Operational readiness

Test reviews to be held before tests commence to ensure that the product, facilities, tools, documentation, and personnel are in a state of operational readiness for verification... [Pg.267]

The aforementioned reviews and assessments were assimilated to characterize the effect of dielectric, rotational, and mechanical hazards on motor performance and operational readiness. Functional indicators were identified that can be monitored to assess motor component deterioration caused by aging or other accidental stressors. The study also includes a preliminary discussion of current standards and guides, maintenance programs, and research activities pertaining to nuclear power plant safety-related electric motors. Included are motor manufacturer recommendations, responses from repair facilities to a questionnaire, in-service inspection data, expert knowledge, USNRC-IE audit reports, and standards and guides published by the Institute of Electrical and Electronics Engineers (IEEE). [Pg.98]

The pretrial bum phase of the permit allows the incinerator to achieve a state of operational readiness necessary to conduct the trial burn. The pretrial bum permit conditions are effective for the... [Pg.963]

The trial burn can be seen as the test drive of the incinerator. It is the time when the owner/ operator will bring the unit up to operational readiness, monitor the key operating conditions, and measure the emissions. The trial burn test conditions are based on the operating conditions proposed by the permit applicant in the trial bum plan submitted to U.S. EPA for evaluation. U.S. EPA establishes conditions in the permit necessary to conduct an effective trial bum, meaning that the burn will be representational of the incinerator s intended day-to-day operation and will yield meaningful data for analysis. [Pg.964]

The pretrial burn phase of the permit allows the BIF to achieve the state of operational readiness necessary to conduct the trial burn. The pretrial burn permit conditions are effective for the minimum time (not to exceed 720 h) required to bring the BIF to a point of operational readiness to conduct a trial bum. This phase is often referred to as the shakedown period. [Pg.974]

A prediction of useful life for solid propellant rockets is quite important, from the standpoint of operational readiness and economic considerations. The premature removal and replacement of deployed systems, based on inaccurate storage life estimates, can be costly. A specific missile system and propellant combination could become obsolete while long term storage data are being compiled. Accelerated aging tests are normally used to give qualitative indications of storability, but the deficiencies of these tests are obvious and are discussed later. [Pg.239]

A shakedown period is the time during which an incinerator is brought to a state of operational readiness necessary to conduct a trial burn. The shakedown period is initially limited to 720 hours of operating time if needed, an additional 720 hours can be requested. [Pg.43]

Kiebler, P.A. (1999). A survey to determine the operational readiness of the certified registered nurse anesthetist. Retrieved March 27, 2007 from http //www.lrc.usuhs.mil/dissertations/ pdf/kieblerl999.pdf... [Pg.567]

OPERATIONAL READINESS Conduct Appropriate Readiness Reviews as Needed Make Startup Decisions Based upon Readiness Results Follow Through on Decisions, Actions, and Use of Readiness Results Maintain a Dependable Practice... [Pg.178]

The committee found that, with some notable exceptions as discussed later in this chapter, these assessments appear to be accurate. In fact, the information gathered in the course of this study suggests that the Navy is not as prepared as it should and could be in terms of its readiness posture for defense against chemical or biological attack. The Marine Corps is significantly better prepared than the Navy in terms of operational readiness, but its emphasis has been on dealing with... [Pg.36]

Logistics. The committee observes that the supply chain provides a delivery mechanism for surreptitious chemical or biological attack. Our nation s recent experience with anthrax delivered through the U.S. mail system provides a relevant illustration of the disruption and psychological response that such an attack can cause. Food and water supplies offer similar delivery opportunities. Attacks by such means should be considered within the context of an overall risk assessment, since they could significantly degrade operational readiness. [Pg.48]

The standard operational readiness reporting system is largely silent on chemical and biological warfare defense readiness reporting. It is recommended that the Chief of Naval Operations include CW and BW defense readiness reporting in the Status of Resources and Training System (SORTS) for the operating forces and in an appropriate parallel system for the shore establishment. The... [Pg.59]

As noted in Chapter 3, the Navy should prioritize the acquisition and distribution of additional protective garments and masks to the fleet, bases, installations, and port facilities to enhance operational readiness against the mounting specter of asymmetric chemical or biological attacks. [Pg.88]

In parallel with the recommendations of Chapter 3 in this report for achieving operational readiness, the Navy should establish a training and exercise program and an accompanying reporting system in order to achieve chemical and biological medical defense readiness. [Pg.112]

November 14-16, 2001, in Norfolk, Virginia (plenary session). Site visit to Naval Amphibious Base, Little Creek, Virginia, U.S. Navy Atlantic Fleet Command, Headquarters, Marine Forces Atlantic, and U.S. Joint Forces Command to discuss operational readiness issues—fleet, bases, ports, Marine Corps warfighting—and joint doctrine training, tactics, and procedure development. [Pg.206]

It is conceivable that Churchill s instruction was the result of a private approach from Dill at any rate, the anti-gas lobby were immediately swept aside. Within a week, Britain had scraped together her meagre stocks of gas and had them loaded into aircraft spray tanks and bombs at more than twelve RAF bases from Scotland to the South Coast all were operationally ready to mount a chemical attack by the end of the first week of July.10... [Pg.216]

Operational readiness is defined as the probability that a system either is operating or can operate satisfactorily when the system is used under stated conditions. Operational readiness deals with all the time elements, including storage time, free time, operating time, and downtime. [Pg.1924]

Kececioglu, D. (1995), Maintainability, Availability and Operational Readiness Handbook, Prentice HaU, Englewood Cliffs, NJ. [Pg.1955]

Operational readiness, 1924 Operational status, 334 Operations analysis, 740 Operations audits, 1544-1547 Operations estimating, 2311-2314 Operations improvement, 18-22 business processes, 18-20 ISE s role in, 6 measurement systems, 20-22 performance measurement, 21-22 Operations planning, 327-329, 2125 Operations sheet, 2312, 2313 Operations work, 1253 Operator(s) ... [Pg.2759]

There is one other component of the system. To ensure operational readiness, the FMIS contains an interceptor simulator that periodically is used to mimic the flight computer in order to detect a failure in the system. [Pg.217]

An in-service test program will be developed that includes preservice (baseline) testing and a periodic inservice test program to insure that all "safety-related" valves will be in a state of operational readiness to perform their principal radionuclide control function throughout the life of the plant. The test program will be based on the ASME Boiler and Pressure Vessel Code, Section XI, Division 2, Subsection IGV (primarily IGV-1000). [Pg.213]

Some of the elements in Table 1.4, such as Management of Change, are identical to those in Table 1.3. Others are modified—e.g.. Prestartup Safety Review becomes Operational Readiness. But some of the elements in Table 1.4, such as Measurements and Metrics, are completely new. One of the topics in the original OSHA list— Trade Secrets— has been removed. [Pg.15]

It is an unusual project that does not run into scheduling and/or budget problems. Such problems inevitably create pressure to take shortcuts or to eliminate some equipment items so as to get the project back on schedule thereby increasing the chance of a PSM shortcut. The MOC and Operational Readiness programs should help ensiue that such actions do not create an unacceptable safety problem. [Pg.149]

Operational Readiness Emergency Management Technical Information... [Pg.286]


See other pages where Operational readiness is mentioned: [Pg.897]    [Pg.21]    [Pg.897]    [Pg.964]    [Pg.110]    [Pg.9]    [Pg.197]    [Pg.897]    [Pg.52]    [Pg.46]    [Pg.187]    [Pg.57]    [Pg.110]    [Pg.112]    [Pg.121]    [Pg.316]    [Pg.897]    [Pg.120]    [Pg.897]    [Pg.90]    [Pg.1949]    [Pg.7]    [Pg.16]    [Pg.288]   
See also in sourсe #XX -- [ Pg.390 , Pg.712 , Pg.713 ]