Estimating time

Whilst network analysis is a useful tool for estimating timing and resources, it is not a very good means for displaying schedules. Bar charts are used more commonly to illustrate planning expectations and as a means to determine resource loading. [Pg.297]

Urea and uracil herbicides tend to be persistent in soils and may carry over from one season to the next (299). However, there is significant variation between compounds. Bromacil is debrominated under anaerobic conditions but does not undergo further transformation (423), linuron is degraded in a field soil and does not accumulate or cause carryover problems (424), and terbacd [5902-51-2] is slowly degraded in a Russian soil by microbial means (425). The half-hves for this breakdown range from 76 to 2,475 days and are affected by several factors including moisture and temperature. Finally, tebuthiuron apphed to rangeland has been shown to be phytotoxic after 615 days, and the estimated time for total dissipation of the herbicide is from 2.9 to 7.2 years (426). [Pg.54]

Review Scheduling A review scheduhng procedure should be estabhshed that documents who is responsible for initiating the review and when the review(s) should occur during the project. The scheduling needs to balance availability of process information, review technique used, and the impact of potential review action items on project costs (i.e., early enough to minimize the cost of any potential changes to the process). The aclual amount of time needed for the review should also be stated in the procedure. On the basis of the number of project reviews required and the estimated time needed for each review, the project cost estimate should include the cost for project reviews as part of the total cost for the project. [Pg.2285]

Figure 49. Extrapolation of sedimentation data to estimate time for critical concentration. Figure 49. Extrapolation of sedimentation data to estimate time for critical concentration.
Estimated time required as systems are developed in step 4... [Pg.33]

Tlie simulated value of Ts corresponding to T = 74 and Tb = 104 is the smaller of these two values (i.e., 74). Tlie other simulated values of Ts are obtained in similar fasliion and listed in column 7. The average of tlie simulated values of Ts, 83, is tlie estimated time to failure of tlie system. [Pg.595]

The cement slurry chosen must have a thickening time that is greater than the estimated time obtained for the actual cementing operation using Equation 4-327. Thus, T > T. ... [Pg.1187]

Many project managers find it realistic to estimate time intervals as a range rather than as a precise amount. Another way to deal with the lack of precision in estimating time is to use a commonly accepted formula for that task. Or, if you are working with a mathematical model, you can determine the probability of the work being completed within the estimated time by calculating a standard deviation of the time estimate. [Pg.822]

For every methodology set up reasonable scenarios, that is, tentative analytical protocols with realistic , m, Sxx, estimated time, and costs. Make realistic assumptions about the quality of data that will be delivered under routine conditions, cf. Figure 1.7. [Pg.111]

After the clinical and imaging evaluation suggests the need for lAT, the anesthesia team is contacted and informed of the estimated time of arrival of the patient to the interventional neuroradiology suite. Qualifying patients referred from other... [Pg.71]

In general, expiration dating is based on the estimated time required for the active compound to reach 90 95% of labeled potency at the specified storage... [Pg.406]

To set up and operationalize DTCs, an estimated time of 2-2.5 months would be required by PROs once they are selected. To import the recycling system, erect the commission in India, the estimated time would be around 4—5 months. It is preferred that if DTCs are imported in first instance and made operational as in initial months, there would not be any feed stock available for the recycling unit. Once their operation is stabilized, one can import recycling unit and commission it. These facilities would be required to obtain necessary consent to establish and operate and also to obtain authorization from respective SPCBs in the state where they are commissioned. [Pg.435]

The estimated time required to achieve a fractional conversion of 0.99 is 1.80 h, and the temperature at this time is 333.5 K, if the reactor operates adiabatically. The fA(t) profile is given by the values listed in the second and last columns the T(t) profile is given by the third and last columns. [Pg.306]

Land use/land cover influences on the estimated time to recovery of inland lakes from mercury enrichment... [Pg.267]

Time to recovery (TTR) was calculated as the difference between the estimated time to system state (e.g., current wet deposition) and the year the lake was sampled. TTR varied from 0 to more than 134 y for recovery to wet deposition, from 8 to 168 y for background flux and from 9 to 70 y for background concentration. There was no consistent pattern among the estimates of TTR, that is, no single... [Pg.268]

Fig. 4.27. Estimated time (in hours) to thermal decomposition failure of hot-melt coating held at various constant temperatures. Fig. 4.27. Estimated time (in hours) to thermal decomposition failure of hot-melt coating held at various constant temperatures.

See other pages where Estimating time is mentioned: [Pg.729]    [Pg.480]    [Pg.81]    [Pg.84]    [Pg.85]    [Pg.93]    [Pg.97]    [Pg.535]    [Pg.535]    [Pg.535]    [Pg.536]    [Pg.536]    [Pg.32]    [Pg.32]    [Pg.32]    [Pg.33]    [Pg.33]    [Pg.223]    [Pg.822]    [Pg.252]    [Pg.101]    [Pg.480]    [Pg.249]    [Pg.623]    [Pg.482]    [Pg.166]    [Pg.339]    [Pg.72]    [Pg.99]    [Pg.111]    [Pg.111]    [Pg.150]   
See also in sourсe #XX -- [ Pg.21 ]




SEARCH



Delay Time Parameter Estimation

Divergence time estimates

Effective interaction potential estimated time

Estimated parameters for the Naphtha time series

Estimated-Time-of-Arrival

Estimating the Diffusion Depth and Time to Approach Steady State

Estimating the Rouse Time of an Entangled Chain

Estimating the Time Series Model Parameters

Estimation of Blend Time

Estimation of Breakthrough Time

Freezing time estimation

Functional barrier estimating the time it takes for styrene to travel through a material

Residence time distribution axial dispersion estimation

Time Estimation task

Time Frame of Requirement Estimates

Time estimation

Time estimation

Time evolution variable estimates

© 2024 chempedia.info