Time schedule planning

Before any physical movement is done in the real inspection environment, the optimal robot configuration and motion are planned and simulated in a virtual iuspection environment in the ROBCAD 3D robot simulation system. If any collisions or near-collisions are occurring or all the calculated inspection points can not be reached the robot configuration and/or robot inspection programs can be adjusted off-line accordingly without the need of the physical robot or inspection environment. This ensures that the time scheduled for the physical inspection is used actively for inspection instead of testing and configuration. [Pg.871]

It is essential to plan the time schedule of a measurement project-—the more detailed, the more important it is to carry out the measurements in a specified time. The time schedule is achieved by dividing the whole project into smaller tasks and assessing the time required to carry out these subtasks. A rough division of a mea.surement project could contain the following elements ... [Pg.1122]

Scheduled maintenance Work performed at a time specifically planned to minimize interruptions in machine availability e.g. changing a gearbox when machine is not required for use (includes predictive and preventive maintenance). [Pg.564]

Finding the time in your busy schedule may seem like the greatest hurdle in making your just in time study plan, but you probably have more time available than you think. It just takes a little planning and some creativity. [Pg.22]

The different lubricant suppliers made a technical proposal of their services (technical approach, monitoring, quality of the products, take back lubricants exhaust from the sugar mill, reports on lubricant consumption, environmental benefits like water consumption reduction, energy savings, increase of equipment life-cycles, statistics and controlling) as well as a time schedule for the work plan. Each of the suppliers accepted agreements concluded in a collaboration contract between the Mexican Cleaner Production Centre, the sugar mill and the lubricants supplier. [Pg.85]

The firm s proposed plans and time schedule to meet your company s objectives and requirements... [Pg.433]

Finally, the individual elements of the plan are put together and the strategic plan is readjusted to a more exact time schedule. The revised strategic plan which summarizes the major project parts can now serve as a useful master plan and project overview to present and justify the project in general. Reference to the sub-plans should be made to allocate the resources and for progress monitoring purposes. [Pg.25]

The most important time strategy is pacing yourself Before you begin, take just a few seconds to survey the test, noting the number of questions and the sections that look easier than the rest. Plan a rough time schedule based on the amount of time available to you. Mark the hallway point on your test and indicate what the time will be when the testing period is half over. [Pg.152]

The creation of a master plan permits the development of a logical overview of the validation effort. It lays out in a logical sequence the activities or key elements or both to be performed in accordance with the approximate time schedule in a Gantt or PERT chart format. The master plan establishes the critical path through the chart against which progress can be monitored. [Pg.3930]

When a publishing house (Izdatelstvo) plans to issue a book, monograph, journal, or other printed material, the Glavizdat provides it with information about the possible volume of sale derived either on the basis of a survey or past performance. The format, size of the edition, required paper, ink, and binding supplies are worked out, and time schedules are set for the delivery of the product by the publisher to the Glavizdat. The date of delivery, quality, packaging, etc., are embodied in a contract secured by penalty clauses. The Glavizdat supplies... [Pg.160]

A new optimisation structure (Fig.2) for the scheduling of operational activities in a real-world pipeline network (Fig.l) has been addressed in this paper. In addition, a new computational procedure was developed, the Pre-Analysis module. The real scenario could be addressed mostly due to Pre-Analysis scalability. The considered scenario is particularly complex and involves more nodes and pipes, compared to the one discussed in a previous work [5]. In order to address this scenario, a decomposition approach was used. This decomposition relied on a Resoince Allocation block, which takes into accoimt production/consumption functions and typical lot sizes to determine a set of candidate sequences of pumping. Furthermore, a Pre-Analysis block uses candidate sequences to determine temporal and volume parameters. These parameters were used in a continuous-time MILP model, which indeed determines the short-term scheduling of each batch in each node of the pipeline network. The implemented structure can be used, for instance, to identify system bottlenecks and to test new operational conditions. Computation time has remained at few CPU seconds. The proposed approach have allowed that a monthly planning of production and consumption be detailed in short-time scheduling operations within the considered pipeline network. Thus, operational insights can be derived from the obtained solutions. As an ongoing research, the Pre-Analysis would be used to determine other parameters for the MILP model. [Pg.264]

As elaborated above the establishment of the first allocation plan is complex both in terms of technical and process issues. An additional factor that characterised the first allocation process was the very tight time schedule. The Directive was politically agreed in July 2003 and formally entered into force on 25 October 2003. This means that the first allocation plans were due less than six months after the formal entry into force of the Directive. [Pg.20]

Are the grout holes laid out in plan and profile Do the holes enter the zone to be grouted Have a sequence and time schedule of hole placement been selected ... [Pg.463]

Planning is crucial if one is to complete a population modeling project as efficiently as possible (16). A population modeling project can be characterized by its goal and the various tasks involved in the project, including their duration. Figure 11.1 shows the time schedule allocated to a project, starting with the definition of the... [Pg.289]

Planning Orientation of task based on the potential of the performing laboratory with respect to instrumentation, staff, staff expertise, organizational structure, time schedule... [Pg.1527]

A Planned Preventative Maintenance Programme and Standard Operating Procedure for carrying out the maintenance, should be in place. It should refer to all relevant equipment and apparatus to be included in the programme. Responsible persons, should be fisted, canrying out maintenance in accordance with the specified time schedule. Records should be kept as evidence of maintenance checks and repairs. [Pg.614]

A system in such an environment has to create high-level production plans as weU as more and more detailed scheduling plans. The timing of the generation of these detailed schedules depends on the urgency or the importance of the jobs in question. [Pg.1733]

In the apparel industry, production orders tend to split into smaller orders with different product features in response to growing requests for product customization. In order to shorten product time-to-market, apparel manufacturers work hard in the direction of just-in-time production. In the apparel manufacturing process, the effectiveness of fabric-cutting schedule planning extensively influences downstream assembly operations, and thus, in turn, is critical to the overall system performance. However, the demand from downstream operation... [Pg.149]


See other pages where Time schedule planning is mentioned: [Pg.445]    [Pg.540]    [Pg.415]    [Pg.91]    [Pg.9]    [Pg.1318]    [Pg.175]    [Pg.553]    [Pg.59]    [Pg.102]    [Pg.87]    [Pg.540]    [Pg.390]    [Pg.213]    [Pg.238]    [Pg.177]    [Pg.905]    [Pg.268]    [Pg.41]    [Pg.59]    [Pg.540]    [Pg.1616]    [Pg.2036]    [Pg.2036]    [Pg.139]    [Pg.150]    [Pg.154]    [Pg.215]    [Pg.419]    [Pg.474]    [Pg.88]   
See also in sourсe #XX -- [ Pg.34 ]