Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Micro-leaks

A micro leak allows us to regulate the amount of gas flowing in the jar. Consequently, the micro leak regulates the total pressure as long as the gas is continuously pumped into the bell jar. [Pg.220]

The tin is then melted and heated at a temperature of 800°C for several seconds, in order to allow a possible outgasing. The gas is then introduced for the first time under a pressure of several thousand Pa. A second pumping is then performed until the pressure reaches 2 Pa. This ensures the device is completely rid of the air which was present at first. Once this operation is done, the gas is reintroduced at the desired pressure, which is regulated by the micro leak. After the stabilization of this pressure, the filament is heated at the desired temperature. To do so, we have to fix the electric power using a wattmeter (generally 25 W if T = 1,200°C). [Pg.224]

These operations are carried out using a micro leak. [Pg.242]

The regulation of the gaseous atmosphere is ensured by several valves (micro leaks). Two of them are linked to the gaseous circuit, and allow us to independently inject two gases in the reactor. [Pg.297]

Injecting proprietary formulation sealants arrested the leak points in the coils of the two sub headers and the coils were tested for healthiness. For remaining coils, a global sealant treatment was carried out to arrest micro leaks and the system was normalized and power operation resumed. [Pg.24]

The decision to stop running the reactor was taken after two successive defects were detected in the primary system containment (double envelope of reactor vessel). The first defect, which appeared in 1978, consisted of a sodium micro leak radioactive sodium aerosols were found in the double wall reactor vessel. Investigations did not find any liquid sodium in the gap nor locate the defect. The reactor was subsequently operated at a reduced power level (-0.6 Pn), which was high enough for irradiation needs but did not cause the leak to reappear. The second defect appeared in 1982 and consisted of a small leak from the nitrogen blanket surrounding the primary system. [Pg.287]

Off-the-shelf catalogue sales of micro reactors have just started [15]. With an increasing number of commercial products, quality control will become more important. Brandner et al. describe quality control for micro heat exchangers/reactors at the Forschungszentrum Karlsruhe [23]. All manufacturing steps are accompanied by quality control and documentation. Leak rates (down to 10 mbar 1 s for He) and overpressure resistance (up to 1000 bar at ambient temperature) are measured. Under standardized conditions, the mean hydraulic diameter is determined. Dynamic tests supplement this quality control. [Pg.96]

The vessel (V) consists of a hollow cylinder and two taps which are screwed onto the vessel shell. They are supplied with one hollow, where a small quantity of bacteriological cotton is fitted in order to avoid losses of micro-organism to the surroundings, and with a porous metallic filter (average pore-diameter, 5 pm) acting as a CCVdistributor. Such a filter (frit) allows the gas to flow and to get atomization in micro-bubbles, but it does not allow the liquid to leak. There are two seals the first one is in Teflon, between the tap and the filter, the second is a neoprene O-ring between the vessel and the tap. [Pg.635]

For the calibration and evaluation of kinetic response of pH electrodes, a Milton-Roy sapphire and Hastalloy pump (capable of 6,000 psi) were built into the pressure line in order to feed acid, base, or buffered solutions through the test vessel by way of stainless capillary tubing of 0.030-in. i.d. Outflow from this system can be controlled by means of two Hoke Micro-Metering valves which, when mounted in series, can provide an "engineered leak with an outfall that can be matched by the pump to allow system flows from 0.6 cm3/min to 16 cm3/min. Such a pumpable system allows fresh reference solution to be continuously added to the system while maintaining constant pressure. This avoids a possible pH drift caused by reactions between the walls of the test chamber and the reference solution. This system also allows... [Pg.202]

Adsorption isotherms were determined on a Cahn 1000 vacuum micro-balance system, using a Leybold-Heraeus Turbotronic TMP 120 turbomolecular pump for evacuation and a variable-leak valve for adsorbate gas injection. Approximately 0.3 grams of the sodium-exchanged zeolite was placed into a 1 cm. diameter hemispherical quartz sample pan within the adsorption chamber... [Pg.335]

The reaction between hydrogen atoms and hydrazine in a flow system has been investigated by Schiavello and Volpi . Hydrogen atoms produced in a micro-wave discharge were flowed into a vessel along with N2H4, under stirred reactor conditions. Under steady-state conditions the reactor vessel was sampled through a pin hole leak (25 /rm diameter) which led directly to a mass spectrometer ion source. [Pg.256]

When an apparatus of this type is used, it is important to be sure that there are no leaks in the system which could cause a false value of hydrogen uptake. It is well to maintain the system under a small positive pressure without shaking for about fifteen minutes and to note if there has been a change in pressure as with the micro apparatus. This becomes particularly important if the compound is not easily reduced. [Pg.231]

Most fuel cell systems have a CPU/controller board with options for remote hardline or wireless control by logic or computer interfaces. Other types are a little less exotic, but usually have some type of micro controller. Safety functions such as leak alarms and shutdown are included in most systems. [Pg.334]

Leaking Underground Storage Tank System Provides remedial action for controlling tank leaks Gespe Micro D. Marks/MIT 11... [Pg.18]

For gases or volatile liquids a very small quantity of sample is introduced with a micro-syringe to a kind of reservoir linked to the ionization chamber via a very narrow channel. Under the effect of a high vacuum that is maintained in the reservoir, the compound is sucked up and vaporized. This procedure is known as a molecular leak or molecular pumping. For continuous monitoring of gases and volatile compounds in the vapour state or dissolved in a liquid such as water, the sample can be diffused through a porous membrane. [Pg.391]

Another possible explanation of the low GORs in the Field is the imperfect seal over the reservoir. Shows of petroleum resembling the Snorre population have been found several hundreds of metres over the reservoir interval (Caillet 1993 Leith et al. 1993 Leith Fallick 1995), even though the field probably has never reached fracture pressure. It is clear that the poor cap rock quality on the relatively shallow and underfilled Snorre structure makes this a perfect candidate for a Type 3 trap as explicitly classified by Sales (1997), i.e. the GOR of the Snorre petroleum charge is determined more by the cap rock properties than by SR quality and its kinetic properties. The oil inferred by Leith et al. (1993) may have leaked from the reservoir as the cap rock section has very low pore entry pressures and micro fracturing is also observed in the cap rock section. One can therefore speculate that the leakage may be a prerequisite to maintain black oil in the Snorre Field. [Pg.153]

Hermeticity of composites is an important issue for first wall and blanket structure applications that require a pressure boundary and/or gas or fluid containment. It is widely considered to be a weakness of common SiC composites that they are not fully dense, for the matrix micro-cracks, existing more or less in the as-fabricated CVI, PIP or Ml SiC/SiC. That may easily cause unacceptable He leaks A hermetic seal coating likely will be required for such applications Exactly, it is both for hermeticity considerations and for corrosion protection of the fine-grained SiC fibers and of the fiber/matrix interphase material... [Pg.460]

Leak caused by manufacture defect occurred just after cold trap has been installed in the primary circuit. Sodium leaked through the micro crack in the weld on the nozzle of the trap as a result of sodium heating in the pipeline. The cause of the leak was improper control of welds after installation of the cold trap. Such leaks are revealed just after putting into operation of the failed element of the system. [Pg.112]

One leak in the BR-5/BR-10 reactor took place through the crack in the area of drain pipeline connection to the main pipeline. This was caused by insufficient self-compensation of pipeline thermal expansion. Sodium leak was within a few dozens of cm. No sodium release beyond thermal insulation occurred. Visual inspection revealed the crack in the body of the drain pipeline connection unit. The crack of -0.5 mm width spread to the half of pipeline diameter (40 mm). In the vicinity of through crack, on the inner surface of connection unit, there were micro cracks of up to 0.4 mm depth. The leak was caused by limited freedom of drain pipeline movement when the temperature in the main circuit changed. [Pg.112]

In 1979, tests were carried out in the micro-modular steam generator SG-1 to study sodium-water interaction processes in case of small (up to 0.2 g/s) and large (up to 0.25 kg/s) water leaks. The main results of tests ... [Pg.117]


See other pages where Micro-leaks is mentioned: [Pg.87]    [Pg.144]    [Pg.298]    [Pg.370]    [Pg.87]    [Pg.144]    [Pg.298]    [Pg.370]    [Pg.468]    [Pg.478]    [Pg.489]    [Pg.147]    [Pg.96]    [Pg.59]    [Pg.437]    [Pg.555]    [Pg.252]    [Pg.105]    [Pg.1822]    [Pg.1842]    [Pg.1409]    [Pg.61]    [Pg.329]    [Pg.316]    [Pg.59]    [Pg.134]    [Pg.1821]    [Pg.623]    [Pg.311]    [Pg.102]    [Pg.259]    [Pg.85]    [Pg.97]    [Pg.97]   
See also in sourсe #XX -- [ Pg.191 ]




SEARCH



Leaks

© 2026 chempedia.info