Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Setup time

Digital Field Communications An increasing number of valve-mounted devices are available that support digital communications in addition to, or in place of, the traditional 4—20 mA current signal. These control-valve devices have increased functionality, resulting in reduced setup time, improved control, combined functionality of traditionally separate devices, and control-valve diagnostic capabihty. Digital communications also allow the control system to become completely distributed where, for example, the process PID controller could reside in the valve positioner or in the process transmitter. [Pg.786]

Well cementing materials vary from basic Portland cement used in civil engineering construction of all types, to highly sophisticated special-purpose resin-based or latex cements. The purpose of all of these cementing materials is to provide the well driller with a fluid state slurry of cement, water and additives that can be pumped to specific locations within the well. Once the slurry has reached its intended location in the well and a setup time has elapsed, the slurry material can become a nearly impermeable, durable solid material capable of bonding to rock and steel casing. [Pg.1177]

The automatic functions provided by most of the new systems have greatly reduced the time and manpower required to monitor critical plant equipment. These functions have virtually eliminated both the human errors and the setup time normally associated with older vibrationmonitoring techniques. [Pg.699]

If Mark-Houwink coefficients were supplied at setup time, the chromatogram may be converted into the differential molecular weight distribution of the specimen. Various averages characterizing this molecular weight distribution are then calculated. The molecular weight distribution may be written to a file. [Pg.26]

Quants may have setup time and costs, depending on for example resources or preceding quants. [Pg.61]

One option to deal with the situation is to neglect setup times and setup carryover. This results in a situation, in which the available capacity is overestimated. On the other hand, if setup times are modeled, but setup carry-overs are not in the scope of the model formulation, the available capacity would be underestimated. Both results are not satisfactory in the first situation plans will result which are too optimistic and not feasible, whereas in the second situation in which capacity estimation is too conservative, resources will be underutilized. Consequently, only a model formulation which takes setup times and setup carry-overs into account captures the characteristics of the real world adequately and provides a realistic capacity allocation. [Pg.243]

The main objective of the PP/DS optimizer run in the scenario at hand is to minimize setup times and costs on campaign and noncampaign resources without incurring too much delay against the order due dates. For some resource groups, mode costs are also used to ensure that priority is given to the best (i.e., fastest, cheapest, etc.) resources. [Pg.251]

Porkka, P., Vepsalainen, A.P.J. and Kuula, M. (2003) Multiperiod production planning carrying over setup time. Int. f. Product. Res., 41, 1133-1148. [Pg.260]

Bisulfite treatment kits have been developed and are commercially available (e.g., Qiagen bisulfite treatment kit). Kits work with the same efficacy and have helped streamline the procedure, which will help expedite the process because of the elimination of setup time. Beginners are encouraged to use a kit, especially when there is not enough DNA to calibrate the conditions for bisulfite treatment. [Pg.198]

Benjaafar S, Gupta D (1999) Workload allocation in multi-product, multifacility production systems with setup times. HE Transactions 31 339-352... [Pg.211]

The Moldflow Plastics Xpert (MPX ) process automation and control system decreases mold setup time, cycle time, and scrap, and improves molded part quality and labor productivity. Unlike traditional trial-and-error methods, MPX tools provide a consistent and systematic method for improving and optimizing the molding process. [Pg.178]

These companies require tools that are intuitive, systematic, document-able, and globally supported to remain competitive on a global scale. Moldflow s Manufacturing Solutions products directly address these needs. The Plastics Xpert system applies and automates the process of scientific molding to decrease mold setup time, cycle time, and scrap,... [Pg.183]

Any machine with virtual memory suffers performance degradation when page swaps are too frequent. Some pipelined machines like the TI-ASC (3) or the CDC Star-100 (4) have rather long setup times for their arithmetic pipes. Multiprocessor machines like the Illiac IV (5) are next to useless if the programmer pays no attention to the architecture. These features all directly impact the user they have not been effectively hidden by software at any level. Improvement of this situation could result if compilers took on the burden of optimizing code so as to promote efficient hardware utilization. [Pg.238]

Ceramics Minimizes setup time, eliminates requirement for inventory... [Pg.5]

The advantages of the Ventana 320 are several. Because it uses elevated incubation temperatures and its reagents are designed for maximal performance at that temperature, the Ventana 320 has a total run time of 121 min allowing for 4 runs/8-h d, resulting in 160 slides/d. It requires very little setup time because all reagents are supplied in prepackaged... [Pg.402]

Mobile mills range in size and eomplexity from a single operator ehainsaw mill to a large hydraulically controlled trailer mounted bandsaw. The mobility and setup time varies with the size and eomplexity of the system. An outline of the produetion eapacities, weaknesses and strengths is deseribed in Table 7.1. [Pg.216]

Compression molding usually requires a large initial investment and produces semistructural parts. The simplicity of the process minimizes part setup time, reduces secondary finishing, and allows high-volume production with a low scrap rate. [Pg.2316]

Develop design parameters for the system including natural gas, water and product specifications and pressures as well as setting goals for the mechanical details such as system footprint, shipping parameters and system setup time. [Pg.102]

A make-to-demand manufacturer makes fixed products with fixed processes but sets up and initiates those processes only when there are sufficient orders (i.e., known demand) in the system. This scenario may occur when there is a large catalog of fixed products with variable demand or when the catalog offers a few products with several options. The distinguishing factor is that orders are batched and the facility is set up for a run of a specific product or option suite. The planning problem for make-to-demand involves complex trade-offs among customer satisfaction, product volumes, materials inventories, and facility setup times. [Pg.330]


See other pages where Setup time is mentioned: [Pg.574]    [Pg.26]    [Pg.129]    [Pg.693]    [Pg.75]    [Pg.243]    [Pg.243]    [Pg.251]    [Pg.390]    [Pg.395]    [Pg.456]    [Pg.465]    [Pg.159]    [Pg.287]    [Pg.70]    [Pg.34]    [Pg.178]    [Pg.179]    [Pg.180]    [Pg.415]    [Pg.70]    [Pg.471]    [Pg.435]    [Pg.945]    [Pg.28]    [Pg.950]    [Pg.496]    [Pg.499]    [Pg.502]    [Pg.502]   
See also in sourсe #XX -- [ Pg.443 ]

See also in sourсe #XX -- [ Pg.49 ]




SEARCH



Setup

© 2024 chempedia.info