Attempting to modify structure or services to accommodate structural idiosyncrasies later is always problematic. Protection and isolation of existing facilities from the disruption of construction should be resolved early in the design. The reconciliation of building and production activities is never easy, but early planning for construction traffic, personnel, site screening, security, site access and site communications can minimize these adverse effects. [Pg.51]

Construction sites have frequently been a prime target for vandalism and theft. There are even cases of labor disorders ranging from incursion to assault. For these and other reasons (e.g.. public safety), the security of a construction site is a very important consideration. While usually not requiring Fort Knox-type protection, the Rittenhouse Square-type (wide open and unlimited access) is totally unacceptable. [Pg.192]

The (ay ) pattern is more complex. If the functionality span were limited to the site span (SS =2), half-reactions of s =3 would be omitted. To include these obliges acceptance of a functionality span of 4 and reactive strands for each site either to right or left. Hence the two reactive strands can be RL, RR, or RL with maximum FS =4 in three ways, but the fourth combination, LR, results in no overlap at all and is omitted. To encompass these variants the synthon strand cannot simply be labeled a,fi,y as before, but is labeled yifiiaiazfizyz over the six accessible carbons, four of which may be functionalized in three ways, with oi and 2 the first and second construction sites, respectively, as illustrated in Fig. 7. [Pg.78]

MNPHP is a well-known irreversible inhibitor of lipases that is highly specific for reaction with active-site serine residues. Thus, MNPHP was selected as the inhibitor to determine, by titration, the fraction of catalytic sites that are accessible and active. Since we are concerned with CALB activity in organic media, inhibition was studied in heptane. LC-MS was used to determine the release of p-nitrophenol (pNP) which corresponds with accessible active sites. To ensure that adsorption of pNP by resins was taken into consideration, pNP concentration was corrected as follows. A fixed quantity of enzyme-free resin was incubated overnight in acetonitrile with different concentrations of j NP. Standard curves of pNP adsorption by each resin as a function of pNP concentration were constructed from LC-MS measurements. MNPHP-inhibited immobilized enzymes were used for e-caprolactone ring-opening polymerizations in toluene (70 C). No conversion of monomer was observed in 30 minutes. Hence, MNPHP titration resulted in complete inhibition of CALB activity. [Pg.159]

SELECTION OF EQUIPMENT A detailed assessment will ensure that the appropriate equipment is chosen for a given work environment where certain risk exposures are assumed. As an example, plumbed equipment may be suitable for a pharmaceutical manufacturing facility, where large quantities of caustic materials are present. However, a remote construction site may not have access to a limitless supply of flushing fluid, making a self-contained, portable device ideal. Equipment... [Pg.28]

Provide coordination for vendor workforces if access to construction site is necessary for rough-in or for equipment placement... [Pg.1004]

If you are working at your company office with access to online computers, then technical information is only a fingertip or mouse click away. However, a construction site is a hostile environment for a laptop and so a hard copy of any data is preferable on-site. [Pg.257]

HSG 144 Safe use of vehicles on construction sites HSG 150 Health and safety in construction GS28 Safe erection of structures pt 3 Working places and access PM28 Working platforms on fork lift trucks BS 5973 Code of Practice for access and working scaffolds and special scaffold structures in steel... [Pg.211]

However, certain safety hazards arise because of lack of security for example, the high risk involved when employees are sent to collect wages or the potential risk to children and others when a factory or construction site is not physically secure iq terms of preventing unauthorised access. [Pg.150]

Outline eight precautions that should be considered to prevent accidents to children who might be tempted to gain access to a construction site. [Pg.111]

These Regulations were made to implement the European Directive on the minimum safety and health requirements for the workplace. A workplace for these purposes is defined very widely to include any part of non-domestic premises to which people have access while at work and any room, lobby, corridor, staircase or other means of access to or exit from them. The main exceptions to these rules are construction sites, means of transport, mines and quarries and other mineral extraction sites. [Pg.473]

Size of site to accommodate operation (D9 - discretionary). This criterion requires a demonstration that there will be sufficient area within the boimdaries of the nominated sites to allow secure operation of at least one new build nuclear power station. Atypical layout for the generic APIOOO plant is discussed elsewhere in Chapter 2 of this PCSR. With the exception of the parking area, the entire facility is contained within a perimeter fence that encloses approximately 10 hectares (ha). The site boimdaries for the SSA nominated sites enclose areas of between 75 ha and 298 ha (Reference 3.7). Allowing for ancillary facilities, the typical area estimated for the S SA nominated sites required for operational purposes is 3 0 to 50 ha. Hence, all of the nominated sites are sufficient area for at least one new build nuclear power station. The finalised layout will need to ensure that the constructed AP 1000 plant can be operated in a safe and secure marmer, with access to site (and nuclear materials) strictly controlled. The finalised layout will need to accommodate both generic and site specific requirements and meet with the approval of the regulators. [Pg.60]

Construction of access roads, site preparation, blanket drain, foundation for thickeners, pump stations, and starter dams for tailings... [Pg.593]

Prevent any electrical equipment, vehicles, bonfires or other sources of ignition near the cylinders > Prevent smoking when changing cylinders > Prevent people not involved with the storage or installation gaining access to it, particularly children (construction sites particularly)... [Pg.152]

The majority of issues relating to arson have been discussed previously within the chapter however, the instances of arson on construction sites are significant, particularly from unauthorised access, especially by children. [Pg.165]

Conditions on site can often be far from ideal, due to exposure to the elements (rain, wind, extremes of temperature), difficulty of access, the need to weld in unfavourable positions, etc. For this reason welding is carried out as much as possible in prefabrication shops to produce subassemblies thus minimizing site works. Should the prefabrication shop be on or near the construction site, the site team may be responsible for its supervision. Appendix E discusses prefabrication of structural steel elements. The quality concerns evoked therein apply in general to prefabrication of piping. Another area of prefabrication is that of pipe supports, which may constitute a wide variety of types and configurations. [Pg.180]

If your career in the electrical industry is to be a long, happy and safe one, you must always wear appropriate PPE such as footwear and head protection, and behave responsibly and sensibly in order to maintain a safe working environment. Before starting work, make a safety assessment what is going to be hazardous, will you require PPE, do you need any special access equipment Construction sites can be hazardous because of the temporary nature of the construction process. TTie surroundings and systems are always changing as the construction process moves to its completion date when everything is finally in place. [Pg.382]


See other pages where Construction sites access is mentioned: [Pg.45]    [Pg.54]    [Pg.6]    [Pg.82]    [Pg.189]    [Pg.230]    [Pg.155]    [Pg.1002]    [Pg.366]    [Pg.273]    [Pg.50]    [Pg.383]    [Pg.144]    [Pg.412]    [Pg.69]    [Pg.343]    [Pg.346]    [Pg.618]    [Pg.75]    [Pg.1246]    [Pg.52]    [Pg.36]    [Pg.80]    [Pg.244]    [Pg.146]    [Pg.47]    [Pg.75]    [Pg.384]   