They attend to and control different technical plants and systems, and they have to deal with all processes required. In data-based plants, controllers usually communicate with one or several local or central computers. [Pg.777]

It is these differences in in-house boiler plant facility resources and the perceived need to obtain technical support from an external source that led me to consider grouping boiler plant systems in a slightly different way than is typically perceived, which in turn provided a focus for this book. Thus, although commercial, industrial, and utility steam generators can be classified in several different ways (such as by pressure, output, fundamental design type, etc.), their owners and operators can be classified as members of one or other of only two groups. [Pg.999]

Is one model scale sufficient or should tests be carried out in models of different sizes One model scale is sufficient if the relevant numerical values of the dimensionless numbers necessary to describe the problem (the so-called process point in the pi space describing the operational condition of the technical plant) can be adjusted by choosing the appropriate process parameters or physical properties of the model material system. If this is not possible, the process characteristics must be determined in models of different sizes, or the process point must be extrapolated from experiments in technical plants of different sizes. [Pg.21]

The typical incident report will be maintained in the technical report system, unless the team chairman or legal council recommends that it is inappropriate for this incident. The original signed incident report is filed in the technical report system. Copies are sent to the affected plant manager, production superintendent, second-level supervisor, process safety manager, the investigation team chairman, and others as deemed appropriate by the chairman. [Pg.301]

Hydroformylation refers to the addition of hydrogen and carbon monoxide to unsaturated systems. The hydroformylation of olefins is also known as the oxo synthesis or the Roelen reaction in honor of its inventor. It is one of the major industrial processes. Technical plants use cobalt- or rhodium-based catalysts the active species are supposed to be mononuclear complexes (194). The most desired oxo product is butanal, generated by the hydroformylation of propylene (195). [Pg.80]

Six different types of pump are used to evacuate a vacuum system. The first and most common is the mechanical displacement pump [226,227]. The second is the vapour stream pump [228]. The third is the modem turbomolecular pump [229]. The fourth type is the chemical getter pump. The fifth is the ion pump and the sixth is the cryogenic pump [230]. In technical coating systems, the first three types of pump are preferred. The development of these pumps is narrowly associated with the names W. Gaede, I. Langmuir, C. Burch, K. Hickman and W. Becker [221,225]. Cryogenic pumps have also been used to evacuate technical coating plants. [Pg.161]

Yeast is the third expression system used to produce biopharmaceuticals. As mammalian systems, they possess the ability to cany out post-translational modifications of proteins, although the glycosylation pattern usually varies somewhat from the patterns observed on the native protein or on the protein expressed in mammalian cells. Two recombinant proteins expressed in Saccharomyces cerevisiae are now approved for general medical use hepatitis B surface antigen vaccine and the anticoagulant Hirudin . Alternative promising production systems, in particular transgenic animal and plant systems, are still in development but these systems have to prove that they are technically and economically attractive. [Pg.246]

Mizuta, H.M. and Johansen, C.A. (1972). The Hazard of Plant-Systemic Insecticides to Nectar-Collecting Bees. Technical Bulletin 72, Washington Agricultural Experiment Station, College of Agriculture, Washington State University, p. 8. [Pg.127]

In other cases, the multi-channel system will offer new functionalities like integrated gas, fluid or power transport. A very interesting application in the building industry would be the use of the side channels for incorporating pultruded carbon composite rods. The carbon rods could be incorporated and fixed during the pultrusion process of the technical plant stem under a certain pre-tension load. The use of the technical plant stems as... [Pg.306]

In the preceding sections only failures of technical components were treated. This is not enough for the analysis of a technical system. Building, operating and maintaining a technical plant requires human interventions. The extent to which these are necessary depends on the degree of automation of the plant. In general... [Pg.387]

Errors made by humans when interacting with technical plants do not always have to impair them seriously. This is especially true for so-called fault-tolerant or fault-forgiving systems. Thus, only errors are of interest here which have detrimental consequences. [Pg.389]

To improve the conditions of maintenance of the reactor plant systems and equipment the appropriate experience is taken into account as well as the practices applied by Western specialists, including the results of international assessment of technical solutions accepted in the V-392 design. [Pg.145]

The scope of the safety assessment is to check that the design meets the requirements for management of safety, the principal technical requirements, the plant design and plant system design requirements given in Sections 3-6 of Safety of Nuclear Power Plants Design [1], and that a comprehensive safety analysis has been... [Pg.3]

Each of the items covered as Good Intentions showed a flaw in judgment. None of the problems were unique, and no decision was so urgent that the change needed to be accomplished immediately without a discussion. All technical plant employees could easily imderstand the problems after they occurred and most of the technical employees could have spotted the weaknesses prior to the incident, if they were afforded the opportunity for a well-disciplined review. (The sewer incident may have been mote difficult to spot since sewer systems are not always appreciated as a piece of process equipment. Sewers can occasionally be a tubular reactor.) All of these incidents were the result of changes with unintended side effects. [Pg.60]

As a third item, technical feasibility of the process has to be considered, as well as the costs of the decontamination and of the installations and the chemicals required. If plant systems (e. g. pumps, heat exchangers) are needed for the procedure, as is sometimes the case in the decontamination of subsystems and full primary systems, then the parameters of the procedure must be tailored to the conditions of these systems. As often only limited space is available in the plant, the extent of additional equipment required must be kept low. The time needed for carrying out the process is also an important parameter, in particular when the decontamination is on the critical path of a plant outage. This impUes that the procedure and installations have to be qualified prior to beginning decontamination work a sufficient number of specialists as well as sufficient time for preparatory work, therefore, is an indispensable requirement. In this preparatory work it has to be remembered that the decontamination will result in the transport of a considerable amount of radioactivity from the treated circuit or component to the decontamination equipment therefore, health physics considerations have to be taken into account, possibly requiring shieldings and/or remote-controlled facilities. [Pg.378]

The potential of endangering by a technical installation constitutes the totality of toss of human life and damage to property in the environment of said plant or system, which may be foreseen under certain clearly defined circumstances and conditions. These defined conditions relate to normal operation of the technical installation, to impaired operational conditions influenced by hypothetical incident conditions, as well as to the conditions prevalent after utilization of said technical plant. [Pg.8]

Concept Analysis of the Technical Plant after Planning. Preliminary hazard analysis and system structure analysis are intended to facilitate safety evaluation of the planned installation from the basic concept. Comprehensiveness of observation depends on the danger level of the installation. After concluding this work, basic changes in the technical procedure frequently become necessary and must be incorporated into the planning. [Pg.91]

The incorporation of a technical diagnostic system, an adviser for the operators providing a quick assessment of the plant state, state of the individual systems and equipment, and producing recommendations on plant control during accidents, including identification of the most effective methods to be applied to return the plant to a safe state ... [Pg.246]


See other pages where Technical plant system is mentioned: [Pg.44]    [Pg.321]    [Pg.148]    [Pg.21]    [Pg.108]    [Pg.56]    [Pg.122]    [Pg.406]    [Pg.27]    [Pg.222]    [Pg.343]    [Pg.295]    [Pg.302]    [Pg.303]    [Pg.3]    [Pg.4]    [Pg.78]    [Pg.347]    [Pg.65]    [Pg.30]    [Pg.2]   