The performances of a safety system are maintained throughout its operation only if the maintenance range and periodic inspections required during the safety study are met, particularly considering the detection of dormant failures those that appear only when the system is solicited. The frequency of systematic verification comes from the collection of safety data and is undertaken about once or twice a year for each sensor and each actuator. [Pg.465]

Using a Computer Maintenance Management System (CMMS) ensures the periodicity of preventive maintenance and the tracking of corrective maintenance. In addition to the maintenance range and periodic inspection, the operation and maintenance plan also includes  [Pg.465]


Each operating company shall provide for periodic leakage surveys of the facility in its operating and maintenance plan. The types of surveys selected shall be... [Pg.70]

Each operating company having a hydrogen distribution system shall set up, in its operating and maintenance plan, a provision for the making of periodic leakage surveys on the system. [Pg.76]

Operational and maintenance plans should be prepared for the computer system and its associated measurement and control instrumentation. Operational plan review will focus on system reliability, performance, diagnostic records, instrument and system I/O calibration, and the provision of critical data to support the batch record. Procedures for controlling the system (e.g., system management, security, and process operations) should be reviewed to verify that they are current, in place, and being followed. For each procedure required for the system there should be documented evidence that the relevant operatives have been trained in its use. All procedures must be written and approved according to the site procedures for writing and approving SOPs. [Pg.632]

The NMED approved an operation and maintenance plan in November 1995, and DBS A started operation of the SVE system in early December 1995. On April 29, 1996, monitor well MW-9 was incorporated into the SVE network to provide further control of the groundwater plume (Fig. 6). [Pg.350]

Too much or too little documentation Project progress reporting and action planning Resource inadequacy Regulatory inspection readiness Ease of system operation and maintenance Planning ahead for retirement and decommissioning... [Pg.8]

During this period, construction documentation shall be established that provides an accurate basis for system commissioning and validation. Further, operation and maintenance plans, instructions, SOPs, and SLAs shall be developed in readiness for the handover of the assets to the operational environment. [Pg.702]

Assets are constructed in accordance with the Detailed Design that provides a definitive description of the systems and components required to build facilities and assemble systems in a manner that will meet the business need. During this period, construction documentation is established to provide an accurate basis for system commissioning and validation. Further, operation and maintenance plans, instructions, SOPs and SLAs are developed in readiness for the handover of the assets to the operational environment. The time required to prepare, review and obtain approval of these documents must not be underestimated and should commence as soon as the FMEA process has defined the asset management strategy. [Pg.193]

The local educational agency shall, within 720 days after October 22, 1986, develop and begin implementation of an operation and maintenance plan with respect to friable asbestos-containing material in a school building under its authority. Such plan shall provide for the education of school service and maintenance personnel about safety procedmes with respect to asbestos-containing material, including friable asbestos-containing material. [Pg.913]

L.7.1.2.4 The approval process results in a list (or table) of equipment approved for use in SIS applications. This list should be periodically reviewed to ensure that new or modified versions of equipment are evaluated in a timely manner and that the list considers performance based on current operating and maintenance plans. [Pg.188]

State of the art in Operation and Maintenance planning of offshore wind farms... [Pg.1119]

In the following sections first a short literature review in O M models of offshore wind farms is given and then, an O M study for a reference wind farm is presented. Furthermore, a discussion on optimal operation and maintenance planning of offshore wind farms is given. [Pg.1119]

Such a high number of entries requires an appropriate operation and maintenance plan. Moreover, it is not possible to perform maintenance operations dnring the operation of the accelerator, and during the technical stop phase, maintenance operations are veiy difficult to undertake because they impede the smooth functioning of the system, which is much in demand during these periods. Good coordination of activities and flexibility of the teams becomes very important. [Pg.473]

Overall operation and maintenance planning To develop a plan for operating and maintaining the E/E/PE safety-related systems EUC, the EUC control system and human factors E/E/PES safety-related systems As above i.e. Safety requirements Spec. A plan for operating and maintaining the E/E/PE safety-related systems (SIS)... [Pg.24]

The operations and maintenance planning tasks reveals a lot of things we ought to get right before we go too far. lEC have a good point. [Pg.259]


See other pages where Operation and maintenance plan is mentioned: [Pg.16]    [Pg.66]    [Pg.81]    [Pg.81]    [Pg.1232]    [Pg.81]    [Pg.573]    [Pg.210]    [Pg.153]    [Pg.32]    [Pg.459]    [Pg.465]    [Pg.256]   


SEARCH



Maintenance Plan

Maintenance planning

Operating and maintenance

Operational planning

Operations and Planning

Operations planning

© 2024 chempedia.info