Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Time schedules

Inspection jobs are often so special regarding to object geometry, available space, or inspection requirements that a standard scanner is not directly useful for the job. This leads to modifications of existing scarmer equipment, or design and manufacture of a dedicated scanner under a tight time schedule. [Pg.799]

Before any physical movement is done in the real inspection environment, the optimal robot configuration and motion are planned and simulated in a virtual iuspection environment in the ROBCAD 3D robot simulation system. If any collisions or near-collisions are occurring or all the calculated inspection points can not be reached the robot configuration and/or robot inspection programs can be adjusted off-line accordingly without the need of the physical robot or inspection environment. This ensures that the time scheduled for the physical inspection is used actively for inspection instead of testing and configuration. [Pg.871]

Table 5. Typical Softwood Kiln-Drying Time Schedules for 2.5-cm Ponderosa Common Pine... Table 5. Typical Softwood Kiln-Drying Time Schedules for 2.5-cm Ponderosa Common Pine...
It is essential to plan the time schedule of a measurement project-—the more detailed, the more important it is to carry out the measurements in a specified time. The time schedule is achieved by dividing the whole project into smaller tasks and assessing the time required to carry out these subtasks. A rough division of a mea.surement project could contain the following elements ... [Pg.1122]

Electromechanical Controls. Electro-mechanical control devices are typically used for load control (lighting, ventilation, and heating) in buildings with no feedback signal. The most common device is the electromechanical timer, in which a small motor coupled to a gearbox is able to switch electrical contacts according to a predefined time schedule. They are still in use today, applied to loads with simple scheduling requirements. [Pg.297]

Supervision and administrative, including time schedules, discussions with salesmen, prepa- ... [Pg.37]

Near peak manpower requirements tvill be needed from 30 to 50 percent of the total time schedule, unless other factors influence the timing. [Pg.40]

The schedule of projects must often be adjusted to reflect the influence of the key decision maker assigned to the work. If he requires complete detailed figures before reaching any decision, time will necesssuily be consumed. On the other hand if he applies judgment and experience to the basic factors (less details), then the over-all direction of the project can be continually pointed in a profitable direction in the minimum of time. In reality actual multipliers are often applied to the time schedule of a project to reflect the type of decision-maker involved. [Pg.43]

PERT diagrams are most useful if they show the time scheduled for completing an activity on the activity line. Time is recorded in a unit appropriate for the project, with days being most common, and hours, weeks, or even months occasionally used. Some diagrams show two numbers for time estimates - a high estimate and a low estimate. [Pg.825]

Conducting interim progress reviews Interim progress reviews typically occur on a fixed time schedule, such as daily or weekly. They may also occur when some problem in performance is observed or at the completion of a significant step toward the accomplishment of the project. [Pg.835]

Selecting the optimum process encompasses a broad spectrum of possibilities (shape, size, material used, quantity, tolerance, time schedule, cost, etc.). There are designs when only one process can be used but there can be applications where different processes can be used. Each process, like each material of construction have their capabil-... [Pg.512]

The procedure for the determination of total secondary alkanesulfonates with TLC and of total monosulfonates specified as homologs and isomers by derivatization GC-MS is shown in Fig. 18. The specific clean-up for sewage sludges prior to total secondary alkanesulfonate determination is outlined in Fig. 19. TLC conditions are given in Table 9. The limits of the quantification of secondary alkanesulfonates are summarized in Table 10. For eight samples and one operator the TLC time schedule is 4 days sample pretreatment and sublation, clean-up, TLC performance, and quantitative evaluation of TLC [24]. [Pg.171]

On the other hand, Union Carbide was plagued by all sorts of problems in starting up its chemical complex at Taft, La. It was reported that startup problems reduced corporation after-tax earnings by 30,000,000 and set the time schedule for full production back 18-24 months.12... [Pg.364]

The cut powder is dried in stoves fitted with solvent recovery and operated to a carefully determined time schedule. If drying is carried out too quickly the surface can be hardened and afterwards crack, with serious effects on the ballistics of the resulting powder. This process of stoving... [Pg.171]

The sequential batch reactor (SBR) consists of a vessel operated under batch conditions according to the time schedule reported in Fig. 3. The symbols Fill, React, Settle, Draw and Idle refer to the typical sequential phases of operation loading, reaction, biophase settling, discharging and the idle time. The reaction period may be split into two sub-phases an anaerobic phase and an aerobic phase. The aerobic sub-phase is devoted to convert products of the azo-dye anaerobic... [Pg.111]

Fig. 3 Time schedule program of a typical sequencing batch reactor... Fig. 3 Time schedule program of a typical sequencing batch reactor...

See other pages where Time schedules is mentioned: [Pg.324]    [Pg.875]    [Pg.2154]    [Pg.449]    [Pg.421]    [Pg.373]    [Pg.1039]    [Pg.1122]    [Pg.464]    [Pg.565]    [Pg.730]    [Pg.835]    [Pg.520]    [Pg.569]    [Pg.252]    [Pg.268]    [Pg.271]    [Pg.323]    [Pg.69]    [Pg.235]    [Pg.772]    [Pg.415]    [Pg.362]    [Pg.135]    [Pg.346]    [Pg.375]    [Pg.40]    [Pg.91]    [Pg.9]    [Pg.172]   
See also in sourсe #XX -- [ Pg.173 ]

See also in sourсe #XX -- [ Pg.268 ]




SEARCH



Computer time scheduling

Order scheduling uncertain arrival times

Relative scheduling start time

Scheduling Based on Reachability Analysis of Timed Automata

Scheduling Timing

Scheduling continuous time representation

Scheduling discrete time representation

Scheduling with Timed Automata

Time Delivery Schedule

Time constrained scheduling

Time schedule control

Time schedule planning

Time scheduling

Time scheduling

Timed scheduling

Timed scheduling

© 2024 chempedia.info