Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

UPS operations

By far the best application of computers to evaporators is for working up operators data into the basic performance parameters such as heat-transfer coefficients, steam economy, and dilution. [Pg.1148]

There is all increased risk of variation each time a new set-up operation is required due to changes in the orientation of the part or tooling. [Pg.45]

There is one particular type of filler whose value can be in no doubt. This is the so-called thixotropic filler exemplified by certain fine silicas and silicates which appear to increase the viscosity of the resin on standing. These are useful in minimising drainage of resins from vertical and near-vertical surfaces during hand lay-up operations. [Pg.706]

The resins are also used for coating on to moulds to give a good finish that is to be used for polyester hand-lay up operations. [Pg.813]

Another serious problem in heat exchangers is corrosion. Severe corrosion can and does occur in tubing and very often with common fluids such as water. Proper material selection based on a full analysis of the operating fluids, velocities and temperatures is mandatory. Very often, heavier gauge tubing is specified to offset the effects of corrosion, but this is only a partial solution. This should be followed by proper start-up, operating and shut-down procedures. [Pg.30]

Instructions for start-up, operation and shutdown as well as those regarding prevention and suppression of failures, if any,... [Pg.308]

Does the SAHP eontain site eontrol proeedures that have been developed during the planning stages of a hazardous waste elean-up operation and modified as new information beeomes available [OSHA Referenee. 120(b)(4)(ii)(F),. 120(d)(2)]... [Pg.252]

FIGURE 4.5. Decision/Action Flow Diagram of a Furnace Start-Up Operation. [Pg.171]

This suggests that caution must be exercised when establishing a tray efficiency for any type contacting device by (1) using actual test data if available for some similar system or (2) comparing several methods of predicting efficiency, and (3) possible use of a more conservative efficiency than calculated to avoid the possibility of ending up with a complete column with too few actual trays—a disastrous situation if not discovered prior to start-up operations. [Pg.45]

Speed acceleration Load up Operation Load down Speed deceleration... [Pg.200]

Polyester polyurethanes are usually based on a blend of a quasi-prepolymer (polyester/MDl) and a diol/polyester suitable for spray-up operation. An alternative is to use a solvent-containing system using blocked curatives to give an extended pot-life of 2 to 3 hours enabling them to be brush, roller or spray applied. [Pg.941]

Pressure Deaerator Troubleshooting If pressure DA equipment is properly maintained and carefully set up, operators should be able to produce FW containing dissolved oxygen (DO) levels of less than 0.005 to 0.01 cubic centimeters per liter (cc/1) 02. [Pg.104]

In this section, instructions for start-up operations and descriptions of programs are given ... [Pg.344]

At AWE, the Lewis acid-catalyzed bulk polymerization route has been the main synthesis route to poly(m-carborane-siloxane) elastomers. Our selection has been based on considerations of safety, availability of key reagents, and ease of scale-up operations. An understanding of the physical and chemical properties of these materials, and how these properties can be modified through the synthesis process, is essential in order to develop materials of controlled characteristics. [Pg.105]

A solution of 30% aqueous hydrogen peroxide in trifluoroacetic acid is useful for destructive oxidation of the aromatic ring in preference to the side chains as is usual with most oxidants. During work-up operations, the excess peroxide must be catalytically decomposed with manganese dioxide before removal of solvent to prevent explosions. [Pg.1630]

This development has provided a safe, clean and efficient method for processing UP munitions (30% reduction in manpower requirements and a 90% reduction in air and water pollution). The system is an extremely accurate production filling method. This accuracy is very important in UP operations since any adjustment in munition volume is hazardous and inefficient. The line changeover from one munition to another is accomplished by two experienced men in one day. [Pg.169]

The clean-up fixture is part of the drip pan. The clean-up fixture and the drip pan are drained by gravity to the WP operating tank. The fixture is connected by a hose to a drain pipe that connects to the HP operating tank. The fixture is operated in the horizontal plane by a cushioned-stroke pneumatic cylinder for smooth operation. The fixture travel is two-position travel. The first travel or shorter distance is for drip pan function during normal operation and the greater or over travel is for clean-up operations. The clean-up fixture opening is such that the filling nozzle seats on the clean-up fixture as it would on a munition. [Pg.176]

Future plans for our UP operations include the replacement of two remaining UP dip-fill production lines with the more accurate, efficient, and safer volumetric filling method described in this paper. [Pg.182]

Personnel Choosing an appropriate technique sometimes comes down to having the right person on your staff to perform the technique. If you, or no one in the lab, had had experience with the hydroxyl value titration, it might not have been an option in the Bulging Drum Problem. Certainly, if the operator of your triple quadrupole mass spectrometer is on vacation and there is no back-up operator, another method, or sending the samples to another lab, may be necessary. Should the method need to be transferred to another lab, does that lab have the requisite people for the job ... [Pg.817]

The In Salah gas project took up operation in Algeria during summer 2004. There as well, a C02-rich natural gas is treated to reach commercial concentrations of C02. After separation in an amine plant, the C02 is stored in the gas-containing reservoir structure. Using the same structure for production and storage of course involves the risk of a breakthrough of C02 into the production wells. [Pg.181]

Almost all new systems have need of adjustment of flow balances, level switch adjustment, or injection rates. A normal system start-up operation should consist of daily monitoring until the system stabilizes at a relatively constant rate. At the end... [Pg.286]

In the 1990s, reaction calorimetry has found extensive use in industrial scale-up operations. The editor s limited exposure to it suggests that the commercially available equipment has indifferent agitation and may in consequence handle multiphase reactions poorly anathema though they be to academic kineticists, industry finds slurries attractive. However it is a simple technique by which to acquire data on the kinetics of heat production. Publications have become very numerous, mostly publicity from testing houses offering the service. Some very recent work is found in [6], [7],... [Pg.189]


See other pages where UPS operations is mentioned: [Pg.259]    [Pg.416]    [Pg.470]    [Pg.1010]    [Pg.1672]    [Pg.250]    [Pg.170]    [Pg.336]    [Pg.368]    [Pg.1]    [Pg.207]    [Pg.1]    [Pg.138]    [Pg.27]    [Pg.356]    [Pg.305]    [Pg.364]    [Pg.214]    [Pg.412]    [Pg.104]    [Pg.155]    [Pg.32]    [Pg.178]    [Pg.42]    [Pg.286]    [Pg.75]   
See also in sourсe #XX -- [ Pg.37 ]




SEARCH



Scale-Up of Upstream Operations

Scale-up and Operation

Scaling up Ionic Liquid Technology from Laboratory to Continuous Pilot Plant Operation

Scaling-up Fixed Bed Operations

Set-Up and Operation of Liquid Ring Vacuum Pumps

Start-up operations

Step 5 Set up the operations or tasks

Step-up operators

Up the Operations

Up-to-date standard operating procedures

Validate, start-up, operate and maintain the strategy

© 2024 chempedia.info