The procurement specifications or the vendor s engineering catalog will provide all of the recommended horsepower ratings needed for an analysis. These recommendations assume normal operation and must be adjusted for the actual operating conditions in a specific application. [Pg.579]

ISO 8829 1990 Aerospace - Polytetrafluoroethylene (PTFE) hose assemblies - Test methods ISO 8913 1994 Aerospace - Lightweight polytetrafluoroethylene (PTFE) hose assemblies, classification 204 degrees C/21000 kPa - Procurement specification ISO 9528 1994 Aerospace - Standard-weight polytetrafluoroethylene (PTFE) hose assemblies, classification 204 degrees C/21000 kPa - Procurement specification ISO 9938 1994 Aerospace - Polytetrafluoroethylene (PTFE) hose assemblies, classification 204 degrees C/28 000 kPa- Procurement specification ISO 10502 1992 Aerospace - Hose assemblies in polytetrafluoroethylene (PTFE) for use up to 232 degrees C and 10 500 kPa - Procurement specification ISO 13000-1 1997 Plastics - Polytetrafluoroethylene (PTFE) semi-finished products -Part 1 Requirements and designation... [Pg.488]

Revise the procurement specifications for the gaskets used in this iine Verify that the revised procurement standard contains the specification for the proper gasket... [Pg.261]

MOTOR SHALL BE IN CONFORMANCE WITH FOLLOWING CTANDARD PROCUREMENT SPECIFICATION ... [Pg.708]

In addition to the standards of companies and groups, such as societies and associations, a large number of standards are issued by city, county, state, and federal government agencies. A great percentage of such standards are procurement specifications. [Pg.450]

Summary This chapter describes how to use materials standards in a procurement specification, the types and acceptability of product certifications, the roles of responsible parties in the supply chain, and how to develop accurate computerized descriptions. Also discussed is the issue of replica pans. [Pg.11]

The design firm normally generates procurement specifications. These specifications will include definition of all major components such as materials of construction, agitator requirements, nozzles, etc. Major equipment for API processing is similar to fine chemical production and can include reactors, centrifuges, condensers, heat exchangers, distillation columns, extractors, absorption equipment, chromatography equipment, dryers, blenders, crystallizers, mills, etc. These components wiU normally require validation [installation... [Pg.143]

These requirements are invoked in design contracts, construction contracts, overhaul contracts, the fleet maintenance manual and spare parts procurement specifications, and so on. [Pg.449]

Procurement specifications for the valves stipulate that vendor shall submit either detailed calculations and/or test data to demonstrate operability when subjected to seismic excitation. The decision to accept actual or prototype test data or analysis for operability assurance is made during the normal design and procurement process. The decision to test is based on (1) whether the component is amenable to analysis, (2) whether proven analytical methods are available, and (3) whether applicable prototype test data are available. If analysis or prototype test data are not sufficient, testing will be conducted to qualify the component or to verify the analytical technique. The valves shall be designed to have a first natural frequency which is greater than 33 Hz. This is shown by suitable test or analysis. [Pg.167]

All raw materials are subject to the QA/QC system prior to acceptance. Raw materials are controlled for their compliance with procurement specifications. A conformity file is systematically established that documents the quality of glass frit and chemical reagents, the glass canister procurement, the smear test swab, and welding torches. In addition, Cogema is performing audits and inspections of the raw materials suppliers. [Pg.100]

Military Procurement Specification, QPL 5542-6, "Thread Compound. Anti-Seize and Sealing, Oxygen Systems," U. S. Government Printing Office (July 12, 1954). [Pg.128]

The acceptance (proof) test is also used for electrical and mechanical components to demonstrate their seismic adequacy. It is typically performed by manufacturers to demonstrate compliance with procurement specifications and should not be used in the evaluation of seismic margins or the analysis of failure modes. Such testing is typically carried out by means of a shaking table. [Pg.38]

Each instrument performance characteristic that is important to the application should be identified in the procurement specification. The specification will become part of the bid package that is sent to the vendors. In the bid package also state that the vendor must provide evidence with the quotation that the proposed instrument can meet those specifications, and on installation of the instrument, the manufacturer s installer must demonstrate that the instrument installed at your location meets those specifications. [Pg.971]

Misapplication is another major cause of premature seal failure. Little attention is generally given to the selection of mechanical seals. Most plants rely on the vendor to provide a seal that is compatible with the application. Too often there is a serious breakdown in communications between the end user and the vendor on this subject. Either the procurement specification does not provide the vendor with appropriate information, or the vendor does not offer the option of custom ordering the seals. Regardless of the reason, mechanical seals are often improperly selected and used in inappropriate applications. [Pg.383]

It shall be ensured that items and services under procurement meet established requirements and perform as specified. Suppliers shall be evaluated and selected on the basis of specified criteria. Requirements for reporting deviations from procurement specifications shall be specified in the procurement documents. Evidence that purchased items and services meet procurement specifications shall be made available for verification before the items are used or the services are provided. [Pg.27]

Market surveys indicate that thin prismatic-sealed Ni-MH batteries are widely used in several applications, where portability, low-power consumption, compact packaging, and minimum room-temperature storage loss are the principal procurement specifications. The cathode of the Ni-MH battery produces a cobalt oxide (CoO), which has much higher conductivity than nickel oxide hydro oxide (NiOOH). The addition of yttrium oxide (YjOj) increases the utilization of the positive ions. Oj that evolves at the positive electrode on overcharge could oxidize the separator element. Therefore, a chemically stable separator material is needed to avoid the oxidation of the separator. The suffocated polypropylene is the most suitable separator material to avoid oxidation. [Pg.216]

Performance phase Assessment of the entire system, sufficient for procurement specifications for constmction of a demonstration plant validation of waste management strategy materials capabilities are optimized under prototypical conditions detailed cost evaluation— conceptual design, 10—20 years needed. [Pg.253]

Improvements of sections on technology to introduce new processes such as forgings or welding, improvement of the procurement specifications (referred to as Specification Technique de Reference in RCC-MRx) to make them fully compatible with the industrial practice ... [Pg.625]

Among the improvements achieved by the detailed consideration of ergonomics in the procurement specification were ... [Pg.34]

WSRC shall submit for DOE staff approval prior to restart, a program that defines the use of the SEL. Specifically, WSRC shall describe how the SEL is to be used for maintenance, inspection, testing activities, procurement specifications or other activities. [Pg.144]

DPSOP-338-208-1 (Reference 35) provides requirements for the identification and control of procured items. The process for the procurement and validation of vendor and contractor services is provided by the procedures that outline the procurement process and is verified by a process provided in DPSOL 338-207-3, "Supplier Evaluation Program" (Reference 36). The requirements for the proper storage of materials is initiated by DPSOL 338-204-1, which specifics storage requirements for procurement purposes. DPSOL 338-208-1 addresses the applicable identification and class storage requirements to implement the procurement specifications. The DPSOLs and RD 3.1 implement the basic requirements of QA Manual, IQ, related to procurement for safety-related applications. [Pg.518]

As we shall see in Chapter 5, the PHA is used in support of the Preliminary Design Review (PDR) milestone to develop the requirements for new procurements while developing the statement of work or procurement specification for new hardware for the program. Completion of the PHA is required in support of the PDR to verify that the technical safety requirements have been incorporated into the preliminary design of the item for procurement. Hazards identified in the PHA will be updated in the System Hazard Analysis (SHA) and the Subsystem Hazard Analysis (SSHA) as the life cycle progresses. [Pg.43]


See other pages where Procurement specification is mentioned: [Pg.244]    [Pg.153]    [Pg.282]    [Pg.442]    [Pg.149]    [Pg.28]    [Pg.51]    [Pg.350]    [Pg.26]    [Pg.150]    [Pg.350]    [Pg.366]    [Pg.1025]    [Pg.126]    [Pg.89]    [Pg.1029]    [Pg.231]    [Pg.54]    [Pg.319]    [Pg.647]    [Pg.228]    [Pg.243]    [Pg.289]    [Pg.625]    [Pg.236]   