Work plan

Minimum risk estimates are sometimes used to quantify either maximum exposure in monetary terms or, in the case of an annual work plan containing multiple projects, to help determine the proportion of firm projects. Firm projects are those which have budget cover even if costs overrun. A minimum risk estimate is one with little or no probability of overrun, and can be used to reflect the risk associated with very complex or novel projects. [Pg.300]

All contractors should interface with each other to encourage mutual understanding and coordinating their respective activities, as well as for reviewing and commenting on documents such as work plans or the safety plan. [Pg.31]

Specialty duties are assigned to teams formed for specific tasks or responding to unusual circumstances (e.g., waste characterization, confined-space rescue, asbestos, lead abatement, etc.). These teams are formed, as necessary, on a permanent or temporary basis. In many cases, special training, drills and exercises, and development of safe work plans are needed to prepare team members to conduct work safely and effectively. [Pg.37]

Work planning and control processes include the use of job hazard analyses (JHAs), job safety analyses (JSAs), task analyses, safe work plans, safe work permits, or procedures. [Pg.58]

Most requests for proposals and bid speeifieations will inelude statements that all work will eomply with all applieable safety guidelines. You may eome aeross the argument that, Sinee we have already agreed to abide by the law (OSHA standard), why not just submit the latest eopy of 29 CFR or another applieable guidanee and inelude it as an attaehment to our work plan, and save the time and effort of developing a safety plan ... [Pg.72]

Develop and emphasize maintenance work plans on large mining cijuipmeni... [Pg.442]

Stunden-leistung, /. hourly output, -plan, m. timetable working plan, schedule, -zeiger, m. hour hand. [Pg.435]

Draw working plans 15 10. Install heating / air conditioning 5... [Pg.824]

Repetitive shutdown work This type of work is developed by experienced maintenance and operations supervision based on prior shutdown experience, job knowledge, and required shutdown preventive maintenance tasks. Each agreed-upon job is assigned an annual work order number frequency, established, work order plans written, and is entered in the work order log. The handling of repetitive work orders will be the same as non-repetitive work orders, except one copy of the work plan will be substituted for the first copy of the work order. [Pg.827]

Completed work plans and any signed-off work orders should be submitted by the supervisor to their respective maintenance supervisor no later than the day after the job is completed. The maintenance supervisor should examine these documents for completeness and accuracy. [Pg.827]

If the work as called for on the work order is done in its entirety including steam tracing, insulation, clean up, etc., then the work order should be signed off. The supervisor should return the signed-off work order and the work plan to his supervisor who forwards them to planning. [Pg.827]

If the work as called for on the work order is not completed due to lack of insulation, clean-up, tie-ins only being made, etc., but the shutdown portion of the work has been completed, then the first copy of the work order should be retained by the supervisor. The supervisor should then return the work plan to his supervisor denoting the reason for not completing work, explanation of variance, etc. The planning office will prepare a list of incomplete work following the shutdown and forward this list and a copy of the work orders to the appropriate maintenance supervisor for follow-up. [Pg.827]

The assigned planner develops the work plan. He segments the job into manageable activities, and identifies... [Pg.828]

Upon completion of the work plan, planning will order necessary stock and non-stock materials for delivery to the appropriate staging area. They then will enter the work order plan into the system. [Pg.828]

On emergency shutdowns or any outage with less than five days planning time, planning should prepare a rough estimate (RE) for the job and issue a blank work plan with the appropriate work orders. Planning will not order miscellaneous parts, materials, tools, etc. this will be the responsibility of the assigned supervisor and area planner. [Pg.832]

Unfortunately, in the minds of many regulators the word laboratory may conjure up visions of fires, explosions, and highly toxic materials. For that reason, a laboratory planner should be prepared to present the proposed operation in great detail and to answer all questions, even those which may not seem relevant. Any work planned for the future should also be discussed, since the added cost of accommodating for it in the beginning may be just a fraction of what would have to be paid for later modifications. All pertinent facts must be revealed a minor omission could make a big difference in laboratory safety. A laboratory operator who has studied the various rules and regulations with care will have no problem handling such discussions. [Pg.42]

Developing a work plan. A work plan is established that documents the scoping process and presents anticipated future tasks. [Pg.598]

The purpose of a sampling and analysis plan (SAP) is to ensure that sampling data collection activities will be comparable to and compatible with previous data collection activities performed at the site, while providing a mechanism for planning and approving field activities. The plan also serves as a basis for estimating costs of field efforts for inclusion in the work plan. [Pg.598]

Deliverables required for all RI/FSs in which field investigations are planned consist of a work plan, an SAP, a health and safety plan (HSP), and a community relations plan (CRP). [Pg.598]

Preparing a work plan (or modifying the existing work plan) for the bench or pilot studies... [Pg.602]

USEPA (1997) Lake Michigan mass budget/mass balance work plan. EPA-905-R-97-018, US Environmental Protection Agency and Great Lakes National Program Office... [Pg.68]

Communication from the Commission to the Council and the European Parliament Establishment of the working plan for 2009-2011 under the Ecodesign Directive. Brussels, 21.10.2008, COM (2008) 660 final http //eur-lex.europa.eu/LexUriServ/LexUriServ.do uri=COM 2008 0660 FIN EN PDF. 21 Oct 2008... [Pg.151]

Sep The Age of Entrepreneurship Market Survey Literature Review Work Plan Safety Training Order Consumables Project Description, Evaluation and Costing ... [Pg.351]

All instrumentation should be operated in accordance with operating instructions as supplied by the manufacturer, unless otherwise specified in the work plan. Equipment checkout and calibration activities should be done and documented prior to site characterization. [Pg.112]

Performing performance evaluations to ensure installation follows specifications and work plan... [Pg.331]

A discussion paper (35132/03) on the implications of renal immaturity in neonates when investigating a medicine for paediatric use has been released for consultation. It is anticipated the PEG will finalise by 2005 the work commenced in 2002/2003 in assessing the paediatric needs in three therapeutic areas - gastroenterology, anti-HIV and pain. A very comprehensive work plan for PEG for 2004—5 attests to the importance of this area of drug development. [Pg.508]