Action plans can serve as a road map to move your safety program from where it is now to where it should be. An action plan defines what steps should be taken and the order in which tasks should be performed, and it identifies who is responsible for completing each task [5]. The plan must be specific and flexible enough to respond to change as the management systems and program grow and develop [5]. [Pg.88]

A change program, usually associated with an initiative, with a manager, budget, objectives, and schedule. Several projects may support an initiative. Action plans define the goals for the project. Chapter 12... [Pg.436]

In the first stages of the development of an Action plan all control options are considered. In the case of lakes, this process is aided by a PC-based expert system , PACGAP, which looks at the physical and chemical characteristics of the lake to determine the most likely option for control. Once further, more detailed information has been collected on the lake s nutrient inputs and other controlling factors, amore complex interactive model can be used (Phytoplankton Response To Environmental CHange, PROTECH-2) to define the efficacy of proposed control options more accurately. This model is able to predict the development of phytoplankton species populations under different nutrient and stratification regimes. [Pg.40]

Once the options have been clearly defined it will be necessary to carry out a cost-benefit analysis of each option. This has two main objectives. First, the overall cost of the project will need to be assessed to determine whether or not it is financially viable and, second, to ensure that those who will be required to incur expenditure are fully aware of the commitment needed. The financial benefits to users of the waters for recreation, fisheries, navigation, etc., are relatively easy to determine, but monetary valuation of the environmental benefits such as conservation and general amenity will be more difficult to define. As yet this aspect of the cost-benefit analysis has not been fully developed in the UK. Having determined a range of options and costs for eutrophication control in a particular catchment, consultation on the details of the Action plan with all those involved is needed before any plan can be implemented. [Pg.40]

Corrective action, broadly defined, includes not only the process of addressing identified deficiencies, weaknesses, or vulnerabilities, but also the processes for corrective action planning and follow-up. The corrective action process can be summarized as follows. [Pg.127]

The purpose of the Corrective Action Plan is to define the overall activities, schedule, costs, and responsibilities necessary to guide the development and implementation of technological and procedural controls to bring the systems into compliance with Part 11. The plan should identify any existing technological/procedural controls that may be modified or new technological/procedural controls that need to be implemented in order to ensure that the regulatory requirements are completed in a consistent and uniform manner. The remediation action items identified in the Part 11 assessment should be documented in a detailed implementation plan. [Pg.133]

The next step in the business planning process is to define major milestones and an action plan of implementation and operation of the program. This action plan should detail the start and finish dates and list responsible individual(s) for each task necessary to accomplish the objectives of the business plan. The action plan should include periodic monitoring and assessment of the performance (i.e., clinical, financial, or other) of... [Pg.55]

Internal QA audits must be conducted and documented at a defined frequency to ensure overall compliance, control, and effectiveness of the quality elements. Such audits should be conducted by members of the QAU or third-party compliance specialists and the results reported directly to the senior management of the corporation. The senior management should prepare an action plan to address any deficiencies and follow up to confirm adequate implementation. [Pg.135]

Organizations are assembled from diverse human resources to achieve defined missions through orderly action plans. In industry, organizations and their people are generally in perpetual competition with others in their effort to create profit. They strive to find pathways to distinguish themselves from competitors in the expectation of generating opportunities for company and personal growth within the social system. Robert Frost eloquently illuminated opportunities for distinction in his poem The Road Not Taken, which ends ... [Pg.49]

Assignment What truly defines a person s character the most words or actions Plan your response and support your position with specific points and examples from your observations, studies, reading, or personal experiences. [Pg.22]

Develop a corrective action plan Identify all possible solutions. Using brainstorming, correlation analysis, polling, and consensus techniques, prioritize the list of solutions. Perform a barrier analysis, defining driving forces that will help the improvement process to succeed as well as restraining forces that may hold the team back. [Pg.399]

Set timetable for improvement 2. Create multidisciplinary team to address the issue 3. Review the literature and/or published standards 4. Define quality indicators 5. Analyze baseline data 6. Review current practices 7. Perform root cause analysis 8. Create action plan for change... [Pg.211]

Initiate the Incident Action Plan Safety Analysis (HICS Form 261) to document hazards and define mitigation. ... [Pg.151]

During Phase III, the process is monitored for instances of special causes. When special causes cannot be entirely eliminated, an Out-of-Control Action Plan (OCAP) can be developed for routine use by operating personnel.The OCAP comprises three features activators, checkpoints, and terminators. The activators define the conditions that signal when the OCAP must be activated, and the control chart usually performs this function. The checkpoints instruct the operator to investigate specific items as possible special causes for the out-of-control condition. Once a checkpoint has been identified as a special cause, a terminator caih for a specific action to be applied to resolve the problem. [Pg.3503]

Written in advance, the test plan defines all test procedures with their pass/fail criteria, expected test results, test tasks, test environment for equipment and computers, criteria for acceptance and release to manufacturing, and the persons responsible for conducting these tests. The test plan also specifies those functions excluded from testing, if any. Individual tasks cover functional testing, simulation of incomplete functions as integration proceeds, mathematical proof of results, records of discrepancies, classification of defects and corrective actions. [Pg.28]

Most contingency plans define the structure of the response organization so that roles and command sequences are fully understood before any incident occurs. The On-Scene Commander (OSC) is the head of the response effort and should be experienced in oil spill response operations. The OSC is responsible for making all major decisions on actions taken. This person ensures that the various aspects of the operation are coordinated and sequenced and that a good communications system is in place. [Pg.33]

Formal initiation of a failure investigation should be based on a well-controlled process defined by SOP or company guidelines. This requires documentation using worksheets or forms to be completed manually or electronically using LIMS or electronic lab notebooks. These forms should contain a section for description of the occurred failure and a preliminary action plan. [Pg.282]

The programme of the FP5 Key Action on Water was based on a broad consultation with the stakeholders to define action plans for EU collaborative research, and was intended to promote an increased participation of technology providers and end user communities. [Pg.446]

The EC has developed action plans for the management of waste and has defined a basic hierarchy or ladder . [Pg.507]

Implement Action Plan. An action plan is necessary to identify how the quality-improvement solution will be implemented. This includes defining the different tasks to be performed, the order in which they will be addressed, who will perform each task, and how this improvement will be monitored. Appropriate resources must again be identified and a timetable must be developed prior to implementation. Once the action plan is implemented, the indicators are monitored and evaluated to verify appropriate changes in the process. New indicators and thresholds may need to be developed to monitor the solution. [Pg.807]

Quality-Improvement Process. If the threshold is not met, a trend is identified, or a pattern is observed, a quality-improvement opportunity exists. A team could be formed to review the indicator, examine the process that the indicator measured, define the problem encountered, identify ways to solve the problem, and select a solution. An action plan will then be developed to implement this solution. [Pg.808]

I approve the Management of Organizational Change plan defined below (or attached in lieu of). All action items have been assigned and are being tracked within a management system to ensure completion. [Pg.206]

The EU classification defines the risk phrase Toxic by inhalation, in contact with skin and if swallowed. Causes bums. Limited evidence of a carcinogenic effect. May cause sensitisation by skin contact. [R 23l24l25-34-40-43] — Defined in Annex II of EU Directive 67/548/EEC as amended by EU Directive 200I/59/EC. Formaldehyde was included in the substance evaluation list in 2013. On February 29, 2012, ECHA (the European Chemicals Agency) published the Community Rolling Action Plan (CoRAP) in which formaldehyde was included. CoRAP is a list of chemical substances that need to be evaluated with the aim to define whether policy measures are required to ensure an adequate management of exposure (for instance for formaldehyde) by workers and consumers. [Pg.5]


See other pages where Action plan, defined is mentioned: [Pg.146]    [Pg.545]    [Pg.146]    [Pg.545]    [Pg.378]    [Pg.40]    [Pg.26]    [Pg.119]    [Pg.194]    [Pg.60]    [Pg.12]    [Pg.409]    [Pg.219]    [Pg.2298]    [Pg.1486]    [Pg.58]    [Pg.165]    [Pg.18]    [Pg.235]    [Pg.215]    [Pg.12]    [Pg.313]    [Pg.48]    [Pg.805]    [Pg.49]   