Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Operative receptance

The method for the dynamic evaluation of machine tools under test conditions has been described. The procedure evolved, covering the determination of the response data (and from this that of the operative receptance locus ), the prediction of the stability chart, the concept of the coefficient of merit describing machine quality, will be summarised in relation to the particular case of the bonded machine. [Pg.22]

The coefficient of merit (CoM) is a measure of the chatter resistance of a machine. It is proportional to the maximum width of cut which is unconditionally stable at all speeds. The factor of proportionality is dependent on the cutting conditions but not on the machine structure. The CoM is inversely proportional to the maximum negative in-phase component of the operative receptance of the structure, this being the cross receptance in the direction of the normal to the machined surface, due to a unit representative cutting force in the direction P as shown in... [Pg.22]

Fig. 1.16(b). The operative receptance/ ,p is derived from the direct and cross receptances R, obtained in this case using an impulse... [Pg.23]

Fig. 1.16. (a) Excitation set-up. (b) Orientation of excitation and response directions determination of operative receptance. [Pg.23]

On the basis of the data given in Table 1.6, the operative receptance for the particular cutting conditions considered is presented in Figs 1.18(a) and 1.18(b) for the slot and the helix cutter respectively. [Pg.25]

The CoM is derived from the operative receptance (Fig. 1.18(a)) which is dependent on two variables ... [Pg.31]

Figure 1.17(b) shows the direct and cross receptances of the cast-iron machine. From these the operative receptances are found, presented in Fig. 1.18(c) for the slot cutter and Fig. 1.18(d) for the helix cutter. The particular conditions to which these refer are specified in Table 1.6. [Pg.39]

Successful installation, or roll-out, of your PSM systems requires sound planning and effective execution. No matter how diligent you have been, or how receptive and well-managed your company may be, no system as complex as PSM can work perfectly the first time. As every project manager knows, it s impossible to anticipate every outcome or contingency—especially when human behavior is involved. Pilot testing a new system provides the opportunity to identify weaknesses under controlled conditions this in turn enables you to fix problems before the system becomes fully operational. Once these problems are corrected, the pilot test produces a template for installation that can be replicated elsewhere. [Pg.147]

In this case, the operations within a sequence are further defined according to various criteria such as whether they involve reception or transition of information, storage of information, manual control responses, inspections, and decisions. However, some other dimensions of an operation may require particular emphasis such as whether information is transmitted electronically, by external communication etc. A type of vertical axis can still be used to represent sequential order and if required this can incorporate the same timing information as temporal OSDs. [Pg.175]

Figure 1, Forcing functions for monomer (fu) and initiator (fi) feeds (a) sinusoidal (b) square-wave (c) reception vessel valve operating sequences which are synchronized with the feed policies (see Figure 2 for the location of the valves... Figure 1, Forcing functions for monomer (fu) and initiator (fi) feeds (a) sinusoidal (b) square-wave (c) reception vessel valve operating sequences which are synchronized with the feed policies (see Figure 2 for the location of the valves...
A reception centre and an on-site operation coordination centre (OSOCC) would be set up to deliver the means of assistance. Its backbone would be the ACAT team, reinforced by qualified experts and members of a protection network provided free of charge to the OPCW by States Parties. All of this would be facilitated through coordination with relevant... [Pg.72]

Reception centre and on-site operation coordination centre (OSOCC)... [Pg.78]

The role of the reception centre and of the OSOCC is to receive and distribute assistance. The ACAT of the OPCW, with the help of its external experts and in cooperation with States Parties and other relevant international organisations, will set up the centre and the OSOCC. There are States Parties and organisations which are willing to set up the OSOCC for the OPCW. This operation, however, requires conducting field exercises and training with the offering States Parties and international organisations. [Pg.78]

Two factors contribute to r K. One is the ratio of the magnetogryric ratios of the two different spins, and the other depends on relaxation mechanisms. Provided that the relaxation mechanism is purely dipole-dipole, other relaxation mechanisms affect spin I, then 4> may approach zero. Assuming that the dipolar mechanism is operational (no quadrupolar nuclei with I > 1/2 are present), r has the value ys/ 2y and is regarded as rimax. In the homonuclear case we have r max = 1/ 2. Usually one chooses nuclei where ys > y/ to ensure that the NOE is significant. For observation of 13C for instance, if the protons in the molecule are double irradiated, the ratio is 1.99 and 1 + r max equals approximately 3. To repeat a statement made above, proton broad-band irradiation enhances the intensity of the 13C nucleus, which otherwise has very low receptivity. [Pg.106]

The field test was conducted from May 2003, towards the end of the Severe Acute Respiratory Syndrome (SARS) outbreak in Hong Kong, until January 2004. The students taking part in the field tests were properly trained and equipped with medical safety equipment. Air samples collected at the reception area was designated as control samples (Fig. 12.9-12b). The Prototype Unit was located in the doctor s consultation room (Fig. 12.9-12c) and was operated 10 h/day, 6 days/week during the six months test period. [Pg.408]

Two-way radios, as discussed here, are limited to a direct unit-to-unit radio communication, either via single unit-to-unit transmission and reception, or via multiple handheld units to a base station radio contact and distribution system. Radio frequency spectrum limitations apply to all handheld units, and are directed by the FCC. This also distinguishes a handheld unit from a base station or base station unit (such as those used by an amateur [ham] radio operator), which operates under different wave-length parameters. [Pg.206]

Processing consists of a series of stages from reception of the products at the plant to their final dispatch. The first main stage comprises a number of preliminary operations to prepare... [Pg.176]


See other pages where Operative receptance is mentioned: [Pg.618]    [Pg.24]    [Pg.25]    [Pg.27]    [Pg.28]    [Pg.32]    [Pg.34]    [Pg.618]    [Pg.24]    [Pg.25]    [Pg.27]    [Pg.28]    [Pg.32]    [Pg.34]    [Pg.308]    [Pg.2]    [Pg.479]    [Pg.1123]    [Pg.246]    [Pg.124]    [Pg.67]    [Pg.259]    [Pg.51]    [Pg.116]    [Pg.130]    [Pg.164]    [Pg.984]    [Pg.141]    [Pg.404]    [Pg.477]    [Pg.557]    [Pg.93]    [Pg.141]    [Pg.119]    [Pg.80]    [Pg.259]    [Pg.44]    [Pg.116]    [Pg.259]   


SEARCH



Reception

Receptive

Receptivity

© 2024 chempedia.info