Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Facilities support

Steel piled jackets are the most common type of platform and are employed in a wide range of sea conditions, from the comparative calm of the South China Sea to the hostile Northern North Sea. Steel jackets are used in water depths of up to 150 metres and may support production facilities a further 50 metres above mean sea level. In deep water all the process and support facilities are normally supported on a single jacket, but in shallow seas it may be cheaper and safer to support drilling, production... [Pg.264]

Considerations regarding supporting facilities such as utility systems, water treatment, and heat transfer include ... [Pg.84]

The BSD can either shut down the entire facility, or it can be designed for two levels of shutdown. The first level shuts down equipment such as compressors, lean oil pumps, and direct fired heaters, and either shuts in the process or diverts flow around the process by closing inlet/outlet block valves and opening bypass valves. The second level shuts down the remaining utilities and support facilities, including generators and electrical feeds. [Pg.405]

The trainee will visit other departments in the head office to learn about the supporting facilities which are available such as non-destructive testing, metallurgical and failure analysis, hazard analysis and quality assurance. Emphasis is laid on safety, i.e. the integrity and safety of the plant in operation and on the surveyor s own personal safety. It is important that the trainee understands the techniques involved, particularly the limitations of their application. [Pg.145]

H. Kotsuki, T. Shimanouchi, R. Ohshima, and S. Fujiwara, Solvent-free organic reactions on silica gel supports. Facile transformation of epoxides to /i-halohy-drins with lithium halides, Tetrahedron, 54 (1998) 2709-2722. [Pg.86]

Control rooms have evolved into control buildings containing support services and people that may include a break area, restrooms, locker rooms, small laboratories, maintenance shops, conference/training room and offices. These control room/buildings continue to grow in size due to the consolidation of the control of several process units into one control room and the inclusion of their support facilities and staff. [Pg.301]

These support areas should be considered as a possible fire exposure to the control room especially since many of these areas are not continuously occupied. This section considers the control room and its support facilities together. [Pg.301]

Note that the original RFP required six additional sections, not included in excerpt IID Bibliographical Sketches, Budget, Current and Pending Support, Facilities, Supplementary Documentation, and Suggested Reviewers. These sections are beyond the scope of this textbook.)... [Pg.382]

The lg control for the STS-51F experiment was conducted post-flight at NASA KSC Life Support Facilities. The loaded PGU s were connected to ground support equipment located in a computer-controlled environmental room. The temperature of the room was maintained such that the PGU s were able to maintain PGC temperature profiles similar to those of flight. The flight time profile also was simulated in the control experiment. [Pg.207]

Support facilities and services associated with the slurry distribution system may include... [Pg.49]

The most frequent, serious, toxic effect of eflornithine is myelosuppression, which maybe unavoidable if successful treatment is to be completed decisions to modify dosage or to interrupt or cease treatment depend on the severity of the observed adverse event(s) and the availability of support facilities... [Pg.422]

For this cost analysis, an estimate of site support facilities was also performed. These costs included monitoring and control offices, site enclosure, control and safety equipment, waste preparation, waste shipping and processing, employee facilities, foundations, and installation of utilities (D17156M, pp. 17-18). These costs are also summarized in Table 1. [Pg.612]

Technology managers should indude the following dements in the plan itself the critical business issues the nature of markets and customers the thrusts of traditional and potential competitors the human resource issues, ie, the skills and abilities needed to carry out the plan alternatives and contingencies to support the plan a patent and intellectual property strategy and the supporting facilities and resource plan. The most frequently overlooked elements are human resource issues and patent strategies (50). [Pg.131]

Phasing of drilling, production, and reservoir support facilities to minimize initial investment was detailed. [Pg.29]

As turbine-driven plants generally cost 2-4 million Euro more than similar plants driven by electric motors the selection of drive will reflect the cost of the plant versus capacity as indicated on Figure 17 showing the regression line for LNG plant cost development versus time (year). Likewise, Figure 18 shows the cost development versus the development of LNG train size [10]. The investment may also reflect various requirements for the liquefaction train and necessary support facilities. [Pg.93]

ReVelle (2001, p. 459) defines location analysis as "the development of formulations and algorithms/methodologies to site facilities of diverse kinds in a spatial or geographic environment". In the following, the facilities to be located are further specified to possess point characteristics excluding models dealing with the location of area objects. The latter are employed to support facility layout and hence are not relevant in the context of this work (cf. Domschke and Krispin (1997) or Francis et al. (1992) for further references on facility layout models). [Pg.51]

Cost Estimates - Plant investment costs were developed using cost correlations based on actual plants constructed by Standard Oil Company of California. The important bases for these estimates are summarized in Table XVIII. Costs for the overall Case 1 refinery are broken down and detailed in Table XIX. Investments are categorized as "onplot," those directly concerned with the individual refinery process plants, and "offplot," for auxiliary or supporting facilities, such as utility plants, tankage, etc. The estimating allowances shown... [Pg.106]

On July 19, 197 the Board of Regents of the State of Florida approved the B.S, degree program in Forensic Science at FTU for initiation in September, 197. Development of the degree program and support facility took nearly two years to complete. A significant portion of that time was spent talking to forensic scientists in an attempt to articulate the problems just described. [Pg.14]

The resources, which will be required in all projects, are human resources, support facilities, equipment and materials. Planning for these resources is the task of the Project Manager and the team. [Pg.262]

Support Facilities. For example, a quantification of the cost of analytical support and other testing, such as HSE evaluation is made by the Project Manager. Any special work requiring additional development costs also needs to be identified. [Pg.262]

It is obvious, by now, that an operation of this scope could not exist without the political approval of the British government, nor without the gigantic supporting facilities of the world s offshore credit markets, the world s gold and diamonds trade, and "hands-on" management of the retail distribution, or organized crime aspects of the operation. [Pg.139]

Machining costs (labor and overhead) in the United States have an estimated value of > 300 x 109/yr. The cost of labor and overhead for machining is based on the estimated number of total metal-cutting machine tools in various metal-cutting industries (1). This value does not take into account the cost of raw stock (work material), cutting tools, and many other support facilities. An estimated breakdown of cutting tool costs is given in Table 13 (172). Because of the competitive nature of these industries, most prefer to keep cost information proprietary. [Pg.220]

Resource support (facility space, office equipment supplies, contracting services, etc.)... [Pg.29]

An example of a femtosecond laser system employing chirped pulse amplification is the one housed at the Laser Support Facility at the Rutherford Appleton Laboratory a schematic layout is shown in Fig. 2. The system is essentially two-stage, with short, low energy pulses generated in the first stage and amplified in the second. To generate the pulses, a multi-line argon-ion laser with principal lines at 488 and 514 nm and 5 W continuous wave output is used to... [Pg.3]

Fig. 2. The femtosecond laser system at the Laser Support Facility of Rutherford Appleton Laboratory... Fig. 2. The femtosecond laser system at the Laser Support Facility of Rutherford Appleton Laboratory...
Reversed-phase TLC also uses the common supporting facilities. In the laboratory, the nonpolar stationary phase can be produced by impregnating the layer (kieselguhr G or silica gel G) with long-chain hydrocarbons or liquid paraffin or by treatment with dimethyldichlorosilane (DMCS). Although commercial RP-TLC plates are available, so far it has been experimented with Ci8 plates only. [Pg.941]


See other pages where Facilities support is mentioned: [Pg.84]    [Pg.136]    [Pg.284]    [Pg.37]    [Pg.426]    [Pg.14]    [Pg.252]    [Pg.652]    [Pg.472]    [Pg.405]    [Pg.4]    [Pg.18]    [Pg.106]    [Pg.113]    [Pg.321]    [Pg.364]    [Pg.189]    [Pg.282]    [Pg.342]    [Pg.124]    [Pg.373]    [Pg.5]    [Pg.1933]   


SEARCH



Supporting Facilities

© 2024 chempedia.info