Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Measurement need for

The instrumentation is also as varied as the variety of parameters to be measured. However, the choice is severely limited if the instrumentation needs to be of a turnkey variety. An obvious example is MRI instruments for clinical medicine that are technologically well suited for particle density imaging. MRI technicians in clinical MRI facilities are well trained to make standard images but, with rare exceptions, would not be able to make the more complex measurements needed, for example, for velocity imaging. Unfortunately, clinical MRI instruments are very expensive and also require expensive physical facilities to house them. Furthermore, medical facilities are usually not willing to divert the use of their expensive MRI instrument for purposes other than their needs, especially if instrument settings need to be changed. [Pg.506]

Remark 2. The permutation matrix IIU, obtained as a by-product of the Q-R factorization procedure of A2, enables an easy classification of the unmeasured process variables, as is indicated by Eq. (4.15). The variables in subset un ru correspond to the minimum number and the location of measurements needed for the system to satisfy the estimability condition, that is, that all unmeasured variables be determinable. [Pg.78]

On the other hand, the principles of some additional rheological measurements needed for comparison, will briefly be reviewed in this section. The cone-and-plate geometry has already been mentioned above. With such an arrangement the apex of a rather flat cone rests on a flat... [Pg.175]

Calculation results show that the indirect RF caused by changes in methane and TO content is considerable for all MGC/TO precursors. Whereas RF due to changes in the content of methane is determined mainly by the effect of methane emissions, in the case of TO it is controlled by all MGC precursors, especially by nitrogen oxides. The indirect RF connected with TO can be so great that MGC/TO precursors should be considered like those of MGCs, which should be taken into account when evaluating possible climate change and measures needed for its prevention. [Pg.431]

The book deals primarily with crude oils and petroleum products derived from crude oils. In addition to cleanup techniques, it covers how oil spills are measured and detected, and the properties of the oil and its long-term fate in the environment. The effects of an oil spill on the environment and the effectiveness of cleanup and control vary significantly with the type of oil spilled. The types of oil are reviewed to help the reader understand the different cleanup and control measures needed for different types of oil and environmental circumstances. A glossary of technical terms is provided at the back of the book. [Pg.3]

According to Miller and Miller (in Plaass 1994, 156) Kant s notion of proper science limits the everyday objectificational paradigm to only what can be described in terms of spatio-temporal determinations because this is necessary to assure the kind of reproducibility and measurability needed for mathematization of nature. Such reproducibility demands the experimental isolatability characteristic... [Pg.83]

The essential analytical information required from a chromatogram is for analyte identification and to determine the amount present in the sample. The minimum data required is therefore retention time and peak area and an assessment of peak separation, the basic measurements needed for each peak are... [Pg.401]

The selection of tests to be used in these comparability studies typically includes release testing (or some subset of release testing), but may also require the application of more advanced nonroutine analytical characterization tools, in order to provide more detailed information to support comparability. The analytical tools and measurements needed for a given comparability study will thus depend on the nature of and extent of the process change (i.e., minor or major). [Pg.228]

Figure 6.118 shows the integrated Eq. (3) for the steady state of quasi-isothermal experiments (A). The measurements needed for this analysis are displayed for polystyrene in Figs. 6.14 and 6.15 and for poly(ethylene terephthalate) in Figs. 4.129 and 4.130. The parameters in Fig. 6.118 were arbitrarily chosen to clarify the three different contributions to the approximation shown in the figure. For a solution fitted to the experiments for poly(ethylene terephthalate), see Fig. 4.131. The parameters A and A represent the amplitude contributions due to the change in x and N with temperature, and P and y are phase shifts. The plotted (N - No)/N is proportional to the heat flow (and thus to ACp). The curve (A), however, is not a sinusoidal response. Figure 6.118 shows the integrated Eq. (3) for the steady state of quasi-isothermal experiments (A). The measurements needed for this analysis are displayed for polystyrene in Figs. 6.14 and 6.15 and for poly(ethylene terephthalate) in Figs. 4.129 and 4.130. The parameters in Fig. 6.118 were arbitrarily chosen to clarify the three different contributions to the approximation shown in the figure. For a solution fitted to the experiments for poly(ethylene terephthalate), see Fig. 4.131. The parameters A and A represent the amplitude contributions due to the change in x and N with temperature, and P and y are phase shifts. The plotted (N - No)/N is proportional to the heat flow (and thus to ACp). The curve (A), however, is not a sinusoidal response.
The types of measurements needed for fixed facilities can be determined in advance based on the likely composition of any release. For an event involving a radioactive substance of unknown composition, truly dangerous levels can typically be detected by gross gamma measurements. These should then be followed up by beta and alpha measurements. [Pg.167]

Summary of Measurements Needed for Nuclear Criticality Sofety—An Industrial Point of View, Ricardo ArHgas (GE-San Jose)... [Pg.396]

Describing measuring means caring about measurement uncertainty, which is a universal concept. The universal and very useful document on measurement uncertainty is the Guide to the Expression of Uncertainty in Measurement (GUM) [4]. In this chapter the concepts of measurement needed for preparation and manufacturing of pharmaceutical... [Pg.652]

Description of critical condition subcritical multiplication, subcritical measurements, need for start-up source, start-up accident and prevention by counter interlock. [Pg.161]

Write the project action plans. Apply a methodology to evaluate and change the process. Such a methodology also appears in Chapter 12, where we discuss the do" phase in considerable detail. Test solutions in pilot testing. Implement the organization structure and measurements needed for full-scale implementation. [Pg.81]

M. R. Guerin and J. L. Epler, Determining emissions measurements needs for an emerging industry—advanced fossil fuels utilization. Presented at the First Conference on Determining Fugitive Emissions Measurements Needs, Hartford, Connecticut, May 17-19, 1976, EPA Technology Series, EPA-600/2-76-246. [Pg.264]

When all measurements needed for the analysis were reported, it was found that polymers that do not contract at elevated concentration have simple exponential dependences of r on c. Polymers that do contract with increasing c have stretched-exponential dependences of r on c. The degree of chain contraction accounts quantitatively for the deviation of r (c) from a simple exponential. We return to a consideration of dielectric spectroscopy after considering other static scattering methods for determining Rg. [Pg.144]

Prevention It is better to prevent waste than to treat or clean up waste after it has been created. Prevention starts by avoiding the use or generation of hazardous substances. If hazardous materials are not produced, then treatment and disposal are not required. Moreover, extraordinary safety measures needed for the manufacture of hazardous materials are not reqnired, making the green product less costly to produce and easier to use. Why waste time, money, and effort to deal with these avoidable conseqnences Remember the qnote from Benjamin Franklin An ounce of prevention is worth a pound of cure. ... [Pg.24]

Another small but important specialty area in electrical engineering is instrumentation and measurement. Engineers in this specialty are concerned with the use of electronics to make measurements needed for research, development, and operation. They have devised electronic instruments to measure a wide variety of properties and quantities such as temperature, speed, pressure, and flow rate. These instruments have broad applications in business and industry and contribute in many ways to public health and safety. [Pg.26]

The process to determine the thermal control measures needed for the reactor module would include the steps indicated below. An important effort that would need to happen in parallel with the process described would be the identification and testing of candidate materials and processes required to achieve the desired thermal control. [Pg.513]


See other pages where Measurement need for is mentioned: [Pg.256]    [Pg.544]    [Pg.195]    [Pg.41]    [Pg.322]    [Pg.95]    [Pg.1581]    [Pg.233]    [Pg.80]    [Pg.233]    [Pg.550]    [Pg.168]    [Pg.36]    [Pg.269]    [Pg.249]    [Pg.26]    [Pg.245]   
See also in sourсe #XX -- [ Pg.26 ]




SEARCH



The Need for Tracking and Measurement

© 2024 chempedia.info