Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Project assessment

Resch, G., Ragwitz, M., Held, A. el al. (2006). Potentials and Cost for Renewable Electricity in Europe. A Report of the OPTRES-project Assessment and Optimisation of Renewable Energy Support Measures in the European Electricity Market. A Research Project Supported by the European Commission, DG TREN, Intelligent Energy for Europe - Programme (Contract No. E1E/04/073/S07.38567). Vienna. [Pg.166]

The next phases are detailed planning of restoration measures, planning of project assessment and project implementation. The final phase, utilization, includes maintenance measures, evaluation of project success, adaptive management and the communication of results. Throughout all phases of the project, the general political and societal framework conditions are taken into account. In short, project managers must deal with complex processes and consider the contextual analysis [7]. [Pg.250]

The tasks and members are described in Section 12.1. A very comprehensive project assessment checklist has been published [14] a simplified version is reproduced in Appendix A.2. It is not recommended to summarize the attractiveness of a project in a single number—and to reject project B, which totals 3.9 versus project A, which totals 3.8 points. It could just be that B had a higher-ranking in patentability, but a lower ranking in competitiveness of pricing than A Last but not least, the committee decides also about the abandonment of a project, once it becomes evident that the objectives cannot be reached. [Pg.63]

The link between country and project risks22 is quite often straightforward in permissible countries, project assessments use discount... [Pg.291]

The assessment of project activities may include performance and systems audits, data quality audits, peer review, PE samples, as appropriate for a given project. Assessment enables project personnel to identify field and laboratory problems or variances from the project scope and to implement timely corrective action. The findings and response actions originating from assessment activities are documented in reports to management. [Pg.79]

Each collected sample must have its own unique identification number. The project staff will use this number to track the sample in the field and at the home office during the project assessment phase. The laboratory will use this number for matching the sample and the requested analysis. The laboratory will enter the field sample IDs into the data base and assign the samples with laboratory IDs for internal tracking. Analytical results will be reported for the samples identified according to their field and laboratory IDs. [Pg.94]

Project assessment — This analysis aims to examine compounds of interest to specific projects to aid managers in making informed decisions about compounds. Many organizations assess active compounds resulting from HTS others perform analysis when a project focuses on a particular compound. [Pg.205]

The most convincing arguments are those which are developed from one s own considerations. Thus researchers should do their own market assessment to develop an opinion about the chances, risks and best applications of their approach. (If they don t like the term market assessment, they may call it "SPA" for "strategic project assessment" if this sound more reputable.) One needs no special skills to identify the major threats to and opportunities for a project. These are usually rather obvious, if some basic information is available and is considered critically. [Pg.12]

The remainder of this chapter deals with the elements of the overall process for an overall project. These include simulation project assessment, project planning, project execution, project reporting, and project utilization. [Pg.874]

An inference engine that guides the scientist through project assessment in a menu-driven dialog. [Pg.266]

Step 2. Analysis or solving the heat and material balances sizing and costing the equipment evaluating the economic worth of the project assessing the safety and environmental impact and analyzing the operability. [Pg.1336]

Finally, both assessments are combined, resulting in the assessment of the expected company-specific return versus the risk contribution to the overall portfolio. The analysis described could be done for several levels of a biopharmaceutical portfolio the overall portfolio or individual indications with a project assessment on the level of mechanism of action and/or targets. [Pg.1735]

Fischer, S.L., C.P. Koshland and J.A. Young. 2008. Producer Gas Projects in Jilin Province, China Technical Hurdles and the Need for Project Assessment. Energy for Sustainable Development, vol.12, no. 10, 78-81. [Pg.67]

The actual time when a membrane is changed depends very much on local power costs, the type of membrane and cell systems used. In the economic assessments for membrane installation high priority must be placed on obtaining the right system overall, including the costs of all the replacement operations and other maintenance activities and also the correct choice of current density. As current densities increase so do power consumptions, while capital costs reduce. However, higher current densities will tend to lead to shorter operating lives, so optimization studies are essential in any project assessment. [Pg.306]

Mayo L.H. Social Impact Evaluation—Some Implications of the Specific Decisional Context Approach for Anticipatory Project Assessment with special reference to Available Alternatives and to Techniques of Evaluating the Social Impacts of the Anticipated Effects of such Alternatives, Program of Policy Studies in Science and Technolc, The George Washington University, Occasional Paper No. 14, Washington, D.C. November 1972. [Pg.450]

Section 2 discusses the ECE curriculum structure and framework for theme-based mini-projects. Assessment of mini-projects is provided in Sect. 3. Impact of student learning and continuous improvement with curriculum design/modifications are described in Sect. 4. Conclusions of the paper are given in Sect. 5. [Pg.361]

The main objective of the course projects is to give more hands on experience to the students in addition to that knowledge gained in the regular course. Assessment is carried out as a part of CIE with a 20 % weightage. Table 1 shows the detailed review for the course project assessment with evaluation. [Pg.483]

The knowledge gained in cluster of subjects is incorporated to formulate and solve a real-hfe problem which is assessed by the instructor allotted and also by an expert review committee at various levels of project Table 2 shows the detailed reviews for the mini project assessment... [Pg.483]

The final project to be carried out during the final year of program is in two semesters. Table 3 shows the detailed review for the capstone project assessment. [Pg.483]

As part of the CEC Collaborative Project "Assessment, Architecture, and Performance of Industrial Programmable Electronic Systems with Particular Reference to Robotics Safety", a survey and analysis of existing standards and guidelines were performed. Participants in this part of the work came from ... [Pg.27]

This paper arose as part of the project "Assessment, Architecture, and Performance of Industrial Programmable Electronic Systems with Particular Reference to Robotics Safety . It presents the results of sub-project 4 the objectives of which were defined as follows sub-project 4 is concerned with revealing areas which will require further work in the future. Of particular interest are those areas in which programmable electronic systems play a part in overall safety. The work of sub-project 4 was to be based on those results achieved in the preceeding sub-projects. [Pg.36]

CEC Collaborative Project, Assessment, Architecture and Performance of Industrial Programmable Electronic Systems with particular reference to robotics safety. Final Report, 1986. [Pg.50]

Stage Project exploration Preliminary project assessment Project definition Design and procurement Construction and safety check Commissioning Normal operation... [Pg.67]


See other pages where Project assessment is mentioned: [Pg.265]    [Pg.251]    [Pg.712]    [Pg.200]    [Pg.114]    [Pg.367]    [Pg.141]    [Pg.23]    [Pg.178]    [Pg.267]    [Pg.315]    [Pg.185]    [Pg.364]    [Pg.484]    [Pg.485]    [Pg.622]    [Pg.550]    [Pg.35]    [Pg.253]    [Pg.164]    [Pg.292]    [Pg.128]    [Pg.636]    [Pg.183]    [Pg.78]   
See also in sourсe #XX -- [ Pg.11 , Pg.12 , Pg.13 ]




SEARCH



Arctic Seas Assessment Project

Assessing Risks in Projects and Processes

Lipid-Treatment Assessment Project

Lipid-Treatment Assessment Project L-TAP)

Project engineering functional safety assessment

Projects risk assessment

© 2024 chempedia.info