Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Procurement data

This test on rigid plastics indicates their ability to withstand continuous short-term compression without yielding and loosening when fastened as in insulators or other assemblies by bolts, rivets, etc. It does not indicate the creep resistance of a particular plastic for long periods of time. It is also a measure of rigidity at service temperatures and can be used as identification for procurement. Data should indicate stress level and the temperature of the test. [Pg.316]

Use of Results. Sales analysis data are used ia many ways by company management. The results are most useful ia production planning, particularly if grade differences appear to be ia the offing, and ia assuting that adequate suppHes are available for sales. Inventory control, raw material procurement, technical service requirements, and trends ia accounts receivable are beneficiaries of good sales analyses. [Pg.534]

Data Collection and Analysis Pertinent to the PA s Development of Guidelines for Procurement of Highway Construction Products Containing Recovered Materials, EPA Contract 68-01-6014, Draft, Vol. 1, Issues and Technical Summary, Franklin Associates, Ltd., and Valley Forge Laboratory, Inc., July 6, 1981. [Pg.21]

The ADA maintains a Hst of certified dental materials and devices based upon the certification by the maker that the item complies with ADA specification and that the testing for specification compliance of the item is procured in Association laboratories. The ADA also maintains a Hst of classified dental materials and devices which prove to be acceptable or provisionally acceptable to the Association based upon data submitted by the apphcant and data available in the Hterature. [Pg.471]

The price of air-cooled exchangers should be obtained from vendors if possible. If not, then by coirelating in-house historical data on a basis of /ft of bare surface vs. total bare surface. Correction factors for materials of construction. pressure, numbers of tube rows, and tube length must be used. Literature data on air coolers is available (Reference 15). but it should be the last resort. In any event, at least one air-cooled heat exchanger in each project should be priced by a vendor to calibrate the historical data to reflect the supply and demand situation at the expected time of procurement. [Pg.233]

With the Industrial Revolution, life became more complex but it was not until World War II that reliability engineering was needed to keep the complex airplanes, tanks, vehicles and ships operating. Of particular concern was the reliability of radar. Prior to this time equipment was known qualitatively to be reliable or unreliable. To quantify reliability requires collecting statistics on part failures in order to calculate the mean time to failure and the mean time to repair. Since then, NASA and the military has included reliability specifications in procurements thereby sustaining the collection and evaluation of data build statistical accuracy although it adds to the cost. [Pg.151]

As reviewed in the interest of sound design-procedure, the necessary creep information should be procured on the prospective material, under the conditions of product usage. In addition to the creep data, a stress-strain diagram, also at the conditions of product usage, should be obtained. The combined information will provide the basis for calculating the predictability of material performance in the designed product. [Pg.79]

The technical help rendered by my husband Dr Reddy Sastry Cherukuri in preparing the tables and collecting the scientific data and by my daughter Dr Anu Cherukuri who helped me in procuring the references from the National Library is greatly acknowledged. [Pg.370]

At present, the trend is moving from the analysis of individual production and logistics systems towards the optimization of entire production networks, that is, the optimization of the distribution to different production locations taking account of the procurement and distribution chain as indicated by the remarks on supply chain simulation earlier in this chapter. However, in particular for these applications there are some challenges in the basic work of providing consistent and coherent data describing the processes at different sites which most likely are located in different countries. [Pg.35]

Procurement Fabrication Construction vendor and fabrication documents inspection reports field change documents vendor data on equipment as built data What-If, Checklist... [Pg.30]

Input data are the starting material costs cv and product values cl v for all product-location combinations / ,/ e Ivcl in the starting period tx e T. These initial values are given in the location-specific currency. In addition, the latest procurement contract offer prices for c u / p,l e IB2, teTare used as raw material value basis across all periods. All other values are determined in the calculation as illustrated in fig. 58. [Pg.154]

Procurement Index Sets, Control and Input Data... [Pg.204]

The company decides spot procurement quantities xBsIt, the sum of contract and spot procurements forms the total procurement total quantity xBlt V / ,/ e IB1. Applying the offer cost rates leads to total procurement costs vBlt in the location currency V / ,/ e IB2. Procurement input and control data are illustrated in fig. 72. [Pg.204]

Input data like demand, procurement offers, starting inventories and shipments as well as production capacities gathered in the first half of the planning process are entered or uploaded automatically into the database. [Pg.209]

Basis plan evaluation presents the optimization results of the provided test data the value plan and the sales, distribution, production and procurement... [Pg.215]

Solution times are sufficiently fast to be applied in tactical planning where no real time response times are required. Secondly, value results are presented. All value results are indexed focusing on comparing results and to ensure confidentiality of industry data. Initially, the value plan with total profits and single values in sales, distribution, production and procurement is analyzed. [Pg.216]

This model extension is tested with ILOG OPL Studio 3.71 using ILOG CPLEX 9.1 and examined industry case test data on an Intel Pentium 4 Processor with 1,598 Mhz and 256 MB RAM. The extension is tested for an excerpt of the value chain network including nine sales locations, one procurement location and one production and having one multi-purpose and one continuous production resource as shown in fig. 101. [Pg.247]

In Canada, InterGroup Consulting Economists (O estimated wood procurement costs in 62 forest zones across the country and generated cost data for the 20 zones having sufficient surplus roundwood to sustain a minimum 18,000 tonne per year methanol plant operation, based on a biomass recovery of 30%. The procurement costs shown in Table II represent the delivered chip cost, as in the Battelle study, but include capital and operating costs on an undiscounted cost basis. Unlike the Battelle study, the estimate is based on oven dry wood. The final results are very similar. [Pg.135]


See other pages where Procurement data is mentioned: [Pg.692]    [Pg.1107]    [Pg.20]    [Pg.692]    [Pg.1107]    [Pg.20]    [Pg.199]    [Pg.454]    [Pg.255]    [Pg.43]    [Pg.210]    [Pg.1056]    [Pg.63]    [Pg.410]    [Pg.432]    [Pg.315]    [Pg.108]    [Pg.254]    [Pg.335]    [Pg.283]    [Pg.515]    [Pg.415]    [Pg.415]    [Pg.417]    [Pg.112]    [Pg.8]    [Pg.26]    [Pg.26]    [Pg.26]    [Pg.28]    [Pg.59]    [Pg.206]    [Pg.143]   
See also in sourсe #XX -- [ Pg.2 , Pg.3 , Pg.4 , Pg.5 , Pg.6 , Pg.7 , Pg.8 , Pg.9 , Pg.10 , Pg.11 , Pg.12 , Pg.13 , Pg.14 , Pg.15 , Pg.16 , Pg.17 , Pg.18 , Pg.19 ]




SEARCH



Procurement

© 2024 chempedia.info