Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Risks, identifying

Number of inadequately controlled risks identified and corrected, along with the appropriate allocation of capital to risk reduction activities... [Pg.114]

Number of previously uncontrolled risks identified and corrected... [Pg.124]

Risks identified and the appropriate level of protective equipment determined ... [Pg.173]

Risks identified from risk analysis, measures to minimise and control risks and information on subject seiection... [Pg.195]

Have all hazards associated with the use of process materials been identified, for example, identifying a schedule of risks Identify a risk category on a hazard-by-hazard basis. [Pg.12]

It is shown that REACH today in principle has already many necessary instruments to tackle RISKCYCLE. So within the registration procedure of chemicals, the registrants have to include RISKCYCLE exposure scenarios. The guidance documents for the registration procedure cover the waste sector in a way that risks identified in connection with waste export in developing countries should be quantified and if necessary managed. But it is open, how these provisions are considered in reality. [Pg.137]

Engineering, Installation, Commissioning, and Validation (EICV) This phase involves the physical realization of the design basis, which is developed in response to process risk identified in an H RA study. The bulk of the work in this phase is not a process... [Pg.104]

The core of the new EU scheme to control chemicals is REACH Registration, Evaluation and Authorisation of Chemicals (32, 93). REACH will place a duty on companies that manufacture, import and use chemicals in the EU to assess the risks arising from their use, which will often require safety testing, and manage any risks identified. [Pg.3]

To report to the WHO evidence of a public health risk identified outside their territory, which may cause international disease spread, manifested by exported/imported human cases, vectors carrying infection or contamination, or contaminated goods... [Pg.227]

Risks identified in clinical trials if available, for example from trials in other indications or territories... [Pg.508]

Adequate funding, personnel, and other resources should be allocated, commensurate with the risk identified. [Pg.320]

Existing system applications will need to be evaluated and applicable GMP issues and risks identified. Whether it be legacy systems, systems to be revalidated, or systems yet to be validated, the critical parameters, data, and functions that direcdy impact GMP should be clearly identified and formally documented. Each system should be assessed under a formal procedure to determine compliance with the regulations for electronic records and electronic signatures. Any resulting action plan should include system prioritization and implementation timings. [Pg.573]

The software test strategy and detailed test scripts (protocol) are reviewed and approved by the Project Team. This review will verify that the test cases will stress the program interfaces, challenge the data boundaries and limits, and verily that the test cases are traceable to the appropriate clauses in the requirements specification deliverable. The review also verifies that the test cases adequately cover the risks identified in the Risk Analysis. The unit/ integration test results are documented by the programmer, and reviewed, approved, signed, and dated by QA. [Pg.219]

Risk assessment closed. No restrictions due to the lack of risks identified for the use of this substance. [Pg.95]

The EU Risk Assessments on the four chlorophosphate flame-retardants—TCPP, TDCP, TCEP, and V-6—were recently finalized.54 57 For TCPP, TDCP, and TCEP all had some risks identified, so risk reduction strategy for each is in progress. The classification and labeling proposal is in preparation for TCPP. No risks were identified for V-6, hence this material will have no risk phrases associated with it. [Pg.680]

In all industrial processes, the safety of operators and staff, as well as the general public in surrounding areas, is of paramount importance. Every effort should be made during design and construction to ensure that the bioseparation plant is safe to operate with all risks identified and minimized through appropriate precautions. [Pg.654]

FDA provides a website with public information on this issue, " as well as specific guidance for industry. " " " These documents describe a process for deciding if a proposed antimicrobial use in food animals would likely lead to resistance that would negatively impact human health. It outlines possible methods for ranking antimicrobials based on their importance for human use conducting a qualitative risk assessment for a proposed animal antimicrobial use and managing risks identified in the assessment. [Pg.3982]

In a comparison between Lipinski s rules and the AD M ET Risk, we have found that the rule-of-5 accurately identifies only a fraction of the compounds that have experimental absorption less than 50%. This high false-positive result allows many of the poor compounds to go undetected. By contrast, the ADMET Risk identifies a much higher fraction of the unfavorable compounds in addition to many of the well-absorbed compounds. [Pg.458]

To do this FRAC established Working Group for four fungicide types considered to be at risk, identifies existing and potential resistance problems, collects and generates information, communicates to those involved in fungicide research, distribution and use. [Pg.321]

C. H. Rubin, C.A. Burnett, W.E. Halperin, P.J. Seligman. Occupation as a Risk Identifier for Breast Cancer. American Journal of Public Health, Vol. 83, pgs. 1311-1315,1993. [Pg.185]

Objectives for the evaluation need to be set at its outset and, if possible, agreed with all those who will make use of, or depend on, its conclusions. However, the scope of the objectives is constrained to those risks identified in previous stages of the site assessment. If others are identified at this stage, or the description of previously identified risks is found to be inadequate, it is necessary to return to the risk estimation stage. [Pg.57]

As these parameters are monitored and changes in risk identified, critical issues can be escalated for more detailed review. Once several risk reduction strategies are identified, the same types of risk evaluation criteria (e.g., risk index, risk matrix, or other quantitative measures) described earlier in this book can be used to assess the relative benefits of each proposed risk mitigation option. Risk reduction can thus be defined as the process of evaluating and identifying options available to reduce risk, that achieve the desired level of risk reduction, and can be justified on a cost-benefit basis. [Pg.142]

Safety and health impacts everyone, and everyone looks to the safety and health professional to provide his or her expertise and insight with virtually every activity. Safety and health professionals, in addition to all of their daily activities, must be proactive in identifying and addressing risks in the woikplace and beyond as well as developing countermeasnres throngh which to minimize or eliminate the identified risk. Identify the risk and eliminate the risk so that nothing happens. Safety and health professionals prefer that nothing happens. [Pg.100]

As safety and health professionals are aware, upper management not only wants to know about the safety and health problems and risks but also expects the safety and health professional to have thought through the issues and identified the various options and costs as to the methods through which to rectify the problem or eliminate the risk. Bosses generally do not simply want to hear about all of the problems and risks identified by the safety and health professional without identifying the various ways in which the problem or risk can be addressed—and always the costs. [Pg.123]

The traditional risk analysis performed by NASA on ITA identified about one hundred risks. The more rigorous, structured STAMP-based analysis—done independently and without any knowledge of the results of the NASA process-identified about 250 risks, all the risks identified by NASA plus additional ones. A small part of the difference was related to the consideration by the STAMP group of more components in the safety control structure, such as the NASA administrator. Congress, and the Executive Branch (White House). There is no way to determine whether the other additional risks identified by the STAMP-based process were simply missed in the NASA analysis or were discarded for some reason. [Pg.239]


See other pages where Risks, identifying is mentioned: [Pg.128]    [Pg.244]    [Pg.29]    [Pg.37]    [Pg.611]    [Pg.47]    [Pg.508]    [Pg.301]    [Pg.673]    [Pg.21]    [Pg.44]    [Pg.2173]    [Pg.2548]    [Pg.236]    [Pg.1021]    [Pg.714]    [Pg.61]    [Pg.276]    [Pg.82]    [Pg.1025]    [Pg.29]    [Pg.68]    [Pg.322]   
See also in sourсe #XX -- [ Pg.160 ]




SEARCH



Hazard Analysis to Identify Organizational and Programmatic Risks

Identify employees at risk

Identifying Risk in a System

Identifying and Constructing Risks

Identifying coordination risks

Immunotoxicity risks, identifying

Risk assessment process identifying significant hazards

Scientific Committee on Emerging and Newly Identified Health Risks

© 2024 chempedia.info