Delivery schedule

Other constrains (availability and delivery schedule of tools, production schedules)... [Pg.196]

Vendor information (available materials, their composition, properties and applications available sizes, shapes and geometry availability, delivery schedule, cost and performance data)... [Pg.196]

One aspect of a contract often overlooked is shipment of finished goods. You have ascertained the delivery schedule, the place of delivery, but how do you intend to ship it by road, rail, ship, or air. It makes a lot of difference to the costs. Also delivery dates often mean the date on which the shipment arrives not the date it leaves. You therefore need to build into your schedules an appropriate lead time for shipping by the means agreed to. If you are late then you may need to employ speedier means but that will... [Pg.224]

Subcontractor development should not be limited to the assessment for compliance to ISO/TS 16949 as indicated in Note 1. The standard contains the minimum requirements and, with the requirement for continuous improvement, it may be necessary to work with some of your subcontractors in order to develop their capability to improve process capability and delivery schedules or reduce avoidable costs. You can t develop all your subcontractors and hence Note 2 of the standard indicates that you should prioritize subcontractors for development based upon performance and importance of product or service supplied. [Pg.324]

Delivery schedules must also be considered. Monolithic sheets are generally cut to exact size at the factory. Depending on the laboratory s location, delivery may be slow or occasionally go wrong altogether. Half of the tops destined for a new laboratory in California went to Alaska, while the Alaska tops ended up in California. This caused serious delays in two building projects. [Pg.81]

The students used the Gantt chart to plan and monitor the project progress. Each team prepared a detailed list of tasks, milestones and deliverables. A timeline was constructed based on the completion time, delivery schedule and estimated time needed to complete each tasks. The Gantt chart enabled the students to identify dependency between various tasks and recognize potential bottlenecks in the project. The critical tasks, scheduled tasks, completion dates and delivery time were clearly labeled. Each week the teams met to discuss and update the Gantt chart, as old tasks were completed and new one started. [Pg.356]

Different types of wholesalers may be used to meet different needs within the pharmacy. For example, one wholesaler may offer a better delivery schedule, a more... [Pg.75]

It is useful to compare the circadian patterns of 5-FU delivery with the more conventional constant infusion drug-delivery pattern, in which the amount of 5-FU delivered over the 24-h period is the same as for the circadian delivery schedules. The quantity of 5-FU (Qsfu) delivered over 24 h according to the semi-sinusoidal schedule defined by Eq. (3) is given by Eq. (5) ... [Pg.284]

The cases of peak delivery at 10 a.m. (Fig. 10.5b) or 10 p.m. (Fig. 10.5d) are intermediate between the two preceding cases. Overlap between the peak of 5-FU and the peak of cells in S phase is only partial, but it is still greater in the case of the peak at 10 a.m., so that this pattern is the second most toxic, followed by the circadian delivery centered around 10 p.m. The comparison of the four panels Fig. 10.5a-d explains the results of Fig. 10.4a on the marked differences in cytotoxic effects of the four 5-FU circadian delivery schedules. The use of the cell cycle automaton helps clarify the dynamic bases that underlie the distinctive effects of the peak time in the circadian pattern of anticancer drug delivery. [Pg.287]

The results presented here point to the interest of measuring, both in normal and tumor cell populations, parameters such as the duration of the cell cycle phases and their variability, as well as the presence or absence of entrainment by the circadian clock. As shown by the results obtained with the cell cycle automaton model, these data are crucial for using the model to predict the differential outcome of various anticancer drug delivery schedules on normal and tumor cell populations. In a sub-... [Pg.292]

Procurement in a small project is usually a joint effort between CED and the plant s purchasing department. Normally, the Project Manager, with help from CED specialists, as required, writes the requisitions, and the plant writes the purchase orders. Expediting and inspections can be provided by either one. However, it is up to the Project Manager to keep up with delivery schedules and take the necessary action to correct slippages. [Pg.10]

Apply intensive expediting effort on critical problems that may affect the delivery schedule. [Pg.182]

Announcement. An established product with existing markets is introduced by a company making it for the first time and in competition with established manufacturers. The purpose here is to direct demand to the announced product on the basis of merits, such as purity, and certain advantages, such as technical service facilities and delivery schedules. [Pg.128]

For any FISC there exist two major markets for packed fruit regional (RPFC) and overseas (OPFC). Concentrated juice only possesses the overseas market (OCJC). Two types of demands are considered. A fixed demand is conformed by the amounts of packed fruit and juice agreed with the different clients before the fruit season. For such compromises there is a specific time delivery schedule. An eventual demand represents the possibility of allocating the excess of goods at a lower price in any period (X15andX16). [Pg.189]

Delivery schedules should be established and routes planned, taking local needs and conditions into account. Such schedules and plans should be realistic and systematic. Care should be taken to ensure that the volume of pharmaceutical products ordered does not exceed the capacity of storage facilities at the destination. [Pg.194]

Plant Managers Delivery schedule to demonstrate lead times... [Pg.332]

History has a tendency to repeat itself, which in this case meant that due to a compressed delivery schedule, there was only very limited time available to gain a good understanding of the new route and, furthermore, to improve on some of the underperforming steps. A quick scale-up to satisfy the needs for API, to initiate clinical phase I studies, resulted in a yield of only 0.3%, which did not compare favorably to the laboratory yield of 5%. This batch produced 2 kg of robaizotan of outstanding quality with an enantiomeric purity >99% ee. The major flaws in the chemistry (expressed as poor yields) occurred exactly where they had been projected as mentioned previously, and it was obvious from working on pilot scale that virtually all steps were hampered by low volume efficiency (amount of material produced per unit reactor volume) and complicated workup procedures. [Pg.118]

To meet this challenge, the U. S. chemical industry will have to stress several facets of technical service and applications research. Important among these will be ease of communication and prompt attention to customer needs. There will always be delays and the possibility of misunderstanding the problem. Our experience has been that relaying information from one part of an organization to another can result in loss of accuracy and in some cases the problem is completely misunderstood. Technical service, working with the production department and the traffic department, can work out delivery schedules which cannot be met by foreign competition. [Pg.124]

These suggested changes should be made at an early stage of design, because they affect exchanger design, fabrication and delivery schedules. [Pg.240]

A proper cost and economic analysis can only be made after all the invited manufacturers have fully complied with the details of the enquiry specification. The engineer must satisfy himself that this requirement has been properly met, otherwise a low bid price may indicate non-compliance or poor understanding of the enquiry specification. Apart from the important technical requirements there are often other engineering considerations that should be taken into account, e.g. vendor documentation, spare parts, delivery schedule, obsolescence, testing and inspection. Some of these aspects have a definite cost impact whereas some are somewhat intangible, e.g. history of performance, delivery schedule, obsolescence. [Pg.172]

A reverse auction is where a buyer solicits offers from sellers by specifying terms of trade that include product specification, price, delivery schedule and so on. Once interested sellers are notified and assembled, they may compete by lowering their offers until one is accepted by the buyer. Alternatively, offers may be accepted as sealed bids until one is chosen. In this regard, a reverse auction is more akin to a buyer auction, commonly found in business procurement and government contracting. [Pg.275]

A description of final deliverables, intermediate deliverables and delivery schedule... [Pg.1278]

Since becoming more sophisticated in the past few years because of real-time optimization capabilities (determining the best tender, given pricing and volume discounts, delivery schedules, and consignee), TMS packages will continue to be connected to a company s other business systems. [Pg.2068]

Companies should consider whether to make components or the final product in-house or purchase them from outside vendors. Price is usually the deciding factor, but other factors ctm affect the final decision. Some of these factors are can production demand requirements be fulfilled, can qimlity expectations be met, and can delivery schedules be met Likewise, it might be better to use a supplier because they may have been producing similar parts for years and have the expertise to produce better parts than the company making the estimate. It is always wise to develop these estimates for comparison. [Pg.2298]


See other pages where Delivery schedule is mentioned: [Pg.348]    [Pg.50]    [Pg.244]    [Pg.80]    [Pg.97]    [Pg.50]    [Pg.8]    [Pg.177]    [Pg.177]    [Pg.391]    [Pg.276]    [Pg.277]    [Pg.2722]    [Pg.2722]    [Pg.254]    [Pg.693]    [Pg.2402]    [Pg.339]    [Pg.73]    [Pg.178]    [Pg.332]    [Pg.982]    [Pg.1278]    [Pg.1502]   
See also in sourсe #XX -- [ Pg.28 ]




SEARCH



Scheduling of deliveries

Time Delivery Schedule

© 2024 chempedia.info