Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Cost Components

However, the concentration of impurity in the recycle is varied as shown in Fig. 8.5, so each component cost shows a family of curves when plotted against reactor conversion. Reactor cost (capital only) increases as before with increasing conversion (see Fig. 8.5a). Separation and recycle costs decrease as before (see Fig. 8.56). Figure 8.5c shows the cost of the heat exchanger network and utilities to again decrease with increasing conversion. In Fig. 8.5d, the purge... [Pg.246]

Figure 8.6 shows the component costs combined to give a total cost which varies with both reactor conversion and recycle inert concentration. Each setting of the recycle inert concentration shows a cost profile with an optimal reactor conversion. As the recycle inert concentration is increased, the total cost initially decreases but then... [Pg.247]

Electrical costs involve four main components (1) power wiring, (2) lighting, (3) transformation and service, and (4) instrument and control wiring. A breakdown of these component costs as a percentage of total elec trical cost is given in Table 9-60. [Pg.872]

Engineering is mainly labor but has a small component cost which can be classified with equipment and materials, such as tools, paper, pencils, and reproduction costs. [Pg.877]

For example, the characteristic dimension A on the cover support leg was critical to the success of the automated assembly process, the potential failure mode being a major disruption to the production line. An FMEA Severity Rating (S) = 8 is allocated. See a Process FMEA Severity Ratings table as provided in Chrysler Corporation et al. (1995) for guidance on process orientated failures. The component cost, Pc = 5.93 and the number planned to be produced per annum, N = 50000. [Pg.88]

Basic component costs (in, times 1000) for remote repair facility... [Pg.1034]

Even when the time comes to make a purchasing decision, an energy-efficient motor purchase is not a certainty. Sometimes an energy-efficient motor will be the economically efficient choice at other times, not. The capital investment decision is based on the cost in relation to performance, efficiency and reliability. Moreover, the decision depends on the application and the amount of time the motor is in operation. It can be the major component of a product (drill or mixer), or a minor component (computer disk drive) it can be the major component cost of a product (fan), or it can be a minor component cost (stereo tape deck) it can run almost constantly (fan, pump, and machinery), or only a few minutes a day (vacuums and power tools). For example, contractors purchase circular saws almost solely based on performance and reliability. Time is money, and since the saw is operating only a few minutes a day and the contractor is often not responsible for the electricity costs to run the motor, energy efficiency is not a consideration performance and reliability are what matter most. On the other hand, an industrial user, who runs huge electric motors twenty-four hours a day to work pumps, machinery, and ventilation equipment, is very concerned tvitli energy efficiency as well as performance and reliability. [Pg.404]

Chemical Engineering Plant Cost Index [42]. Probably the most commonly used cost adjusting index printed/updated monthly is in Chemical Engineering Magazine send has established continuity over many years. Its breakdo vn component costs apply to plants and plant equipment/systems. [Pg.47]

Traditionally, customers employ water treatment service companies simply as external contractors to assist in the maintenance of clean and efficient waterside surfaces in their various heating, steam generating, cooling, and certain industrial process systems. The customers benefit from genuine improvements in operating efficiency, reductions in maintenance time, and replacement component costs. In addition, where industrial processes are involved they often profit from an added-value, due to an improved product quality or reduction in manufacturing cost. [Pg.994]

Figure 13.22 shows the component costs combined to give a total cost that varies with both reactor conversion... [Pg.284]

The coupling of these improvements needs to be proven to meet endurance goals operation at pressure will definitely require design changes. The studies described in the recent literature provide updated information on promising development of the electrodes, the electrolyte matrix, and the capability of the cell to tolerate trace constituents in the fuel supply. The objectives of these works are to increase the life of the cells, improve cell performance, and lower cell component costs. Descriptions of some of this work follow. [Pg.138]

Development of MCFC cell, stack and system components. Improvement of efficiency and durability and cost reduction of MCFC systems through optimization of cell and stack components cost-benefit analysis to overcome the technical and economic barriers to the development and employment of MCFC. Budget 2.6 million. Partners ENEA, Ansaldo Fuel Cells Co, CNR-ITAE, CESI, Universities of Perugia, Messina and Genova. [Pg.144]

TABLE 4 Frozen Soil Barrier Component Costs"... [Pg.925]

The pressure is the main cost-driver, since it affects all process-housing component costs, as well as operational costs. Standard petro-chemical components can be used, as the maximum design pressure value can be set close to the CO2 critical value. [Pg.643]

Component Cost per Extraction Component Lifetime ( Extractions ... [Pg.238]

Therefore, the total estimated cost of accidents related to sleepiness was the sum total of all component costs. Thus, the lower estimate of cost related to sleepiness includes 1,907,072 disabling injuries and 24,318 fatalities, creating a cost of 43.15 billion in 1988. The higher estimate accounted for 2,474,430 disabling injuries, at a total cost of 56.02 billion (rounding would give a total of 43.2 billion and 55.9 billion, respectively). [Pg.213]

Each service will be available as a complete program or as separate service components. The complete Stay Fit Program will cost 130, which includes one of each of the three services. Separate component costs are body-fat analysis ( 65), resting metabolic rate ( 60), and nutritional counseling ( 35). The basic Med Check Program will cost 95, which will include an evaluation of the patient s medications (including a written report), patient education for identified... [Pg.376]

Without reference to a particular HTGR, an input parameter of USD 30/MWt-h was used for the cost of nuclear heat was. Electricity cost was set based on a 2008 price of USD 75/MWe-h. The H2A modelling tool, as published, is based on an assumption that all costs and the selling price have the same rate of inflation. However, for the Shaw assessments, energy costs are projected to rise more rapidly than general inflation, and so a modification to the H2A model was been made to add this analysis capability. For the analysis, real escalation, over and above any inflation, is included at 1%/yr over the plant life for the electric power bought or sold. The assumed reactor outlet temperature for evaluating component costs and process efficiencies was 950°C. [Pg.338]

Each component s function (or purpose) is to be measured by an output flow of essergy , such that for any given fixed value of 8, the total annualized component cost f (given by an expression such as... [Pg.242]

As for all case studies presented in this chapter, information on power component costs was drawn from RETScreen database (National Resources Canada, 1998). In more detail for photovoltaic panels a cost of 6750 /kW was used, resulting in a total acquisition cost of 67,500 . A capital cost of 450 /kW was used for the 35-kW diesel generator, which accounts in total for a cost of 15,750 . The total cost of the battery bank was considered equal to 17,600 . Finally, the total cost of the inverters installed in the system was 6700 . Lifetime, O M costs and power... [Pg.127]

Given the current state of knowledge with respect to fuel cell durability, on-board storage systems, and existing component costs, the committee believes that the near-term DOE milestones for FCVs are unrealistically aggressive. [Pg.20]

Example 1 Estimation of fixed-capital investment using ranges of process-plant component costs. Make a study estimate of the fixed-capital investment for a process plant if the purchased-equipment cost is 100,000. Use the ranges of process-plant component cost outlined in Table 4 for a process plant handling both solids and fluids with a high degree of automatic controls and essentially outdoor operation. [Pg.167]

The electrical installation consists of four major components, namely, power wiring, lighting, transformation and service, and instrument and control wiring. Table 9 shows these component costs as ratios of the total electrical cost... [Pg.174]


See other pages where Cost Components is mentioned: [Pg.241]    [Pg.242]    [Pg.242]    [Pg.1829]    [Pg.88]    [Pg.126]    [Pg.306]    [Pg.282]    [Pg.282]    [Pg.283]    [Pg.284]    [Pg.72]    [Pg.327]    [Pg.465]    [Pg.536]    [Pg.867]    [Pg.61]    [Pg.367]    [Pg.36]    [Pg.335]    [Pg.270]    [Pg.38]    [Pg.47]    [Pg.167]    [Pg.182]   
See also in sourсe #XX -- [ Pg.465 ]




SEARCH



Costing components

© 2024 chempedia.info