Because of the foregoing requirements, a sophisticated organization is needed to do an effective job of new installation control. Prototype testing is best handled at the national level installation testing and plan examinations at the state, provincial, or regional level. Location of owners is a local operation with respect to residential and commercial structures but may be a state or provincial operahon for industrial sources. [Pg.422]

The problem with endpoint data usually occurs when they need to be reconciled against data collected by the clinical endpoint committee (CEO, which we discuss next. The endpoint/event data are almost always used for efficacy analyses but may be used for safety analyses as well. From a CDISC perspective, the endpoint/assessment is often considered a finding, as it is a planned examination, but it could also be considered an unplanned event. [Pg.36]

In practice, most lifetime prediction is based on service experience. Depending on the industry concerned, this can take the form of planned examination of components at the end of their service life or be limited to the explanation of warranty returns. Experience with polymers is now sufficiently long for service experience to be a prime source of information for components with lifetimes of up to 35 years. The construction industry provides a good example of systematic listing of component lifetimes, related to minimum quality levels and modified according to the service conditions. The electrical industry applies statistical methods to life components and predict failures. This, however, strays into the general field of engineering component lifetimes. In this book we are concerned with materials rather than components. [Pg.177]

Pari 1, Making a Plan examining documentation, line identification and contents, isolation, hazards, and what if approach. Pari 2, Shutdown and Isolation steps to isolate work area, replace control valve, and reopen line. [Pg.183]

Of the 1050+ plans examined in this database, the poorest performing ones refer to the synthesis of colchicine. Seven out of nine published plans to date for this target compound fall into the same trap of the isocolchicine—colchicines equilibrium in the late stages of the synthesis plans as shown in Figure 11.35. The Cha and the Banwell plans are the exceptions. The final structure... [Pg.919]

Figure 12.23a and b shows two views of how the difference/(non-sac) -/(sac) correlates with VMR. The greener plans are the ones with a positive difference. In this case, the greener plans are sparse represented by only 18% (105/587) of all plans examined. [Pg.947]

Experience rating modification factor The experience rating modification factor attempts to reflect an insured s actual losses in relation to the same insured s premium. A factor is a number applied to the manual premium to either increase or decrease the insured s final premium. A retrospective plan modifies the premium after the policy period or after most of the policy period, while a prospective plan examines prior periods, such as the last three years, to produce a premium. [Pg.113]

Always follow rule one Does the indication for the planned examination stand up ... [Pg.62]

In the routine examination of esters it is often a good plan to carry out two hydrolyses, one for the isolation and characterisation of the... [Pg.390]

Career planning is a necessary component of an overall approach to quality. Each employee should be viewed as having a career within the organization. People are more likely to take an innovative approach when they know that they have a long-term relationship with the organization. Confirm records and examine career plans. ... [Pg.196]

The design phase examines the best methods with which to impart the knowledge or develop the skills required to achieve the objectives. It allows management to lay out the most cost-effective training plan. [Pg.203]

The most difficult part of a field test is the flow meter, if it wasn t planned in the construction phase. There is no way to simulate a meter run if you don t have the proper pipe length. Figure 10-8 is an example of the requirements. An ASME long radius flow nozzle is preferred by the author, though a short throat venturi will do. The probability is that an orifice is all that will be available. It should be examined before and after the test to verify not only the bore diameter, but the finish. The bore should... [Pg.431]

A properly written safety plan eontains worker health and safety program information, guidanee, and alternatives. The HASP should quiekly answer the two questions What hazards are present and What provisions have been made to make sure that all tasks will be performed safely [1] Subsequent ehapters will provide a detailed examination of a typieal HASP. The information presented will be generie and should be modified to fit any site-speeifie hazards. [Pg.73]

The audit/inspeetion form that you should use ean be developed from the safety plan. A qualified person should examine the safety plan and eome up with a eheeklist that should serve as an audit/inspeetion form. Allowanees should be made to inelude items not speeifieally noted in the safety plan but that may be observed during field walk-throughs. Certain highly pertinent seetions of what OSHA uses when performing a eomplianee inspeetion of hazardous waste sites is ineluded in Appendix D. This inspeetion/audit form eovers many of the basies and ean be used a general guide. [Pg.90]

The confluence of sharply rising Operations and Maintenance (O M) costs. NRC requested Individual Plant Examinations (IPEs) and increased personal computer capabilities gave rise to the R R Workstation. Its uses and maintains-current PSA models and databases for individual plants to perform O M planning and scheduling, and uses the PSA in IPE models to identify plant design, procedure and operational vulnerabilities. The Risk and Reliability Workstation Alliance was organized by EPRI to support the R R Workshop in order to achieve O M cost reduction, plant productivity and safety enhancement through risk-based, user-friendly, windowed software louls (Table 3.6 8). The Alliance, initiated in 1992, includes 25 U.S. utilities and four international partners from Spain, France, Korea, and Mexico. SAIC is the prime contractor for the R R Workstation, with participation of five other PSA vendors. [Pg.144]

The Severe Accident Policy Statement formulates systematic safety examinations for detection of accident vulnerabilities and implementation of cost-effective changes. The NRC issued Generic Letter 88-20 to implement this plan through IPEs. While the primary goal was the identification of plant vulnerabilities, no definition of vulnerability was provided. Only 4 operators of BWRs identified vulnerabilities and only 16 operators of PWRs did so. Over 500 plant improvements were identified, but few vulnerabilities were. [Pg.398]

Risk-based information provides a foundation for regulation of severe accidents. Early PRAs, with large uncertainties, indicated risk that was above or below the Safety Goals depending on containment performance. Consequently the NRC developed an Integration Plan for Closure of Severe Accident Issues (SECY-88-47) with six main elements to this plan 1) individual plant examinations (IPE), 2) containment performance improvements, 3) improved plant oper itions, 4) severe accident research, 5) external event considerations, and 6) accident management. [Pg.401]

The first scheme for the separation of the six chief alkaloids of opium, VIZ., morphine, codeine, thebaine, papaverine, narcotine and narceine, is probably that of Plugge. Much later Kljatschkina investigated for each of these six bases the properties by means of which isolation and estimation could probably be effected and, on the basis of the results, devised a plan for such analyses. More recently Anneler has published a detailed account of a scheme with the same objective. l Attention had already been given to complex, systematic analyses of this kind, in connection with examination of the mixtures of opium alkaloids, which have long been in use in medicine in these at first only morphine and other alkaloids were determined, but in the more recent schemes provision is made for the estimation of each alkaloid. ... [Pg.177]

While the plan itself is not auditable by third parties, it may be auditable by second parties i.e. customers. The third party or registrar is entitled to examine the plan to ascertain that it is what it proclaims to be. The particulars are of no concern except those aspects relating to quality, such as the resources, quality objectives, customer satisfaction plans, and performance metrics. Whatever is stated on these aspects, the auditors will expect to see evidence that the business plan is not merely a wish list and that provisions have been made to enable implementation through the quality system. [Pg.140]

For each quality objective you should have a plan that defines the processes involved in its achievement. Assess these processes and determine where critical decisions are made and who is assigned to make them. Audit the decisions and ascertain whether they were contrary to the objectives. A simple example is where you have an objective of decreasing dependence upon inspection. By examining corrective actions taken to prevent recurrence of nonconformities you can detect whether a person decided to increase the level of inspection in order to catch the nonconformities or considered alternatives. Any person found making such a decision has clearly not understood the quality objective. [Pg.149]


See other pages where Plans examination is mentioned: [Pg.422]    [Pg.5]    [Pg.26]    [Pg.394]    [Pg.1798]    [Pg.84]    [Pg.223]    [Pg.225]    [Pg.110]    [Pg.422]    [Pg.5]    [Pg.26]    [Pg.394]    [Pg.1798]    [Pg.84]    [Pg.223]    [Pg.225]    [Pg.110]    [Pg.919]    [Pg.1041]    [Pg.771]    [Pg.55]    [Pg.48]    [Pg.445]    [Pg.46]    [Pg.423]    [Pg.30]    [Pg.203]    [Pg.222]    [Pg.222]    [Pg.160]    [Pg.1034]    [Pg.2]    [Pg.21]    [Pg.81]    [Pg.210]    [Pg.78]    [Pg.321]   