Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Estimating detailed

Optimal values for adsorption properties may be deduced by considering effects on the two transport processes, diffusion and mass flow. To estimate detailed figures, it is necessary to solve transport equations for the particular boundary conditions of the system under study, but in general terms... [Pg.195]

Equipment Sizing Before equipment costs can be obtained, it is necessary to determine equipment size from material and energy balances. For preliminary estimates, rules of thumb may be used but for definitive and detailed estimates, detailed equipment calculations must be made. [Pg.13]

The Monographs represent the first step in carcinogenic risk assessment, which involves examination of all relevant information in order to assess the strength of the available evidence that certain exposures could alter the incidence of cancer in humans. The second step is quantitative risk estimation. Detailed, quantitative evaluations of epidemiological data may be made in the Monographs, but without extrapolation beyond the range of the data available. Quantitative extrapolation from experimental data to the human situation is not undertaken. [Pg.9]

An evaluation of the operating labor and utilities requirements of the process must be made before the total product cost can be estimated. Details for evaluating these direct production costs are given in Chap. 6 and Appendix B. The estimate of the total product cost for the manufacture of 15 million lb per year detergent, based on methods outlined in Chap. 6, is presented in Table 5. [Pg.32]

Preliminary methods are used in the formative stages of design, are meant to be fast, and are not expected to be as accurate as those used to prepare detailed estimates. Detailed methods, at the other extreme, are used to set prices, make competitive bids, or allow orgemizational decisions to be made on what type of economic action to take. As might be expected, detailed methods are much more quantitative. Arbitrary and judgmental factors are suppressed though not fully eliminated. [Pg.2300]

Once the calibrated simulation model is available, simulations can be re-run and equipment rating studies can be performed to identify equipment limitations and to generate many options to meet the revamp objectives. Spreadsheet and vendor models are also required to perform conceptual design and options. Heat and material balances, and preliminary equipment sizes, are estimated. Detailed process simulations, block flow diagrams, PFD, pipe and process equipment sizes are generated for each revamp design option these are useful for detailed analysis of benefits/constraints and CAPEX estimation for each option. [Pg.27]

In Table 7.2. the accuracy range associated with each class of estimate and the costs associated with carrying out the estimate are ranked relative to the most accurate class of estimate (Class 1). In order to use the information in Table 7.2. it is necessary to know the accuracy of a Class 1 estimate. For the cost estimation of a chemical plant, a Class 1 estimate (detailed estimate) is typically +6% to -A% accurate. This means that by doing such an estimate, the true cost of building the plant would likely be in the range of 6% higher than and 4% lower than the estimated price. Likewise, the effort to prepare a Class 5 estimate for a chemical process is typically in the ranee of 0.015% to 0.30% of the total installed cost of the plant [1,2]. [Pg.183]

Detailed and extensive information on the UNIFAC method for estimating activity coefficients with application to vapor-liquid equilibria at moderate pressures. [Pg.8]

The method used here is based on a general application of the maximum-likelihood principle. A rigorous discussion is given by Bard (1974) on nonlinear-parameter estimation based on the maximum-likelihood principle. The most important feature of this method is that it attempts properly to account for all measurement errors. A discussion of the background of this method and details of its implementation are given by Anderson et al. (1978). [Pg.97]

This sum, when divided by the number of data points minus the number of degrees of freedom, approximates the overall variance of errors. It is a measure of the overall fit of the equation to the data. Thus, two different models with the same number of adjustable parameters yield different values for this variance when fit to the same data with the same estimated standard errors in the measured variables. Similarly, the same model, fit to different sets of data, yields different values for the overall variance. The differences in these variances are the basis for many standard statistical tests for model and data comparison. Such statistical tests are discussed in detail by Crow et al. (1960) and Brownlee (1965). [Pg.108]

Because of the existence of numerous isomers, hydrocarbon mixtures having a large number of carbon atoms can not be easily analyzed in detail. It is common practice either to group the constituents around key components that have large concentrations and whose properties are representative, or to use the concept of petroleum fractions. It is obvious that the grouping around a component or in a fraction can only be done if their chemical natures are similar. It should be kept in mind that the accuracy will be diminished when estimating certain properties particularly sensitive to molecular structure such as octane number or crystallization point. [Pg.86]

To estimate the effect of automobile traffic and motor fuels on ozone formation, it is necessary to know the composition of exhaust gas in detail. Figure 5.26 gives an example of a gas phase chromatographic analysis of a conventional unleaded motor fuel. [Pg.262]

The planning details will also allow the engineer to estimate the costs, which in combination with other data will allow an evaluation of the profitability of the project. [Pg.31]

In addition to fluid properties it is important to know how volumes and rates w change at the wellhead over the life of the well or field. Production profiles are required for oil, water and gas in order to size facilities, and estimates of wellhead temperatures and pressures (over time) are used to determine how the character of the production stream will change. If reservoir pressure support is planned, details of injected water or gas which may ultimately appear in the well stream are required. [Pg.237]

When an oil or gas field has just been discovered, the quality of the information available about the well stream may be sparse, and the amount of detail put into the process design should reflect this. However, early models of the process along with broad cost estimates are needed to progress, and both design detail and cost ranges narrow as projects develop through the feasibility study and field development planning phases (see Section 12.0 for a description of project phases). [Pg.239]

When estimating the operating and maintenance costs for various options, it is recommended that the actual activities which are anticipated are specified and costed. This will run into the detail of frequency and duration of maintenance activities such as inspection, overhaul, painting. This technique allows a much more realistic estimate of opex to be made, rather than relying on the traditional method of estimating opex based on a percentage of capex. The benefits of this activity based costing are further discussed in Section 13.0 and 14.0. [Pg.290]

The capital cost estimates are generated by the Engineering function, often based on 50/50 estimates (equal probability of cost overrun and underrun). It is recommended that the operating expenditure is estimated based on the specific activities estimated during the field lifetime (e.g. number of workovers, number of replacement items, cost of forecast manpower requirements). In the absence of this detail it is common, though often inaccurate, to assume that the opex will be composed of two elements fixed opex and variable opex. [Pg.308]

The basic condition of the Standard application - the availability of stable coupled probabilistic or the multiple probabilistic relations between then controlled quality indexes and magnetic characteristics of steel. All the probabilistic estimates, used in the Standard, are applied at confidence level not less than 0,95. General requirements to the means of control and procedure of its performance are also stipulated. Engineers of standard development endeavoured take into consideration the existed practice of technical control performance and test at the enterprises that is why the preparation of object control for the performance of nondestructive test can be done during the process of ordinary acceptance test. It is suggested that every enterprise is operated in correspondence with direct and non-destructive tests, obtained exactly at it, for detailed process chart and definite product type, however the tests have long since been performed after development of the Standard displayed that process gives way to unification. [Pg.25]

To search for the forms of potentials we are considering here simple mechanical models. Two of them, namely cluster support algorithm (CSA) and plane support algorithm (PSA), were described in details in [6]. Providing the experiments with simulated and experimental data, it was shown that the iteration procedure yields the sweeping of the structures which are not volumetric-like or surface-like, correspondingly. While the number of required projections for the reconstruction is reduced by 10 -100 times, the quality of reconstruction estimated quantitatively remained quite comparative (sometimes even with less artefacts) with that result obtained by classic Computer Tomography (CT). [Pg.116]

In the following sections our approach to stereoradioscopy will be described in detail. At first, the camera model and the calibration procedure are introduced, in the second part, the calculation of 3D defect positions and the volume estimation procedure are explained. [Pg.485]

Several modes of measurement are used in the tomographic system. The most rapid one is applied as an estimation mode, the estimation error being a factor of 1.5 to 2 higher than that one of the conventional mode. With the estimation mode defective section can be detected rapidly and then they can be quantitatively investigated in detail using other modes... [Pg.600]

In a regression approach to material characterization, a statistical model which describes the relation between measurements and the material property is formulated and unknown model parameters are estimated from experimental data. This approach is attractive because it does not require a detailed physical model, and because it automatically extracts and optimally combines important features. Moreover, it can exploit the large amounts of data available. [Pg.887]

The detailed consideration of these equations is due largely to Kozeny [50] the reader is also referred to Collins [51]. However, it is apparent that, subject to assumptions concerning the topology of the porous system, the determination of K provides an estimate of Ao- It should be remembered that Ao will be the external area of the particles and will not include internal area due to pores (note Ref. 52). Somewhat similar equations apply in the case of gas flow the reader is referred to Barrer [53] and Kraus and co-workers [54]. [Pg.581]

Brunauer (see Refs. 136-138) defended these defects as deliberate approximations needed to obtain a practical two-constant equation. The assumption of a constant heat of adsorption in the first layer represents a balance between the effects of surface heterogeneity and of lateral interaction, and the assumption of a constant instead of a decreasing heat of adsorption for the succeeding layers balances the overestimate of the entropy of adsorption. These comments do help to explain why the model works as well as it does. However, since these approximations are inherent in the treatment, one can see why the BET model does not lend itself readily to any detailed insight into the real physical nature of multilayers. In summary, the BET equation will undoubtedly maintain its usefulness in surface area determinations, and it does provide some physical information about the nature of the adsorbed film, but only at the level of approximation inherent in the model. Mainly, the c value provides an estimate of the first layer heat of adsorption, averaged over the region of fit. [Pg.653]

Lamellar morphology variables in semicrystalline polymers can be estimated from the correlation and interface distribution fiinctions using a two-phase model. The analysis of a correlation function by the two-phase model has been demonstrated in detail before [30,11] The thicknesses of the two constituent phases (crystal and amorphous) can be extracted by several approaches described by Strobl and Schneider [32]. For example, one approach is based on the following relationship ... [Pg.1407]


See other pages where Estimating detailed is mentioned: [Pg.1005]    [Pg.89]    [Pg.906]    [Pg.665]    [Pg.119]    [Pg.136]    [Pg.136]    [Pg.187]    [Pg.3250]    [Pg.370]    [Pg.1005]    [Pg.89]    [Pg.906]    [Pg.665]    [Pg.119]    [Pg.136]    [Pg.136]    [Pg.187]    [Pg.3250]    [Pg.370]    [Pg.291]    [Pg.293]    [Pg.300]    [Pg.488]    [Pg.281]    [Pg.330]    [Pg.331]    [Pg.650]    [Pg.861]    [Pg.1244]    [Pg.1409]    [Pg.2521]   
See also in sourсe #XX -- [ Pg.116 ]




SEARCH



Cost estimation detailed

Design detailed-estimate

Detailed Cost Estimate

Detailed estimates

Detailed estimates

Detailed factorial estimates

Detailed-item estimates

Estimating semi-detailed

Fixed capital investment detailed estimate method

Semi-Detailed Estimate Example - Case Study

Semi-detailed estimating procedure

© 2024 chempedia.info