Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Drill structures

A method of estimating original gas in place using the results of drilling (structural assessment, effective thickness, porosity, gas saturation, pressure, temperature, gas characteristics, and the boundaries of the accumulation). These data may be supplemented by geological or geophysical data on the shape of the reservoir. [Pg.14]

This serves to illustrate the importance of detailed core analysis and geochemistry to decipher the status of drilled structures, i.e. other data points than well tests and modelling are needed to construct a model for palaeo-and recent petroleum migration in a basin. The fact that the structures earlier contained a fluid phase (not, as assumed, only gas) places a totally different perspective on the timing of oil migration relative to caprock formation, structural development, and field filling in Halten Vest. [Pg.351]

McClelland, B., Focht, J.A., Jr. (1955). Soil mechanics as applied to mobile drilling structures. Petroleum Division Houston TX. [Pg.305]

Machining of plastics is often necessary as, for example, in cutting and finishing Formica (melamine laminate) countertops or drilling structural pultruded shapes for attaching to supports, etc. While such operations are commonplace when working in metals or wood, special tools and practices are necessary when machining plastics. [Pg.462]

Exploratory Drilling Structures A Mobile Offshore Drilling Unit [MODU] configuration is largely determined by the variable deck payload and transit speed requirements. [Pg.668]

The normal profile of corrosion of unprotected steel, as in the case of pilings or the supporting legs for offshore oil-drilling structures, is shown in Fig. 2.22 based on the measurements of the distribution of corrosion of test pilings exposed in a partially enclosed basin at Kure Beach, North Carolina. ... [Pg.134]

A common feature of the hole drilling experiments described above is that they were performed without electrochemical control of the semiconductor surface. As a result, quantum yields were always much less than unity and thewidth of the space charge region was probably very low. The latter factor doubtlessly magnified differences between quantum yields observed for ultraviolet and visible light resulting from differences in the penetration depth and hence efficiency of electron-hole separation. T o date, no studies of the effects of electrode bias on the rates and profiles of laser drilled structures have been presented. [Pg.201]

The pores between the rock components, e.g. the sand grains in a sandstone reservoir, will initially be filled with the pore water. The migrating hydrocarbons will displace the water and thus gradually fill the reservoir. For a reservoir to be effective, the pores need to be in communication to allow migration, and also need to allow flow towards the borehole once a well is drilled into the structure. The pore space is referred to as porosity in oil field terms. Permeability measures the ability of a rock to allow fluid flow through its pore system. A reservoir rock which has some porosity but too low a permeability to allow fluid flow is termed tight . [Pg.13]

Drilling Jackets are small steel platform structures which are used in areas of shallow and calm water. A number of wells may be drilled from one jacket. If a jacket is too small to accommodate a drilling operation, a jack-up rig (see below) is usually cantilevered over the jacket and the operation carried out from there. Once a viable development has been proven It is extremely cost effective to build and operate jackets in a shallow... [Pg.32]

Semi-submersible rigs are often referred to as semis , and are a floating type of rig. Like the jack-up, a semi is self contained. The structure is supported by large pontoons which are ballasted with water to provide the required stability and height. The rig is held in position by anchors and mooring lines or dynamically positioned by thrusters. A large diameter steel pipe ( riser ) is connected to the sea-bed and serves as a conduit for the drill string. The blowout preventer (BOP) is also located at the sea-bed ( sub sea stack ). [Pg.33]

For many reasons it may not be possible or desirable to drill a vertical well. There may be constraints because of the surface location. In the subsurface, multiple targets, the shape of the structure, faults, etc. may preclude a vertical well. Figure 3.14 shows some of the deviated we//trajectories freguently used in industry deviated with tangent to target, S-shaped and horizontal. [Pg.46]

At the development planning stage, a reservoir mode/will have been constructed and used to determine the optimum method of recovering the hydrocarbons from the reservoir. The criteria for the optimum solution will most likely have been based on profitability and safety. The model Is Initially based upon a limited data set (perhaps a seismic survey, and say five exploration and appraisal wells) and will therefore be an approximation of the true description of the field. As development drilling and production commence, further data is collected and used to update both the geological model (the description of the structure, environment of deposition, diagenesis and fluid distribution) and the reservoir model (the description of the reservoir under dynamic conditions). [Pg.332]

The 45° transducer was used to inspect side drilled holes, with their centres located 40 mm below the surface. Due to the coarse material structure the echoes from the holes were totally masked by clutter. An example of an ultrasonic response signal, emanating from a hole with a diameter of 8 mm, is shown in the left part of Figure 3. Scanning the surface above the 8 mm and 10 mm holes resulted in the B-scan image shown in the upper part of Figure 4. [Pg.92]

Structure problems either by blocked cooling ducts or incorrect drilled holes will be able to identify by transmission thermography. Illustration 5 shows a hollowpoured blade with a typical error. A core break during pouring causes a bar, which obstructs the air supply. In the... [Pg.404]

Time-dependent fluids are those for which structural rearrangements occur during deformation at a rate too slow to maintain equilibrium configurations. As a result, shear stress changes with duration of shear. Thixotropic fluids, such as mayonnaise, clay suspensions used as drilling muds, and some paints and inks, show decreasing shear stress with time at constant shear rate. A detailed description of thixotropic behavior and a list of thixotropic systems is found in Bauer and Colhns (ibid.). [Pg.631]

To recover oil from the continental shelf of arctic Canada and Alaska, drilling and production platforms must be built some miles offshore, in roughly 40 m of water. This is not a great depth, and would present no new problems were it not that the sea freezes in winter to a depth of around 2 m. Wind blowing across the surface of the ice sheet causes it to move at speeds up to 1 m s pressing it against the structure. Ice is... [Pg.303]

Fire North Collinwood School, Cleveland, Oliio March 8, 1908 176 Need realized for fire drills and plamiing of school structures... [Pg.22]

Petroleum Enhancing oil recovery, regulation of filterability and rheological properties of drilling muds, thickening of water, soil structure formation, oil flotation... [Pg.70]

Acrylamide polymers are used as multipurpose additives in the oil-producing industry. Introduction of polymers into drilling fluids-drilling muds improves the rheological properties of the fluids in question, positively affects the size of suspended particles, and adds to filterability of well preparation to operation. Another important function is soil structure formation, which imparts additional strength to the well walls. A positive effect is also observed in secondary oil production, where acrylamide polymers additives improve the mobility of aqueous brines injections, which contribute to... [Pg.71]


See other pages where Drill structures is mentioned: [Pg.280]    [Pg.73]    [Pg.321]    [Pg.404]    [Pg.600]    [Pg.305]    [Pg.253]    [Pg.329]    [Pg.30]    [Pg.583]    [Pg.503]    [Pg.280]    [Pg.73]    [Pg.321]    [Pg.404]    [Pg.600]    [Pg.305]    [Pg.253]    [Pg.329]    [Pg.30]    [Pg.583]    [Pg.503]    [Pg.17]    [Pg.33]    [Pg.34]    [Pg.38]    [Pg.43]    [Pg.44]    [Pg.269]    [Pg.269]    [Pg.402]    [Pg.902]    [Pg.1566]    [Pg.24]    [Pg.367]    [Pg.373]    [Pg.765]    [Pg.411]    [Pg.911]    [Pg.915]    [Pg.921]   
See also in sourсe #XX -- [ Pg.301 , Pg.302 , Pg.303 ]




SEARCH



© 2024 chempedia.info