Scheduling integration

Shankar, R., Z-Scheduler Integrating Theories of Scheduling Behavior into a Computational Model, in Proceedings of the IEEE International Confererute on Systems, Man, and Cybernetics, pp. 1219-1223. [Pg.2444]

Li, Z., lerapetritou, M. (2010). Production planning and scheduling integration through augmented lagrangian optimization. Computers and Chemical Engineering, 34(6), 996—1(X)6. [Pg.299]

J. F. Faccenda and T. E. Baker, "An Integrated AI/OR Approach to Blocked Operations Scheduling," paper presented at the NPRM Computer... [Pg.541]

To measure a residence-time distribution, a pulse of tagged feed is inserted into a continuous mill and the effluent is sampled on a schedule. If it is a dry miU, a soluble tracer such as salt or dye may be used and the samples analyzed conductimetricaUy or colorimetricaUy. If it is a wet mill, the tracer must be a solid of similar density to the ore. Materials hke copper concentrate, chrome brick, or barites have been used as tracers and analyzed by X-ray fluorescence. To plot results in log-normal coordinates, the concentration data must first be normalized from the form of Fig. 20-15 to the form of cumulative percent discharged, as in Fig. 20-16. For this, one must either know the total amount of pulse fed or determine it by a simple numerical integration... [Pg.1837]

Implement scheduled nondestructive testing at key points to monitor corrosion as part of a mechanical integrity program... [Pg.62]

COPE has 9 modules PM scheduler, corrective maintenance, equipment history, equipment reference listing, spare parts entry, database integrity verification, and training. [Pg.289]

Equipment used to process, store, or handle highly hazardous chemicals must be designed constructed, installed and maintained to minimize the risk of release. A systematic, scheduled, test and maintenance program is preferred over "breakdown" maintenance " that could compromise safety. Elements of a mechanical integrity program include 1) identification and categorization of equipment and instrumentation, 2) documentation of manufacturer data on mean time to failure, 3 ) test and inspection frequencies, 4) maintenance procedures, 5) training of maintenance personnel, 6) test criteria, and 7) documentation of test and inspection results. [Pg.72]

In order to keep the system up-to-date with the needs of the business you will need to review the system when changes occur in the business. This review may be carried out at the same time as the management reviews described in Part 2 Chapter 1 however, as these reviews may be scheduled on a periodic basis, you should not allow the system to become outdated. The system should always reflect what you do and should remain ahead of actual practice rather than lag behind it. You should therefore integrate your system review with the business review so that changes in the business are implemented through the quality system rather than as an afterthought. [Pg.171]

API RP 14E recommends that no reinforcement be used and presents a typical branch connection schedule (Table 15-6) to provide more mechanical strength than is required by ANSI B31.3. Most onshore operators use integrally reinforced branch-connection fittings or tees inter-changcalil, . [Pg.451]

CCPS has developed guidelines for the measurement of PSM performance that provide useful ideas on measurement. Their approach for developing performance measures integrates Quality Management with a well-tested methodology for developing measures based on mathematical algorithms derived from expert assessment of system performance. The purpose was to identify well-defined, measurable, and practical indicators of performance that are updated on a schedule which makes the performance measure continuously useful. To date, measures have been developed for... [Pg.111]

The team should be realistic about the time required to see improvements in end-of-pipe measures in most cases the pilot project success will be measured on efficiency improvements and other in-process measures alone. In this case it is important to demonstrate that all PSM and ESH issues are being managed. You should consider having a management systems audit (validation) conducted by a group independent of the integration project team. This may be done in conjunction with the next scheduled audit. This may be a corporate or divisional audit function or a consultant engaged specifically for this task. [Pg.113]

There are numerous other CCPS publications that may be helpful in your integration effort. In particular, the selection of measures to monitor the effectiveness of your integration effort and identify continuous improvement opportunities can be enhanced through the use of the results of a CCPS research and development effort to develop performance measures for CCPS s 12 process safety elements. These results will be described in the CCPS Guidelines for Developing Performance Measures for Continuous Improvement of Process Safety Management (scheduled for publication in... [Pg.160]

A planned purchasing schedule in dollars graphically integrated with time. [Pg.823]

The minimum number of postulates of the model of a desorption process with no explicit analytical expression of the heating schedule are required if the primary output data are treated according to Eqs. (10) and (12), viz. by numerical or graphical derivations and integrations of the recorded pressure data. After an adaptation of the analyzer, these operations can be performed by means of electrical circuits. The known temperature-time relationship (either in the form of an analytical function or established... [Pg.372]

Lasdon, L., and Baker, T., The integration of planning, scheduling and process control. In Chemical Process Control, CPC-III. (Morari, M. and McAvoy, T. J., eds.). CACHE-Elsevier, New York, 1986. [Pg.154]

Multiscale modeling of process operations. The description of process variables at different scales of abstraction implies that one could create models at several scales of time in such a way that these models communicate with each other and thus are inherently consistent with each other. The development of multiscale models is extremely important and constitutes the pivotal issue that must be resolved before the long-sought integration of operational tasks (e.g., planning, scheduling, control) can be placed on a firm foundation. [Pg.267]

S.P. Sanoff, D. Poilevey, Integrated information processing for production scheduling and control. Comput. Integr. Manuf., 4 (1991) 164—175. [Pg.626]

Schilling, G., Pantehdes, C.C., 1996. A simple continuous-time process scheduling formulation and a novel solution algorithm. Comput. Chem. Eng., 20(Suppl.) S1221-1226 Umeda, T., Harada, T., Shiroko, K., 1979. A thermodynamic approach to the synthesis of heat integration systems in chemical processes. Comput. Chem. Eng., 3 273-282 Wang, Y.P., Smith, R., 1994. Wastewater minimization. Chem. Eng. Sci., 49(7) 981-1002... [Pg.13]

A mathematical formulation based on uneven discretization of the time horizon for the reduction of freshwater utilization and wastewater production in batch processes has been developed. The formulation, which is founded on the exploitation of water reuse and recycle opportunities within one or more processes with a common single contaminant, is applicable to both multipurpose and multiproduct batch facilities. The main advantages of the formulation are its ability to capture the essence of time with relative exactness, adaptability to various performance indices (objective functions) and its structure that renders it solvable within a reasonable CPU time. Capturing the essence of time sets this formulation apart from most published methods in the field of batch process integration. The latter are based on the assumption that scheduling of the entire process is known a priori, thereby specifying the start and/or end times for the operations of interest. This assumption is not necessary in the model presented in this chapter, since water reuse/recycle opportunities can be explored within a broader scheduling framework. In this instance, only duration rather start/end time is necessary. Moreover, the removal of this assumption allows problem analysis to be performed over an unlimited time horizon. The specification of start and end times invariably sets limitations on the time horizon over which water reuse/recycle opportunities can be explored. In the four scenarios explored in... [Pg.97]


See other pages where Scheduling integration is mentioned: [Pg.1928]    [Pg.1928]    [Pg.45]    [Pg.442]    [Pg.362]    [Pg.235]    [Pg.61]    [Pg.6]    [Pg.597]    [Pg.212]    [Pg.155]    [Pg.144]    [Pg.878]    [Pg.366]    [Pg.377]    [Pg.387]    [Pg.85]    [Pg.30]    [Pg.20]    [Pg.267]    [Pg.328]    [Pg.597]    [Pg.55]    [Pg.87]    [Pg.472]    [Pg.39]    [Pg.195]    [Pg.204]    [Pg.51]    [Pg.45]    [Pg.14]    [Pg.119]    [Pg.220]   
See also in sourсe #XX -- [ Pg.225 ]