Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Estimate preliminary

The Zond VD - 96 is intended for the detection of cracks, precipitates, inclusions etc. and corrosive defects with the preliminary estimation of their depth in various objects of magnetic and non - magnetic steels, non-ferrous and refractory metals and welds including coatings. [Pg.342]

Extension of the appHcations of polymethine dyes has required special spectral and other characteristics. As a rule, the search for and synthesis of promising new compounds having desired properties imply the preliminary estimation of their most important parameters on the basis of elaborated theoretical conceptions. Thus, an effective way of governing electron properties consists of the variation of molecular topology of polymethines. [Pg.499]

Estimates for 1993 are preliminary. Estimates are for steam-electric plants >10 MW, based on fuel consumption data. [Pg.90]

Preliminary Estimates of Repeatability. Initial estimates of repeatabihty should be obtained before embarking on any significant test program. Such information may be available from previous testing if it is not, vaUd preliminary mns should be conducted at different times under supposedly identical conditions. If these mns result in large variabiUty in performance, the important variables that affect the results have not been identified, and further research may be needed before the proposed experiment can commence. [Pg.522]

More detailea descriptions of small-scale sedimentation and filtration tests are presented in other parts of this section. Interpretation of the results and their conversion into preliminary estimates of such quantities as thickener size, centrifuge capacity, filter area, sludge density, cake diyness, and wash requirements also are discussed. Both the tests and the data treatment must be in experienced hands if error is to be avoided. [Pg.1751]

Power dissipation can lead to temperature increases of up to 40°C in the mass. Note that evaporation of liquid as a result of this increase needs to be accounted for in determining liquid requirements for granulation. Liquid should be added through an atomizing nozzle to aid uniform hquid distribution in many cases. In addition, power intensity (kW/kg) has been used with some success to judge granulation end point and for scale-up, primarily due to its relationship to granule deformation [Holm loc. cit.]. Swept volume ratio is a preliminary estimate of expected power intensity. [Pg.1895]

Table 21-5 indicates screw-conveyor performance on the basis of material classifications as listed in Table 21-4 and defined in Table 21-3. Table 21-6 gives a wide range of capacities and power requirements for various sizes of screws handling 801 kg/m (50 lb/ fU) of material of average conveyabihty. Within reasonable limits, values from Tables 21-5 and 21-6 can be interpolated for preliminary estimates and designs. [Pg.1915]

Once identified, the costs and/or savings are placed into their appropriate categories and quantified for subsequent analysis. Equipment cost is a function of many variables, one of the most significant of which is capacity. Other important variables include operating temperature and/or pressure conditions, and degree of equipment sophistication. Preliminary estimates are often made using simple cost-capacity relationships that are vahd when the other variables are confined to a narrow range of values. [Pg.2170]

For the effective diffusivity in pores, De = (0/t)D, the void fraction 0 can be measured by a static method to be between 0.2 and 0.7 (Satterfield 1970). The tortuosity factor is more difficult to measure and its value is usually between 3 and 8. Although a preliminary estimate for pore diffusion limitations is always worthwhile, the final check must be made experimentally. Major results of the mathematical treatment involved in pore diffusion limitations with reaction is briefly reviewed next. [Pg.25]

A preliminary estimate is useful for the linear velocity to be used on the catalyst under study. The linear flow is known for an existing process. For a new process, it can be estimated from flow used in similar processes. An estimate can also be developed for the minimum flow to avoid gradients from calculations (to be presented in Appendix C.)... [Pg.67]

For the preliminary estimate of the expected efficiency of expansion turbines, in most cases it is sufficient to neglect Reynolds number effects (Rg > 10 ) and use the efficiency and specific speed correlations shown in Figure 2-12 for partial admission axial impulse, reaction radial inflow and full admission impulse and reaction axial turbines. Due to the economic advantage of the radial turbine, die radial inflow turbine is die best selection when operating in die specific speed range 20 < Nj < 140, whereby die optimum efficiency will be achieved at N, = 80. [Pg.36]

The question can be asked, Why estimate the concrete, steel, piping, electrical, etc., when the total plant can be estimated from major equipment in one step It is better to show all of the accounts because later estimates will be made this way and the preliminary estimate can be used to check the new estimate. Further, an experienced estimator gets a feel for each account, which allows recognition of errors in early estimates. [Pg.231]

Preliminary estimates of costs in foreign countries are difficult due to rapidly changing conditions overseas. For the many companies that do not have construction experience in foreign countries, or in the one being considered, help from a contractor who has built plants in that country is necessary in adjusting U.S. costs. If literature data is needed. References 30 and 31 give some data on foreign construction. [Pg.234]

A key aspect in most cost estimation studies is the evalutUion of the cost of individual pieces of equipment. In addition to quotations from equipment manufacturers, there are several methods for developing cost estimates. For a typical conceptual design, it is normally acceptable to develop an order of magnitude or preliminary estimate whose accuracy is within -h/— 25 to 50%. The following methods may be employed to develop order of magnitude estimates ... [Pg.303]

It should be noted that most of these theories for the prediction of the pressure losses in cyclones ultimately require the assignment of certain experimentally determined quantities in order to produce reasonable agreement between theory and experiment. The involvement of these empirical constants almost certainly restrains the use of the theories to the limited group of cyclones that the experiment has covered in order to produce good predictions of pressure drops through the cyclone. Therefore, these empirical theories may be used only as a preliminary estimate of the energy consumption in cyclones. Prototype cyclone experiments may well be required in order to obtain an accurate value of the pressure loss for a newly designed cyclone. [Pg.1208]

It will be intriguing to theoretically examine the possibility of superconductivity in CNT prior to the actual experimental assessment. A preliminary estimation of superconducting transition temperature (T ) for metallic CNT has been performed considering the electron-phonon coupling within the framework of the BCS theory [31]. It is important to note that there can generally exist the competition between Peierls- and superconductivity (BCS-type) transitions in lowdimensional materials. However, as has been described in Sec. 2.3, the Peierls transition can probably be suppressed in the metallic tube (a, a) due to small Fermi integrals as a whole [20]. [Pg.48]

The second matrix. Figure 2-9, helps you begin to estimate levels of effort and associated costs for your initial planning. Keep in mind that these can only be very preliminary estimates at this point. However, it s useful to start the process with this kind of discipline, recognizing that the results will be subject to continuous rehnement. [Pg.37]

Rindner et al, Preliminary Estimate of Concrete Thicknesses and Construction Costs of Laced Reinforced Concrete Structures , PATR 4441... [Pg.63]

Samples of blood and excreta are taken for laboratory analysis. It is expected that, at the end of this phase, you will have a preliminary estimate of the maximum dose that may be safely tolerated in humans, and also a basic profile of the drug s pharmacokinetic behaviour. Depending on the availability of appropriate analytical indicators, pharmacodynamic and indicative efficacy data may also be generated. The data acquired must be carefully analysed and assessed so that, based on the findings, appropriate Phase II trials can be planned. [Pg.74]

Substance Abuse and Mental Health Services Administration Emergency Department Trends from the Drug Abuse Warning Network, Preliminary Estimates January-June, 2001 with Revised Estimates 1994—2000 (DHHS PublNoSMA-02-3634). Rockville, MD, Substance Abuse and Mental Health Services Administration, 2001... [Pg.108]

Stewart RD, Fisher TN, Hosko MJ, et al Experimental human exposure to methylene chloride. Arch Environ Health 25 342-348, 1972 Substance Abuse and Mental Health Services Administration Preliminary Estimates from the 1995 National Household Survey on Drug Abuse. Rockville, MD, U.S. Department of Health and Human Services, 1996 Tenenbein M, PillayN Sensory evoked potentials in inhalant (volatile solvent) abuse. J Paediatr Child Health 29 206-208, 1993... [Pg.312]

LRG ]) provides a preliminary estimate for the bimolecular rate constant of GTPyS binding ( 2 x 10 /ilf s ). This estimate is within an order of magnitude of the rates of GTP binding to another G protein (23). [Pg.63]

The approximate dissymmetry correction may then be computed from Vr /X using Eqs. (31) and (32). Corrections so calculated are not regarded as acceptable substitutes for actual dissymmetry measurements, but they may prove highly useful as preliminary estimates of the correction. [Pg.301]

Calculate the emission rate of each species of interest for the samples. Then compute preliminary estimates of the sample mean (Er), variance (S] ), and the coefficient of variation (CV ) for each zone K (for each species). [Pg.94]

The above procedure can be modified somewhat to minimize the overall computational effort. For example, during the computation of the Information Indices in Step 1, matrix Anew can also be computed and thus an early estimate of the best grid point can be established. In addition, as is the case with algebraic systems, the optimum conditions are expected to lie on the boundary of the operability region. Thus, in Steps 2, 3 and 4 the investigation can be restricted only to the grid points which lie on the boundary surface indicated by the preliminary estimate. As a result the computation effort can be kept fairly small. [Pg.199]

Assessing the resources available for method development should also be done before beginning a project. The resources available include not only HPLCs, detectors, and columns, but also tools for sample preparation, data capture and analysis software, trained analysts, and especially samples representative of the ultimate analyte matrix. Also, it should be considered whether a fast, secondary method of analysis can be used to optimize sample preparation steps. Often, a simple colorimetric or fluorimetric assay, without separation, can be used for this purpose. A preliminary estimate of the required assay throughput will help to guide selection of methods. [Pg.28]


See other pages where Estimate preliminary is mentioned: [Pg.28]    [Pg.297]    [Pg.864]    [Pg.872]    [Pg.1164]    [Pg.1275]    [Pg.1691]    [Pg.173]    [Pg.426]    [Pg.18]    [Pg.39]    [Pg.133]    [Pg.51]    [Pg.73]    [Pg.248]    [Pg.211]    [Pg.18]    [Pg.77]    [Pg.412]    [Pg.354]    [Pg.201]    [Pg.315]    [Pg.237]    [Pg.154]   
See also in sourсe #XX -- [ Pg.243 ]

See also in sourсe #XX -- [ Pg.160 , Pg.161 ]

See also in sourсe #XX -- [ Pg.306 ]




SEARCH



Cost estimation preliminary

Preliminary

© 2024 chempedia.info