Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Scheduling manual

The main purpose of AUGUR4.2 expert ISI is the application to zones where some flaws (indications) had been revealed by scheduled manual ultrasonic inspections. Information provided by AUGUR 4.2 is used for decision-making further surveillance of these zones or corrective measures. The procedure of AUGUR 4.2 examination is included into the approved general scheme of ISI [1]... [Pg.195]

Notwithstanding the possibility of such automation, many successful operations depend almost entirely on manual sampling. Density determinations of the pulp on the media-return line and on each of the drainage screens are made at scheduled intervals, and the operator adjusts the media flow as needed. [Pg.1791]

With the advance of the turbine to idle speed, the turbine is ready to synchronize, and control is considered in synchronization. Both manual and automatic synchronizing are available locally. The unit is synchronized, and the main breaker closed. The speed reference will be switched to become a load reference. The speed/load reference will be automatically increased at a predetermined rate so that the fuel valve will be at the approximate position required for the desired load. For maintenance scheduling, the computer will count the number of normal starts and accumulate the number of hours at the various load levels. [Pg.644]

HVAC inspections Be thorough in conducting these inspections. Items such as small exhaust fans may operate independently from the rest of the HVAC system and are often ignored during inspections. As equipment is added, removed, or replaced, document any changes in function, capacity, or operating schedule for future reference. It may also be helpful to store equipment manuals and records of equipment operation and maintenance in the same location as records of occupant complaints for easy comparison if lAQ problems arise. [Pg.210]

Scheduling of work tasks and therefore labor utilization can be carried out in a number of different methods on a computer, depending on the software system purchased. These methods can be similar to the manual system or they may take the form of automatic scheduling. That is, the work tasks are entered into the computer system with the appropriate hours and trades and the software program automatically schedules the hours evenly over the weeks of the year. In implementing such scheduling care has to be taken to ensure that such items as weekends, statutory holidays, annual leave, annual shutdown and seasonal... [Pg.788]

The CPM was developed for the express purpose of applying computers to construction planning. However, it is equally as effective when used manually. This method has been well tested and it works. The CPM utilizes the contractor s knowledge, experience and practical ability in a common-sense manner to plan and schedule construction. [Pg.823]

Medical station - Site safety map - Up-to-date site safety plans Providing access to up-to-date safety and health manuals and other reference materials Interfacing with the public government agencies, local politicians, medical personnel, the media, and other interested parties Monitoring work schedules and weather changes Maintaining site security Sanitary facilities First-aid administration... [Pg.659]

Monitoring corrective action plans and schedules can be done manually. However, a computerized database can also be used to track all corrective actions. A computerized tracking system is of particular benefit when a large number of activities must be monitored. As a minimum, the system for tracking the status of corrective actions should ... [Pg.86]

Typical batch sizes are 200, 500 and 1000 kg, where within this study the largest batch size was not considered, since these products are produced in a regular fashion. The production is run in a two-shift operation, where two workers are responsible for the smaller batch sizes (200 and 500 kg). The bottling plants operate in continuous three-shift operation. On the weekend the production is shut down. Up to now, the scheduling of the production process is done manually with a planning horizon of one week. [Pg.45]

The main focus of the optimization process in PP/DS is the determination of production campaigns. On the basis of the results determined in SNP optimization, a detailed schedule which considers additional resources and products is created. This schedule is fully executable and there is no need for manual planner intervention, even though manual replanning and adjustments are fully supported within the PP/DS module. An executable plan can only be ensured by considering additional complex constraints in PP/DS optimization. These additional constraints include ... [Pg.251]

It has to be shown by means of internal audits, that the operation (i.e. the daily work in the laboratory) is in compliance with the quality system. This must be stated in the quality manual A schedule has to be defined and a standard procedure for internal audits has to be prescribed. [Pg.152]

Schedule and procedure must be documented in the quality manual... [Pg.152]

Regular management reviews are required by ISO/IEC 17025. They can show that the management system and the testing activities are suitable and effective. They have to be planned. The schedule and the procedure have to be documented in the quality manual. [Pg.153]

Prevention of abrupt discontinuation of intrathecal baclofen requires careful attention to programming and monitoring of the infusion system, refill scheduling and procedures, and pump alarms. Advise patients and caregivers of the importance of keeping scheduled refill visits and educate them on the early symptoms of baclofen withdrawal. Give special attention to patients at apparent risk (eg, spinal cord injuries at T-6 or above, communication difficulties, history of withdrawal symptoms from oral or intrathecal baclofen). Consult the technical manual of the implantable infusion system for additional postimplant clinician and patient information (see Warnings). [Pg.1279]

All aspects of a laboratory s program for the routine inspection, cleaning, maintenance, testing, calibration, and/or standardization of equipment must be in writing (i.e., SOPs, supplemented as necessary by equipment manuals). This would include a description of cleaning materials inspection, cleaning, and maintenance methods and schedules calibra-... [Pg.75]

In contrast to the minds-on approach of the study guide is Explorations in Conceptual Chemistry A Student Activity ATzwzW written by Jeff Paradis of California State University—Sacramento. Unlike the laboratories of a traditional lab manual, these activities are short and relatively easy to set up. They can be scheduled direcdy into the course syllabus or alternatively pulled together on the fly based upon student need as the semester progresses. The majority of these activities can be performed by students during class, which is a surefire way to maintain student interest. Many can also be performed by students outside of class as prescribed by the instructor. The primary goal of this booklet is to allow the student to learn chemistry by doing chemistry. [Pg.761]

A tabulation of all the available physical constants of TNT, with refs, was published in 1952 (Ref 23). Included are thermodynamic and crystallographic data, solubilities, and factors affecting chemical stability. Of the 57 properties listed, 28 were selected as most important, and the best values are cited. Another useful compilation of physical properties appeared in 1971 (Ref 43), but with limited refs a revised edition is scheduled for about 1980. Both of these reports are limited in distribution, as is a data manual published in England (Ref 18). Compilations of physical and other properties appeared in 1972 (Ref 51) this report has unlimited availability... [Pg.753]

Documents that cannot easily fit into the validation file or may be required on a day-to-day basis (e.g., supplier system manuals, calibration schedule, and records) may be filed elsewhere, and these should be identified on the document schedule stating where they are located and identifying who is responsible for them. All documentation provided by the supplier must be suitably marked to easily identify its location in the validation file. It is acceptable to have the system development records archived by the supplier. If the pharmaceutical manufacturer requires the supplier to store and maintain the documents there needs to be a formal agreement on the retention period. [Pg.629]

Instrument Schedule Interlock Matrix Alarm List Loop Schematics Wiring Diagrams O M Manuals Spares List... [Pg.630]

All equipment, including balances and hoods, nust be regularly maintained and so documented. Minimally, hoods should be checked on a yearly schedule. Dow Chemical Company uses the label shown in Figure 4 to document hood maintenance checks. Refrigerators and freezers nust have a temperature recorder of some type or be manually checked and the temperatures recorded. This covers the major GLP related items in the analytical laboratory. [Pg.85]


See other pages where Scheduling manual is mentioned: [Pg.1752]    [Pg.327]    [Pg.1752]    [Pg.327]    [Pg.442]    [Pg.52]    [Pg.776]    [Pg.462]    [Pg.253]    [Pg.464]    [Pg.565]    [Pg.362]    [Pg.30]    [Pg.30]    [Pg.64]    [Pg.243]    [Pg.30]    [Pg.99]    [Pg.99]    [Pg.133]    [Pg.225]    [Pg.268]    [Pg.101]    [Pg.166]    [Pg.446]    [Pg.118]    [Pg.396]    [Pg.2288]    [Pg.24]    [Pg.73]    [Pg.344]   
See also in sourсe #XX -- [ Pg.203 ]




SEARCH



© 2024 chempedia.info