Detailed Engineering, Procurement and Construction

LOPA analysis is explained in Chapter 3 of this book. [Pg.33]

Process engineers (or EPC vendor) will prepare pre-commissioning and commissioning procedures, and also check lists for these activities. They will also train operators, and coordinate between the EPC contractor, operations and project departments. Pre-commissioning is performed in a systematic way to complete the following activities. [Pg.34]

After completion of pre-commissioning, the revamped plant will be commissioned by introducing raw materials and adjusting the plant operating parameters to the desired targets (Lawson, 1999). [Pg.34]


Project Manager has overall responsibility for Detailed Engineering, Procurement, and Construction. The Venture Manager and Project Manager are the two key managers in every successful capital construction project. The major part of this book is aimed at how tos for the Project Manager. [Pg.15]

Many companies engage specialist Engineering, Procurement, and Construction (EPC) companies, commonly known as contractors, at the detailed design stage. [Pg.7]

The detailed design phase or production engineering, as some people call it, consumes approximately 50% of all home office man-hours. It is during that phase that the bulk of the documents directly required for procurement and construction are generated ... [Pg.168]

Detailed engineering delivers all of the necessary documentation for procurement and construction and also for commissioning and normal operation. These documents are used as a basis for the following [47] ... [Pg.948]

Research and Development, Pilot Plant Materials Selection Preliminary Plant Design, Detailed Engineering, Procurement, Fabrication and Construction Considerations Plant Operation, Code Inspection, Maintenance Considerations... [Pg.50]

Current Status. The final DOE CCT cooperative agreement contract is currently being finalized. The required environmental and construction permits are also being finalized. Construction and major equipment procurement should begin in late 1992. Detailed engineering will be completed in 1993. Start-up and commercial operation is expected in 1995. [Pg.104]

Whether the machine foundations are designed by the vendor or by the project civil engineer in accordance with the vendor s requirements, there may be features, details, and tolerances requested which are difficult to achieve, expensive, and unnecessary. These circumstances are apt to come about as a consequence of the way the machines are procured the machine supplier may have little incentive to concern himself with the problems of foundation construction - on the contrary. [Pg.208]

A precise classification of the project status, in accordance with the general stipulations presented by the organizers, is not easily done the status of the BWR 90 project lies somewhere between D2 and D3 - pretty close to D3 even though all D3 activities have not been completed. To be more specific, the activities "design/engineering for all systems and components", and "detailed design, or detailed specifications, for procurement of all materials, components, systems, package units, construction/erection services, etc." have not been completed. [Pg.61]


See other pages where Detailed Engineering, Procurement and Construction is mentioned: [Pg.165]    [Pg.24]    [Pg.33]    [Pg.134]    [Pg.165]    [Pg.24]    [Pg.33]    [Pg.134]    [Pg.319]    [Pg.6]    [Pg.39]    [Pg.294]    [Pg.307]    [Pg.7]    [Pg.38]    [Pg.957]    [Pg.958]    [Pg.345]    [Pg.293]    [Pg.210]    [Pg.5]    [Pg.760]    [Pg.307]    [Pg.34]    [Pg.11]    [Pg.1]    [Pg.16]    [Pg.9]   