Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Installer equipment

An alternative to macroclimate systems is the creation of microclimates. The objects are placed within smaller spaces, such as cases, in which an ideal environment is maintained. One possibiUty is to install equipment to control the climate in individual cases, or groups of cases with similar materials, by mechanical means. [Pg.429]

Modification of Equipment. (/) Install equipment that produces minimal or no waste. 2) Modify equipment to enhance recovery or recycling options. (I) Redesign equipment or production lines to produce less waste. (4) Improve operating efficiency of equipment. (5) Maintain strict preventive maintenance program. [Pg.226]

The Marshall and Swift (M S) Equipment Cost Index (6), formerly Marshall and Stevens, for installed equipment costs is pubHshed monthly in the ChemicalPngineering]om n. A. The indexes reported are the all-industries, process industries, and several specific industry indexes. The yearly all-industries index, given in Table 1, is based on 47 industrial categories. This is commonly used for the translation of purchased process equipment costs, even though... [Pg.441]

IMPLEMENTATION Justify projects and obtain fundir>g installation (equipment) Implementation (procedure) Evaluate performance ... [Pg.2166]

Install equipment to Be vented outdoors, weather and other factors permitting. [Pg.2319]

Most defects can be detected using one or more appropriate nondestructive testing techniques. However, in the absence of routine nondestructive testing inspections, identification of defects in installed equipment is generally limited to those that can be observed visually. Defects such as high residual stresses, microstructural defects such as sensitized welds in stainless steel, and laminations will normally remain undetected. Defects that can be detected visually have the following features ... [Pg.317]

Avoid use of nonconductive materials of construction for both installed equipment and charging containers, funnels, etc. [Pg.85]

The following are a few types of grounding electrodes commonly used for the grounding of industrial installations, equipment grounding or small and medium-sized sub-stations. [Pg.697]

The first step in failure rate determination for a specific type of process equipment is to obtain a list of the installed equipment at the plant and sufficient description data to assign it a number within the CCPS Taxonomy. The descriptive information desired by the analyst is ... [Pg.214]

Material and service schedules for important items of material or installed equipment indicating deadlines for such steps as preparation of shop drawings or samples, beginning of fabrication, date of shipment and date needed at the job site. [Pg.832]

The pre-installation equipment inspection should include the following stuffing box space, lateral or axial shaft movement (end play), radial shaft movement (whip or deflection), shaft runout (bent shaft), stuffing box face squareness, stuffing box bore concentricity, driver alignment, and pipe strain. [Pg.950]

NOTE The term pretreatment is generally assumed to refer to some form of permanently installed equipment employed to treat MU water or FW. Such equipment provides physical or physicochemical water conditioning processes (such as ion-exchange softening) and is employed prior to the application of any internal FW or BW chemical treatments. [Pg.186]

How much room will be taken up by permanently installed equipment ... [Pg.4]

The first step in space planning should be to estimate how much bench space wall be required. Benches must accommodate various pieces of permanently installed equipment and still have room for both frequently performed and special one-time tasks. Benches may be either installed against the wall or placed back to back in peninsulas or islands. The exact configuration will be worked out later. For now, what is important is the total number of running feet of bench space that will be required. [Pg.8]

When the company planned to expand production the local authorities ordered the company to reduce its current air emissions. As a result the company intended to install equipment to capture the trichloroethylene and incinerate the solvents from the painting plant.31 However, an independent... [Pg.33]

The cost of a carbon steel heat exchanger needs to be adjusted for the material of construction. Because of the low pressure rating, no correction for pressure is required (Table 2.5), but the cost needs to be adjusted for the material of construction. From Table 2.4, /m =2.9, and the total cost of the installed equipment can be estimated from Equation 2.6 and Table 2.7. If the project is a complete new plant, the contribution of the heat exchanger to the total cost can be estimated to be ... [Pg.22]

As a consequence of the development of extraction methods for STA based on mixed-mode SPE columns, as well as of the recent introduction of instruments for the automated sample preparation allowing efficient evaporation and derivatization of the extracts, full automation of STA methods based on GC-MS analysis is also available. It needs GC-MS instalments equipped with an HP PrepStation System. The samples directly injected by the PrepStation are analyzed by full scan GC-MS. Using macrocommands, peak identification and reporting of the results are also automated. Each ion of interest is automatically selected, retention time is calculated, and the peak area is determined. All data are checked for interference, peak selection, and baseline determination. [Pg.315]

A significant gas production need only be anticipated in conjunction with the decomposition reaction of material C. During normal operation the installed equipment can handle all possible vapour/gas volumes that can be produced. [Pg.250]

The total delivered installed equipment cost is the fixed capital investment and, corrected for 2 years of inflation, will be 12,290,000 x 1.035 x 1.040 = 13,229,000. [Pg.15]

Each user-accessible setpoint of the installation, equipment, or control system will be reported. Results shall be written in a report. [Pg.425]


See other pages where Installer equipment is mentioned: [Pg.176]    [Pg.444]    [Pg.872]    [Pg.875]    [Pg.2038]    [Pg.86]    [Pg.700]    [Pg.383]    [Pg.56]    [Pg.658]    [Pg.216]    [Pg.109]    [Pg.32]    [Pg.305]    [Pg.372]    [Pg.167]    [Pg.21]    [Pg.23]    [Pg.417]    [Pg.298]    [Pg.160]    [Pg.318]    [Pg.470]    [Pg.28]    [Pg.496]    [Pg.26]    [Pg.33]    [Pg.302]    [Pg.40]    [Pg.57]    [Pg.150]   
See also in sourсe #XX -- [ Pg.371 ]




SEARCH



Costs of equipment installed cost multipliers

Costs of equipment purchased and installed cost, example

Electric equipment, costs installation cost

Electrical equipments and installations

Equipment costs, estimation installation

Equipment installation

Equipment installation/operation

Equipment, Installation and Costs

Installation Equipment layout

Installation Qualification of Computerized Equipment

Installation and Equipment Technique

Installation costs for equipment

Installation of equipment

Installation safety process equipment

Installations, electrical equipment

New Equipment Installations

Pipe Installation Equipment Suppliers

© 2024 chempedia.info