.186]    [Pg.279]    [Pg.449]    [Pg.267]    [Pg.1276]    [Pg.2]    [Pg.47]    [Pg.127]    [Pg.201]    [Pg.83]    [Pg.25]    [Pg.1465]    [Pg.17]    [Pg.283]    [Pg.20]    [Pg.147]    [Pg.10]    [Pg.2224]    [Pg.197]    [Pg.36]   


SEARCH



Management Framework

Management plan

Management planning

Planning Framework

Project management

Project management framework

Project plan

Project planning

© 2024 chempedia.info