Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Program control requirements

This is the speed controller block that consists of both a PID (proportional integral derivative, a type of programming) controller and an acceleration compensator. The required speed reference signal is compared with the actual speed signal obtained from the motor model (section 2). The error signal is then fed to both the PID controller... [Pg.109]

Key documents that are developed during the planning stages can be used to focus and direct the compliance strategy, to outline the health and safety program/plan requirements, and to establish work controls. These documents are usually developed after contract award and before mobilization. [Pg.38]

F. All site control elements of the safety and health program must be fully implemented as described in the program. The purpose of site control requirements is to ensure that only properly trained and authorized individuals enter those areas of the site with potential hazards, and that, in the event of an emergency, rapid assistance can be rendered to employees working in the exclusion zone. This section discusses the findings of two components of site control the establishment and maintenance of site work zones and the establishment and implementation of appropriate confined space procedures. [Pg.197]

Silica control requirements are the same as for phosphate-cycle programs. [Pg.437]

The program must require the vendors to measure a number of reference samples and/or duplicates submitted in a planned sequence. It should require prompt measurement and reporting of these data and should maintain the results in a control chart format. Prompt feedback and follow-up of any apparent data discrepancies and reconciliation of the results with control charts maintained by the vendors are required to minimize the length of uncertain performance. The quality assurance plan should include random sampling of the vendors data for their validity and conformance with quality assurance requirements. If quality assurance is properly practiced at all levels, an inspection of 5 percent of the total data output should be adequate. [Pg.106]

With the abundance of wash process signals mentioned here it is fair to say that this information can only be evaluated effectively with a fully electronic program control. From the actual wash requirements and the information registered, an optimal process sequence is worked out and then set automatically, taking into account important parameters such as wash and spin speeds, program duration, water levels and number of rinses. [Pg.32]

A survey of glazing failures due to wind load indicates that improper installation of setting blocks, gaskets or lateral shims, or poor edge bite is a significant cause of failure because of the resultant unconservative support conditions. To prevent premature glass failure, a strenuous quality control program is required. [Pg.129]

Mirex is not currently registered for use in the United States so release of mirex to soil from pesticide applications is no longer of concern. However, use of mirex as a pesticide for fire ant control required the spraying of this chemical on soils of an estimated 132 million acres in the southern United States (IARC 1979c). An estimated 226,000 kg (498,000 lb) of mirex was used in 9 states from 1962-1976 as part of the fire ant eradication program conducted by the Department of Agriculture (IARC 1979c). [Pg.179]

TESTING (Physiological). Determination of (lie toxicity of a substance or product by administering it to laboratory animals in controlled dosages, by mouth, skin application, or injection. Materials commonly subjected lo such evaluation are plianuaceuheals, pesticides, and foods. Extensive testing programs are required before such products are approved for human use. [Pg.1603]

This is not to say that modern corrosion inhibitors are inferior to chromate, but in order to achieve corrosion rates today as low as is commonly available with chromate (<1.0 mpy), programs usually require close control, good technical service, and occasional innovative solutions to problems. [Pg.77]

Both programs would require the installation of some form of bleed control to limit the cycles of concentration and to remove sludges from the cooling system. The results are presented in Table 3.3. [Pg.83]

Effective results with phosphate programs typically require a cooling water pH of 6.0 to 7.0 or perhaps up to 7.5. The maintenance of lower pH ranges, in turn, demands good control and a high level of operator confidence. [Pg.142]

It is vital to know the correct system volume and to fully understand the biocide application program. Biocidal control is often the weakest area of any competitor s program. When putting together a new biocidal program, volume requirement calculations based on incorrect information can have a significant and detrimental effect on cost. [Pg.278]

In a DSC experiment the difference in energy input to a sample and a reference material is measured while the sample and reference are subjected to a controlled temperature program. DSC requires two cells equipped with thermocouples in addition to a programmable furnace, recorder, and gas controller. Automation is even more extensive than in TA due to the more complicated nature of the instrumentation and calculations. [Pg.17]

Computer systems that are identified as requiring validation must be included in the site validation master plan. A validation master plan is typically used as a high-level plan for the site or processes and systems that make up the facility GMP operations. The plan should outline the scope of the validation program, controls to be adopted, and how activities are to be conducted, documented, reviewed, approved, and reported. Target completion dates should be included for validation work in each area. [Pg.579]

There exists a highly developed technology for the automation and process control of different stages of continuous dyeing. It differs from the control of bath dyeing in that constant conditions must be maintained and no time program is required. [Pg.344]

Attempts at environmental or health protection can yield only dubious results, if any, if they are based on suspect data. Therefore, a rigid quality control program is required for speciation analysis. Species alterations have to be avoided or minimized information on the degree of possible species changes must therefore be elucidated.32 39... [Pg.435]

Preclinical development programs are required to establish modeling systems that adequately evaluate and/or detect potential risks associated with cellular differentiation, tissue growth, and organogenesis—all necessary components of a neo-organ regenerative process. Sufficient control studies are... [Pg.811]

Hardware requirements were similar for all the programs tested (IBM PC compatibility, 384-640 K of memory, a hard disk drive). Two programs, QSA/Plus and SAMPO 90, also required a maths co-processor. The QSA/Plus program had to be installed in Windows 3.0. All of the other programs operated directly from DOS. Except for GAMMA-W, all the programs control data acquisition. GAMMA-W, which is written by an independent company that does not manufacture nuclear instrumentation, does not allow the user to read ten different formats of y-ray spectra. The conclusions reached by the authors were as follows. [Pg.176]


See other pages where Program control requirements is mentioned: [Pg.67]    [Pg.402]    [Pg.402]    [Pg.7]    [Pg.360]    [Pg.456]    [Pg.473]    [Pg.119]    [Pg.180]    [Pg.300]    [Pg.380]    [Pg.180]    [Pg.88]    [Pg.378]    [Pg.35]    [Pg.83]    [Pg.324]    [Pg.244]    [Pg.786]    [Pg.318]    [Pg.23]    [Pg.92]    [Pg.95]    [Pg.547]    [Pg.734]    [Pg.242]    [Pg.144]    [Pg.61]    [Pg.776]    [Pg.1973]    [Pg.3924]   
See also in sourсe #XX -- [ Pg.353 , Pg.396 ]




SEARCH



Control requirements

Program controllers

© 2024 chempedia.info