Installation of equipment

Also, maintenance workers should inspect roof penetrations and the installation of equipment on roofs during constmction. Because the maintenance department is responsible when the roof leaks, their inspection of roof penetrations during constmction can prevent future problems. Maintenance must also make sure that the roof was not damaged during constmction. [Pg.442]

Costs include installation of equipment but not field wiring. The figures shown ate typical but capable of wide variation. [Pg.40]

Installation of equipment hauling, foundations, assembly, debugging, and buildings, if required. [Pg.295]

Transport and delivery of materials and equipment Inspection of equipment entering the site Storage of equipment awaiting installation Storage of spares and consumables Installation of equipment Commissioning tests Acceptance tests... [Pg.349]

BS5924 Construction and installation of equipment for resistance welding. [Pg.373]

In addition to the direct cost of the purchase and installation of equipment, the capital cost of a project will include the indirect costs listed below. These can be estimated as a function of the direct costs. [Pg.252]

Because of the potential for extensive or catastrophic damage that could result from a malevolent act, additional equipment sources should be identified for the acquisition and installation of equipment and repair parts in excess of normal usage. This should be based on the results of the specific scenarios and critical assets identified in the vulnerability assessment that could be destroyed. For example, numerous pumps, vats, and mixers, specifically designed for the chemical industry, could potentially be destroyed. A certain number of long-lead procurement equipment should be inventoried and the vendor information for such unique and critical equipment maintained. In addition, mutual aid agreements with other industries, and... [Pg.142]

Guthrie and Garrett. It uses equipment factors to generate separate costs for each of the "disciplines associated with the installation of equipment, such as installation labor, concrete, structural steel, and piping, to obtain direct field costs for each type of equipment, e.g., heat exchangers, towers, and reactors. [Pg.16]

Design Qualification (DQ) is the first validation element of a new facility system or equipment, where adherence to the user s specifications and to GMP rules is demonstrated. Installation Qualification (IQ) follows with the verification of adequacy of the area, installation of equipment pipelines, utilities, instrumentation, and conformity of the material used to the project specifications. At the Operational Qualification (OQ) phase, carried out after installation of all equipment, it is verified whether the system, when in operation, complies with the acceptance criteria defined in the validation plan. Once the OQ phase is successfully finalized it is possible to proceed with the calibration procedures, operation and cleaning, operator training, and preventive maintenance program. After IQ and OQ are concluded, it is time for the Performance Qualification (PQ), with the aim of verifying that what was designed, built, and operated results in a product that meets the expected specifications. Production and QC personnel are specially trained for these assessments. The tests can be done with the product of interest or a placebo, and are related to all operations, from raw material reception to product release (EC, 2001). [Pg.359]

The principle for the documentation trail and qualification process surrounding the purchase installation of equipment is a matter of common sense. The following terms are by no means universal but the principle and elements of these are essential to meeting cGMP. [Pg.103]

The installation of equipment involves costs for labor, foundations, supports, platforms, construction expenses, and other factors directly related to the erection of purchased equipment. Table 6 presents the general range of installation cost as a percentage of the purchased-equipment cost for various types of equipment. [Pg.171]

Subcontractors on the jobsite should be responsible for start-up as well as installation of equipment. Equipment manufacturers typically have personnel available to ensure appropriate start-up procedures are followed. If several trades are involved in the installation of a particular piece of equipment, then one trade should be assigned, by contract, as having coordinating responsibility for that piece of equipment. This will minimize finger pointing when equipment does not start or operate properly. This can be a sensitive issue and a construction manager can set the tone for cooperation in this area. [Pg.206]

A plot measuring 1 acre at the Othello Research Farm of the Irrigated Agricultural Research and Extension Center, 10 miles east of Othello, Wash., was assigned for use. To avoid boundary effects and to facilitate installation of equipment for flow measurements, a section measuring 0.46 acre was used for the study. [Pg.142]

Removal installation of equipment in operating areas engineered while existing equipment is in operation requiring plant shutdown. [Pg.324]

Installation of equipment in areas that may be cleared before design Piping orthos hr x 1.3-1.5 Same as above. [Pg.325]

VODARO measurements, in addition to those being carried out in this country and in England, are under way at Arosa, Switzerland, under the direction of Migeotte and Paetzold is planning installation of equipment at Weissenau, Germany, where he will be able to make direct comparisons among the results of VODARO, umkehr measure-... [Pg.221]

Installation of equipment that produces less waste... [Pg.97]

If a= 1, the layout becomes a 3 design, which is not a rotatable design, but does lend some simplicity in that only three levels of each factor are used instead of five. This may be useful if the factor levels are difficult to change, such as the installation of equipment (changing extruder screws) or the need for system equilibration when adjusting temperatures. [Pg.147]

The design, style, and installation of equipment shall be corresponding to production requirements, and shall permit effective cleaning, disinfection or sterilization, and confusions may be prevented. [Pg.350]

Initial-phase management for development and installation of equipment/products... [Pg.553]


See other pages where Installation of equipment is mentioned: [Pg.866]    [Pg.524]    [Pg.229]    [Pg.23]    [Pg.380]    [Pg.84]    [Pg.144]    [Pg.119]    [Pg.201]    [Pg.454]    [Pg.373]    [Pg.165]    [Pg.690]    [Pg.7]    [Pg.226]    [Pg.454]    [Pg.17]    [Pg.315]    [Pg.521]    [Pg.870]    [Pg.163]    [Pg.476]    [Pg.161]    [Pg.183]    [Pg.238]    [Pg.192]   