When the wall of a cylindrical pressure vessel is subjected to a temperature gradient, every part expands depending on the coefficient of linear thermal expansion of the steel. The parts at lower temperature impede the expansion of those parts with higher temperature, and induce additional thermal stresses. To estimate the transient thermal stresses which regularly appear e.g. during start-up or shut-down of process components or as well as a result of process interruptions and in the case of pulsating temperature conditions during operation. Informations about the temperature distribution across the vessel wall as a function of radius and time [12]... [Pg.210]

For semi-batch reactions, it is wise to analyze a sample of the mixture present in the reactor before feed of the reactant is started. In fact, this mixture is often preheated to the process temperature before feeding, hence it is exposed to the process temperature and it could be useful to interrupt the process at this stage, in case of necessity. Such a thermogram assesses the thermal risks linked with such a process interruption (see case history at the beginning of this chapter). [Pg.300]

You have a pump that was designed to handle fresh, flowing froth at a process temperature of 80 °C, but there is a process interruption and the pump is halted for two days, during which time the whole circuit cools to the treatment plant s ambient temperature of about 20 °C. What will happen when you eventually try to restart the pump ... [Pg.156]

She of Action Antibiotic Process Interrupted Type of Activity... [Pg.300]

The risk assessment requires information about potential risks, effects, and impacts on current processes and environments. Process risk assessment is mainly determined by the probability of process interruption, system down times, and restart of a system. Typical chemical risk assessments comprise identification of hazards for personnel, customers, and environment, qualitative assessment of potential adverse consequences of the contaminant, and evidence of their significance. The previously described systems for toxicology estimation are useful software modules in this process. Environmental risks require additional dose-response assessments as well as quantification of exposure to determine the dose that individuals will receive. Einally, a qualitative assessment of the probability for recurrence of the exception is performed, or — in the case of systematic occurrence — the exception is linked to similar cases. [Pg.346]

Final elements must provide the desired capacity with the required precision of flow throttling over the desired range, usually 10% to 95% of maximum flow. The valve characteristic should provide a linear closed-loop gain, except choose linear or quick-opening characteristics for valves that are normally closed but must open quickly. Select the valve failure position for safety. The valve body should satisfy such requirements as required flow at 0% stem position, plugging, pressure drop, or flashing. The nonideal final element behavior, such as friction and deadband, should be small, as required by each application. Control valves should have manual bypass and block valves to allow temporary valve maintenance when short process interruptions are not acceptable. However, the bypass should never compromise safety interlock systems. [Pg.1352]

In spite of the use of high-quality steel grades for the segments and other machine parts, wear is considerable and, while, when compared with other methods, the total costs associated with this item are not excessive, the process interruptions, which can be only avoided if redundant stand-by equipment is installed, are not tolerable. In... [Pg.763]

In the absence of reliable data indicating a history of control for an aseptic manufacturing facility, it is good sense to list all those events that might have a deleterious effect on the provision of an aseptic environment (batch changes, shift changes, process interruptions, etc.). The environment should at first be... [Pg.234]

Addition of nitrate to the tobacco blend significantly reduced MSS yields of tar, PAHs, and phenols. The odd-electron compound NO generated during the smoking process interrupted the free radical mechanism of formation of PAHs [Hoffmann and Wynder (1797)]. The % tumor-bearing animals (%TBA) of the resulting CSC was also reduced by about 80%. On the basis of these results, nitrate addition or use of high-nitrate tobaccos was proposed. [Pg.1186]

An accident is the event and an injury is a consequence or end result of the event. The end result may have multiple consequences, such as property or equipment damage, process interruption, etc. The severity of the injury caused by an accidental event is difficult to predetermine or define. The luck factors referred to previously explain how the severity is sometimes determined by absolute fortune, either good or bad. [Pg.26]

After the contact and exchange of energy, luck again plays a role in determining the outcome of the contact. The outcome could be injury to people, damage to property, harm to the environment, process interruption, or a combination of these. We have no control over the outcome of the contact. Once the process is in motion, no control activity can determine the outcome, which could be minor injury, serious injury, negligible or severe damage to property, or even death. [Pg.34]

The V-mask can now be placed over the graph with P-0 parallel to the x-axis and the point P over the current data point. If any part of the cumulative function protrudes the boundaries prescribed by the V-mask, we would conclude that the current mean of the process has deviated from the target. The CUSUM chart, in general, is more effective than the Shewhart Control Chart when used to monitor continuous processes that tend to drift over time. The CUSUM Chart, however, is quite vulnerable to the impact of process interruptions. Another drawback of the CUSUM Chart is that its direct relationship to the actual time variation of the process is not always clear, making it rather difficult for us to analyze and to improve the process. Refer to Stepwise SPC Chart. [Pg.81]

It is good practice to ensure pasteurisers run steadily and process interruptions are as limited as possible. The correct sizing of equipment and buffer tanks can be used to help ensure this (European Brewery Convention, 1995). [Pg.267]

In the case of operational qualification (OQ) exercises like (1) determination of relationship between irradiation time and dose, (2) measurement of dose distribution in reference material, (3) measurement of effects of process interruption, and (4) measurement of beam characteristics have to be performed. [Pg.2289]

This effect also can be seen when applying reinforcement fibers which are not orientated in process direction. Thus, wound or braided fibers in any fiber orientation between 0° and 90° should be covered by unidirectional fibers in process direction. Otherwise, the fibers will be warped during the process, which reduces the product s quality and furthermore can lead to process interruption. The processability of profiles with sharp edges is also limited due to the minimum bending radius of the circumferential reinforcement fibers. In order to meet special performance requirements, it is possible to apply hybrid mixtures of the reinforcing materials. Table 8.1 gives a short overview on properties of reinforcement materials. [Pg.211]

The control processor as depicted in Fig. 3 may be more or less intelligent. It issues the instruction sequence that will be executed by the processor array. In the worst case (which means a less autonomous control processor), when an instruction is not fit for execution in the processor array (e.g., a simple print instruction), it might be offloaded to the front-end processor, which may be much slower than execution in the control processor. In the case of a more autonomous control processor, this can be avoided, thus saving processing interrupts in both the front-end and the control processor. Most DM-SIMD systems have the... [Pg.100]

For example, imagine a person walking on a construction site below an unguarded scaffold when a brick is accidentally bumped off and it falls to the ground. In the first instance, the brick falls to the ground and causes neither damage nor injury, but minor process interruption, as the brick has to be picked up and returned to its original position. [Pg.32]

An accident is an undesired event, which results in harm to people and/or property damage and/or process interruption. [Pg.98]

The resilience model proposed in this work is based on a typical course of a service delivering process, interrupted by an occurrence of a threat leading to a disruption of the process continuity. An example of such a course as a function of time is represented in Figure 2, on which three fundamental phases can be distinguished ... [Pg.2399]


See other pages where Process interruption is mentioned: [Pg.98]    [Pg.481]    [Pg.43]    [Pg.116]    [Pg.60]    [Pg.296]    [Pg.197]    [Pg.22]    [Pg.460]    [Pg.400]    [Pg.4]    [Pg.2094]    [Pg.222]    [Pg.665]    [Pg.133]    [Pg.60]    [Pg.2080]    [Pg.1191]    [Pg.10]    [Pg.182]    [Pg.8]    [Pg.140]    [Pg.147]    [Pg.597]    [Pg.161]    [Pg.273]    [Pg.142]    [Pg.540]    [Pg.509]   