An example of a contractor selection plan for a preclinical study requiring GLP compliance is provided in the tables below. Tabular (checklist) type of examples are provided for ... [Pg.842]

Contractor Selection Detailed Engineering Procurement Construction Management Project Control Contract Administration Communications Regulations Compliance Startup... [Pg.5]

Business Planning Project Development Preliminary Engineering Contractor Selection EPC Startup Operation... [Pg.6]

Contractor selection is probably the activity that has the most lasting effect on project execution. A poor design or a bad estimate can always be revised and, if caught in time, the effects minimized. Changing a contractor after the work has started is a very difficult proposition that always has a negative impact on project cost and schedule. [Pg.9]

Engineering contractor selection bid package, bidding, evaluation, and award. [Pg.97]

The decisions made during the initial stage will fix the minimum cost of the project - design criteria, execution strategy, contractor selection, plant layout, project specifications, etc. [Pg.197]

AS ENGINEERS AND DESIGNERS BECAME PROFICIENT WITH THE SYSTEM, THE 3D CAD IN PARTICULAR, SOME CONTRACTORS APPEAR TO BE SPENDING AS MUCH AS 20-25% FEWER HOURS. IT HAS BECOME VERY IMPORTANT IN THE CONTRACTOR SELECTION PROCESS TO PAY SPECIAL ATTENTION TO THIS AREA OF CONTRACTOR EXPERTISE. [Pg.313]

The general contractor approach gives the responsibility for construction management to a construction contractor. Most often this contractor will be the one who will also hold the largest subcontract on the project. The major advantage of the arrangement is lower cost. It does not, however, come without price. The contractor selected may not have the qualified people to control the pjuts of the job in which he has no expertise, he may add parts of the project to his work scope that he is not qualified for, and the work he self-performs will not have the advantage of checks and balances on its quality. [Pg.767]

The contractors selected York Shipley four-cylinder in-line compressors powered by National R4AU6 six-cylinder diesel engines as the most suitable to fulfil the rather demanding requirements. These sets were larger than anticipated in the original estimate and it was impossible to fit them into the intended boilerhouse extension. Ground conditions and the presence of the power-house air-shaft limited the space available for extension west of the boilerhouse to only twenty feet, which was quite insufficient, so it was necessary to design a completely new 5,000 square foot plant house nearby. [Pg.64]

Contract engineering, 330-331 Contract maintenance, 1622 Contract manufacturing, 263-264, 330-331 Contractors, selection of, 1499 Contracts, 49... [Pg.2714]

Sinking fund factor (interest), 2339-2340 SIPs (state implementation plans), 590 SIRO (served in random order), 2157 Site selection and construction, 1465-1501 architect, selection of, 1496-1499 checklist, site selection, 1477-1489 community, selection of, 1476-1477 contractor, selection of, 1499 and customer satisfaction, 1468-1469 distribution network planning for, 1472-1475 environmental factors in, 1489 finalizing process of, 1490 and free trade zones, 1489-1490 linear programming applications for, 2056 network analysis for, 1470-1475 objectives of, 1465-1466 pitfalls of, 1466... [Pg.2780]

The standard makes it clear that a contract company s safety record is to be reviewed before they are hired and that safety record should be evaluated as part of the overall contractor selection process. Generally, the contractor s OSHA 300 logs will be used for this evaluation. [Pg.123]

Include the HSE performance of contractors in our contractor selection process, and require all contractors to conduct their work in a healthy, safe, and environmentally sound manner. [Pg.172]

Contractor selection Record keeping Contractor training Safety meetings Use of equipment Incident reporting Infractions... [Pg.728]

Specify minimum design [Pg.494]

Holt, G. D. 1998. Which contractor selection methodology International Journal of Project Management. 16(3) 153-164. [Pg.359]

A good reference on contractor selection procedures and the key safety, health, and environmental protection provisions to which contractors should adhere are discussed in the first chapter in Construction Safety Management and Safety Engineering. In addition, an Internet search (entering contractor safety requirements into any search engine) will yield a large number of downloadable procedures established by a variety of entities with respect to contractor selection and the safety performance expected of contractors while on an organization s premises. [Pg.200]

Human factors should be considered in the development of safe work practices. These safe work practices will normally apply to multiple locations and will normally be in written form (safety manual, safety standards, work rules, etc.). For some locations, site-specific work practices may be appropriate. The program should provide guidelines for selection and performance evaluation of contractors. API RP 76, Improving Owner and Contractor Safety Performance, may be helpful in developing guidelines for contractor selection. [Pg.177]

Your SEMS program must establish and implement safe work practices designed to minimize the risks associated with operating, maintenance, and modification activities and the handling of materials and substances that could affect safety or the environment. Your SEMS program must also document contractor selection criteria. When selecting a contractor, you must obtain and evaluate information r arding the contractor s safety and environmental performance. [Pg.178]

In 1990, the U.S. HUD issued interim guidance for lead paint identification and abatement methodologies for public and Indian housing under the above LBPPPA Amendments (55 FR 14556-14614). These guidelines were addressed to testing for lead-based paint, criteria for lead paint abatement contractor selections, specific lead paint abatement criteria and methodologies, cleanup postabatement, and waste disposal. [Pg.857]

Duty of Care requirements relating to contractor selection and the provision of appropriate information. [Pg.909]


See other pages where Selection contractors is mentioned: [Pg.842]    [Pg.846]    [Pg.9]    [Pg.42]    [Pg.86]    [Pg.137]    [Pg.137]    [Pg.145]    [Pg.145]    [Pg.149]    [Pg.728]    [Pg.214]    [Pg.566]    [Pg.141]    [Pg.178]    [Pg.178]    [Pg.211]    [Pg.213]    [Pg.214]    [Pg.215]    [Pg.238]    [Pg.41]   
See also in sourсe #XX -- [ Pg.728 , Pg.729 ]

See also in sourсe #XX -- [ Pg.45 , Pg.46 , Pg.94 , Pg.96 ]




SEARCH



Contractor bidders selection

Contractor management selection process

Contractor selection, installation

Contractors

Contracts contractor selection

Selecting EPC Contractors

Selecting the construction contractors

Selection of Installation Contractors

© 2024 chempedia.info