Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Operational testing certificate

Testing, certification, and installation rules for reheving devices are extensive. Eveiy chemical engineer responsible for the design or operation of process units should become veiy familiar with these rules. The pressure-relief-device paragraphs are the only parts of Sec. TII, Division I, that are concerned with the installation and ongoing operation of the facility all other rules apply only to the design and manufacture of the vessel. [Pg.1024]

If an employer accepts a previous road test certificate or operator s licence in lieu of a road test, the employing carrier must retain a legible copy of the certificate or hcense in the driver s qualification file. [Pg.194]

If parts are critical, additional test certificates will be claimed from the suppliers. All gaskets and piping parts have to fulfil the requirements of the pressure vessels guideline (Druckbehalter VO 97 3/EC). An independent ventilation system paired with leak detection will guarantee that no explosive gas mixes can appear at any time during operation. [Pg.219]

The test certificates for such analysis should mention the reference of order (name of client, order number, a copy of original specifications), production batch number, date of manufacture, and manufacturer s code—for ease of identification of the reaction units, process plants, operation sequence, or conditions maintained during production on the date of manufacture in future. These will be useful if any communication (complaint or compliment) is received about the product. [Pg.28]

Test certificates for refractory bricks, cements, and castable lining material (their properties and compositions) shall be obtained. Some typical values are given below. Plant engineers may specify more stringent conditions to suit the operating requirements. [Pg.61]

Boiler Feed Water System—Check the demineralised water plant units, water piping, operation of water pumps, condensate recycle lines, deaerator tank, drain lines, calibration of Boiler Feed Water tank, operation of level indicator, external insulation, location of temperature indicators, etc. Get examined the hydraulic test certificates for all pressure parts and subsequentiy obtain permission from Statutory Boiler Inspection Authority to commission the boiler. Note BFW pumps shall be run one by one to feed water into the boiler. Backpressure shall be created by throttiing overflow from WHB. Water flow... [Pg.80]

Test certificates for the material of constraction (which must be suitable for the operating conditions) should be available. This should give details of chemical composition, tensile and compressive strengths, and limitations on use at certain... [Pg.94]

Automatically operated control valves and bypass valve in the recirculation line with provision for manual override. Vendor shall provide test certificates as per law for all units operating under pressure. [Pg.143]

Starting November 10, 2017, OSHA requires one of four records a certificate from an accredited crane operator testing organization, documentation of qualification from the employer through an externally-audited employer program, documentation of qualification from the U.S. Military (only applies to employees of Department of Defense or Armed Forces and does not include private contractors), or a license from a state or local government (if that licensing meets the minimum requirements set forth by OSHA). [Pg.46]

A certificate from an accredited crane operator testing organization ... [Pg.168]

An operator wiii be deemed quaiified to operate a particuiar piece of equipment if the operator is certified under paragraph (b) of this section for that type and capacity of equipment or for higher-capacity equipment of that type. If no accredited testing agency offers certification examinations for a particuiar type and/or capacity of equipment, an operator will be deemed qualified to operate that equipment if the operator has been certified for the type/capacity that is most similar to that equipment and for which a certification examination is available. The operator s certificate must state the type/capacity of equipment for which the operator is certified. [Pg.1264]

Tests under this section may be administered in any language the operator candidate understands, and the operator s certificate must note the language in which the test was given. The operator is qualified under paragraph (b)(2) of this section to operate equipment that is furnished with materials required by this subpart that are written in the language of the certification. The operator may only operate equipment furnished with such materials. [Pg.1267]

If you do accept a former employer s road test certificate or the driver s CDL, you must be consistent and accept the documents for all drivers for fair employment practices. Of course, you cannot accept these documents for drivers who operate doubles, triples, or tank vehicles. [Pg.364]

The NSF 49 standard requires that a test for containment of microbiological aerosols be performed for the production model cabinet of each type. If that model cabinet passes the containment test, the testing certification under the NSF standard assumes that all other identical models would also pass. However, if a variation in the cabinet s operating environment caused by one or more of the conditions listed above occurs after the cabinet is installed, the cabinet could possibly fail to provide proper containment. [Pg.98]

In reply to Mr Brueton, I should like to feel that the bona fides of members could be established much better, but how is this to be done, especially when it comes to scaffolding and the operation of plant There is no certification. There is no test certificate. There is nothing. [Pg.101]

Berth operator should possess a supplier s certificate for any hose forming part of the pipeline confirming that tests have shown it is unlikely to burst in service. [Pg.481]

The essence of a plant engineering contract will be that the plant actually performs to the criteria laid down in the design, and this must be established before a Practical Completion Certificate is even considered. Tests will need to be made to the plant, and then it will be commissioned by the contractor and left in a condition whereby it can be operated as specified. When the work within the contract is complete, a certificate should be issued by the client (or employer) to the contractor. The architect or consulting engineer acting as agent normally performs this duty. [Pg.96]

Standards provide a base for a uniform system of accepted performance such as those found in engineering practice standards, material standards, and test standards. Hydrogen standards are typically written under a consensus process by technical committees (TC) representing a cross section of interested parties and issued in the United States, for example, by organizations such as the American Society of Mechanical Engineers (ASME) for pressure vessels, pipelines, and piping the Compressed Gas Association (CGA) for pressure vessel operation and maintenance and the Underwriters Laboratories (UL) for product certification. [Pg.477]


See other pages where Operational testing certificate is mentioned: [Pg.322]    [Pg.322]    [Pg.42]    [Pg.42]    [Pg.38]    [Pg.164]    [Pg.72]    [Pg.454]    [Pg.137]    [Pg.1264]    [Pg.1479]    [Pg.228]    [Pg.296]    [Pg.211]    [Pg.257]    [Pg.123]    [Pg.1007]    [Pg.133]    [Pg.611]    [Pg.25]    [Pg.26]    [Pg.32]    [Pg.975]    [Pg.51]   
See also in sourсe #XX -- [ Pg.322 ]




SEARCH



Certificate

Certification

Operability test

© 2024 chempedia.info