Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Manpower

The rapidly expanding requirements of the pharmaceutical industry, and the broadening areas of expertise contributing to the processes of R D, development, manufacturing, marketing, validation, surveillance, and in particular its innovative potential are increasing the demand for skilled manpower. [Pg.78]

The educational systems of different countries are providing a creicial competitive advantage (or disadvantage) for essentially R D-based industries like the pharmaceutical and the biotechnological industries. [Pg.78]


Most companies hire a drilling contractor to supply equipment and manpower rather than having their own rigs and crews. The reasons for this are threefold ... [Pg.61]

Subsea production systems provide for large savings in manpower as they are unmanned facilities. However, these systems can be subject to very high opex from the well servicing and subsea intervention point of view as expensive vessels have to be mobilised to perform the work. As subsea systems become more reliable this opex will be reduced. [Pg.268]

Project planning techniques are employed to prepare realistic schedules within manpower, materials and funding constraints. Realistic schedules are those that include a time allocation for delays where past experience has shown they may be likely, and... [Pg.295]

Once a network has been constructed it can be reviewed to determine whether the completion date and intermediate key dates are acceptable. If not, activity duration reductions have to be sought, for example, by increasing manpower or changing suppliers. [Pg.297]

Many oil and gas companies do not consider the detailed design and construction of production facilities as part of their core business. This is often the stage at which work is contracted out to engineering firms and the client company will switch manpower resources elsewhere, although some degree of project management is commonly retained. [Pg.300]

Once production commences (possibly 3-8 years after the first capex) gross revenues are received from the sale of the hydrocarbons. These revenues are used to recover the capital expenditure (capex) of the project, to pay for the operating expenditure (opex) of the project (e.g. manpower, maintenance, equipment running costs, support costs), and to provide the host government take which may in the simplest case be in the form of taxes and royalty. [Pg.305]

Operations Maintenance Engineering Operating costs - maintenance - workover - manpower requirements... [Pg.306]

Human Resources Manpower costs - operators - technical staff - support staff - overheads... [Pg.306]

The capital cost estimates are generated by the Engineering function, often based on 50/50 estimates (equal probability of cost overrun and underrun). It is recommended that the operating expenditure is estimated based on the specific activities estimated during the field lifetime (e.g. number of workovers, number of replacement items, cost of forecast manpower requirements). In the absence of this detail it is common, though often inaccurate, to assume that the opex will be composed of two elements fixed opex and variable opex. [Pg.308]

This RCCA inspection methods has now already proven it s reliability as an industrial solution on two Belgian power plants (Doel 3 and Tihange 1). Thanks to the graphical programming language, each site feedback is immediately injected. This way of working ensures a permanent improvement of the analysis system, and a reduction in manpower for the analysis. [Pg.1008]

Manpower Labor Contracts. Some faciUties prefer a strict manpower contract that suppHes skilled or unskilled labor as requited to fill ia and supplement an existing workforce. Arrangements can be made at the outset for temporary workers to be hired by the faciUty, if the need for thein service continues and they fit well iato the ia-house organization. [Pg.443]

The fact that is not radioactive means that it can be used safely in experiments in the field, but it also means that much patient work is needed to obtain results. The approach is demanding in terms of time, equipment, and skilled manpower, but it has made a great contribution to the understanding of the nitrate problem. The results that are outlined here are from experiments made by staff at Rothamsted, but key contributions have also come from Scotland and France. " The majority of the Rothamsted experiments involved winter wheat, but oilseed rape, potatoes, beans, and sugar beet were also grown. The soil is a factor in nitrate leaching, and three types were used, the flinty, silty clay loam at Rothamsted, a sandy loam at Woburn in Bedfordshire and a heavy sandy clay at Saxmimdham in Suffolk. [Pg.6]

If a PSSR is extensive, the PSSR team should include a toller company engineer and an engineer from the client. In addition, an operations supervisory representative and operations personnel with appropriate knowledge and skills along with a maintenance and safety representative may also be included on the team. The PSSR leader must ensure enough manpower and expertise is available on the team to review the new facilities and major modifications thoroughly. [Pg.97]

This means a 10% reduction in the impeller diameter, would bring about almost 30% reduction in energy. These energy. savings will easily cover the cost of multiple impellers and the manpower to change them frequently. [Pg.43]

Turner, D. B, Meteorological fundamentals, in "Meteorological Aspects of Air Pollution—Course Manual. Air Pollution Training Institute, Office of Manpower Development, Office of Air Programs. United States Environmental Protection Agency, Research Triangle Park, NC. [Pg.33]

Increased ability to predict required parts, special tools, and skilled manpower... [Pg.747]

What are the advantages and limitations of continuous and periodic monitoring Continuous monitoring requires a relatively large initial expenditure. But once installed, cost of operation is quite low. Periodic monitoring has a low initial cost, but is manpower intensive and therefore has a relatively high continuing cost. [Pg.355]

Make a list of all the costs associated with running a wet scrubbing operation to remove particulates and SO,. What cost factors could be eliminated or reduced if a pollution prevention technology or practice that used about the same energy and manpower requirements was applied. [Pg.147]

A PSA consists of many tasks and subtasks some tasks are performed in parallel others are in series. The experience of personnel, availability of data, computer programs, and manpower determine the PSA schedule. Other considerations are the age of the plant, its operational status, availability of documentation, peculiarities of the design, and the availability of the analyses of similar fiiants,... [Pg.229]

The term resource is often used to imply only human resources when there are in fact other types of resources. The standard is not specific although resources would normally include time, manpower, machines, materials, finance, plant, facilities in fact, any means available to the supplier for implementing the quality system. So when ISO 9001 requires that you provide adequate resources it requires that you provide all the human, finance, and material resources necessary to implement your quality system, including the allocation of sufficient time. [Pg.127]

On resources The manpower, material, facilities, and plant needed to execute a particular contract shall be established, documented, and agreed with senior management prior to submission of any tender, bid, or offer. The estimate shall include the resources to manage and carry out the work required and in addition the resources required to verify that work has been completed in accordance with the contractual requirements. ... [Pg.167]

The reviews to be held for authorizing work to proceed from stage to stage The resources in terms of finance, manpower, and facilities The risks to success and the plans to minimize them... [Pg.239]

Specifically, within the aerospace industry, for aircraft, the airframe manufacture itself is one of the major cost drivers, using the factors already addressed. Let s look at the character of how we would build an aerospace vehicle. There is typically a lot of manpower dependence. The industry itself is cyclic because the demands ebb and flow. There is typically little automation simply because of relatively low production rates, and there are very few customers. But, despite all those characteristics, there is typically also a large capacity that is founded on many highly skilled personnel, and the orientation is much more high tech than that of most other industries. Without product excellence as a driving factor, the whole industry would be an unworkable mess. [Pg.412]

Finally, the assessment should identify the existing PSM and ESH resources, both manpower and equipment. Manpower estimates should include full-time staff and the full-time-equivalent of the part-time contributions made by other staff You will need to probe for this information from part-time staff Do not ask simply for the percentage of time they spend on PSM or ESH issues, as it is likely to be a wildly... [Pg.64]


See other pages where Manpower is mentioned: [Pg.6]    [Pg.278]    [Pg.281]    [Pg.331]    [Pg.331]    [Pg.345]    [Pg.345]    [Pg.347]    [Pg.348]    [Pg.360]    [Pg.477]    [Pg.445]    [Pg.98]    [Pg.22]    [Pg.2170]    [Pg.59]    [Pg.94]    [Pg.171]    [Pg.229]    [Pg.230]    [Pg.33]    [Pg.350]    [Pg.2]    [Pg.16]    [Pg.67]    [Pg.74]    [Pg.37]   
See also in sourсe #XX -- [ Pg.101 , Pg.103 ]

See also in sourсe #XX -- [ Pg.83 , Pg.180 , Pg.208 , Pg.209 , Pg.225 , Pg.229 , Pg.255 ]

See also in sourсe #XX -- [ Pg.439 ]




SEARCH



Chemical industry manpower costs

Leveling manpower

Maintenance manpower

Management Manpower

Manpower Planning for Proper Plant Operation

Manpower Services Commission

Manpower Technical

Manpower and Equipment Leveling

Manpower conservation

Manpower cost calculation

Manpower planning

Manpower requirements

Pharmacy Manpower Project

Pharmacy Manpower Project Aggregate Demand

© 2024 chempedia.info