Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Control Risk Assessment

Controlled risk assessment (1) Barriers are considered adequate with a controlled RAC of IE assigned. [Pg.109]

Controlled risk assessment (2) Barriers considered adequate. Addition of security surveillance around the hospital grounds area would further reduce the probability of risk exposure. A controlled RAC of IE is assigned. [Pg.111]

Controlled risk assessment (3) Design per applicable ASME codes have reduced the likelihood of such a risk to improbable and, if component failure were to occur, the shatterproof gauges and rated valves would decrease the hazard category to marginal. A controlled RAC of3E is therefore assigned. [Pg.111]

Controlled risk assessment (4) Barriers adequate, isolation by distance acceptable, and insulated control panels further reduce risk of exposure to hazardous noise levels. A controlled RAC of 3E is assigned because, even if a relief did occur, the distance and isolation would create a marginal, rather than critical, risk. [Pg.111]

Controlled risk assessment. (5) Barriers and controls considered adequate. The addition of a dye-penetrant analysis of aU field joints would further reduce the possibility of hazard risk exposure. Enforced no smoking policies around oxygen panels by the hospital staff and the patients will also decrease the risk potential. A controlled RAC of2E is assigned. [Pg.112]

Creating a multidisciplinary team to conduct infection control risk assessment (ICRA)... [Pg.189]

In this book, two concepts of system safety engineering and risk assessment are combined. System safety engineering is considered a working part of the risk assessment process. Engineers must use system safety engineering analyses to truly understand what causes hazards and how they should be controlled. Risk assessment takes that information and helps the engineer weigh the options and decide which is the most cost-effective. [Pg.4]

Integrity of SRP/CS and safety function is expressed in terms of performance levels (PLs). Control risk assessment is used to determine the required PL (PLr) using a risk graph see Figure 9.5. [Pg.171]

China s construction industry has been criticized of producing works of poor quality, delay and cost overrun with low efficiency and effectiveness (Chan Chan, 2002 Chen, 1998). This has been an ongoing concern (Ding, Smith, Yan, 2007). Construction quality control, risk assessment and the delegation of responsibilities are essential issues. [Pg.812]

Table 4. Risk Assessment of Flow Control System ... Table 4. Risk Assessment of Flow Control System ...
DATTA-BARUA Natural Gas Measurement and Control DEAN Lange s Handbook of Chemistry, Fourteenth Edition DESHOTELS, ZIMMERMAN Cost-Effective Risk Assessment for Process Design... [Pg.3]

The detection and analysis, including quantification, of cyanobacterial toxins are essential for monitoring their occurrence in natural and controlled waters used for agricultural purposes, potable supplies, recreation and aquaculture. Risk assessment of the cyanobacterial toxins for the protection of human and animal health, and fundamental research, are also dependent on efficient methods of detection and analysis. In this article we discuss the methods developed and used to detect and analyse cyanobacterial toxins in bloom and scum material, water and animal/clinical specimens, and the progress being made in the risk assessment of the toxins. [Pg.111]

The final article, by S. G. Bell and G. A. Codd of the University of Dundee Department of Biological Services, is concerned with detection, analysis, and risk assessment of cyanobacterial toxins. These can be responsible for animal, fish, and bird deaths and for ill-health in humans. The occurrence of toxic cyanobacterial blooms and scums on nutrient-rich waters is a world-wide phenomenon and cases are cited from Australia, the USA, and China, as well as throughout Europe. The causes, indentification and assessment of risk, and establishment of criteria for controlling risk are discussed. [Pg.132]

The systematic application of management policies, procedures, and practices to the tasks of analyzing, assessing, and controlling risk in order to protect employees, the general public, and the environment, as well as company assets, while avoiding business interruptions... [Pg.78]

Major hazard aspects of the transport of dangerous substances 1991 Recommendations for training users of non-agricultural pesticides Health surveillance under COSHH. Guidance for employers Anaesthetic agents. Controlling exposure under COSHH Risk assessments of notified new substances... [Pg.580]

Assists state and local air pollution control agencies and EPA regional offices with technical matters pertaining to health, exposure, and risk assessment of air pollutants. Services are also extended to the general public, small businesses and international agencies. Thursday 8 00 a.m. to 5 00p.m., EST Friday 8 00 a.m. to 4p.m., EST. [Pg.301]

Dodge, F. T., White, R. E., and Bankler, T. 1998. Risk Assessment of Liquid Seals in Marine Vapor Control Systems. Final Report, SWRl Project No. 04-8954, Southwest Research Institute, San Antonio, TX (June 1998). [Pg.194]

What arc the general duties of state, territorial, and local air pollution control agencies as they relate to health risk assessments ... [Pg.295]

Note The souree for the above risk values is Table III-7, Preliminary Caneer Poteuey Values for Uie Air Toxies Hot Spots aet, found in California Air Pollution Control Offieers Assoeiation, Air Toxics Hot Spots Program, Revised 1192 Risk Assessment Guidelines," page III-28, published Oetober 1993. [Pg.417]

Point to Consider People in tl>e community are often more concerned about such issues as trust, credibility, competence, control, voluntariness. fairness, caring, and compassion tlian about mortality statistics and tl>e details of quantitative risk assessment. [Pg.529]

See also Efficiency of Energy Use Electric Power, System Protection, Control, and Monitoring of Energy Economics Industry and Business, Productivity and Energy Efficiency in Risk Assessment and Management. [Pg.470]


See other pages where Control Risk Assessment is mentioned: [Pg.342]    [Pg.32]    [Pg.87]    [Pg.210]    [Pg.145]    [Pg.165]    [Pg.165]    [Pg.297]    [Pg.342]    [Pg.32]    [Pg.87]    [Pg.210]    [Pg.145]    [Pg.165]    [Pg.165]    [Pg.297]    [Pg.92]    [Pg.2209]    [Pg.82]    [Pg.55]    [Pg.111]    [Pg.417]    [Pg.595]    [Pg.399]    [Pg.138]    [Pg.58]    [Pg.288]    [Pg.1204]    [Pg.133]    [Pg.140]   
See also in sourсe #XX -- [ Pg.74 ]




SEARCH



Risk control

© 2024 chempedia.info