Work team leader

Root cause 1 Supervision was less than adequate. The team leader should have stayed with his colleague and checked the work as he had responsibility for the team... [Pg.299]

Different requirements may be filled by a single team member. One member of the team should be appointed as the team leader and the team should agree about the division of other responsibilities. The team leader should be given clear instructions on the scope of work for the team and the schedule within which they are working. This will most likely be achieved through the application of Quality Management analysis techniques. Staff can be involved in more than one team, but avoid having one person lead more... [Pg.96]

Al Bickman, Osprey River site manager, expects the work on the pilot study to start next month and be completed within 12 weeks. He has established a local team of managers, engineers, and operators to work with the integration team. Most of this team will be committed for up to half of their time. The team leader will be dedicated to the project. [Pg.119]

Needs and objectives might emerge in various ways first, the mentee might have worked them out as a result of reflecting upon current performance secondly, the mentee s line manager or team leader might have been substantially involved in... [Pg.172]

The clean-out operation, which had not been done in the previous 30 years, was not subjected to a hazard assessment to devise a safe system of work, and there were defects in the planning of and permit-to-work system of the operation. The task was largely handled locally with minimal reference to senior management and with lack of formal procedures, although such procedures existed for cleaning other still bases on the site. The permits were issued by a team leader who had not worked on the Meissner plant for 10 years prior to his appointment on September 7. At 10 15 a.m., he made out a permit for a fitter to remove the manlid. The fitter signed on about 11 10 a.m. and shortly after went to lunch. Operatives who were standing by offered to remove the manlid and the same team leader made out a permit for them to do so. When the fitter returned from lunch, it was realized that the still base inlet had not been isolated and a further permit was issued for this to be done. [Pg.165]

External resources may he needed if the incident investigation work exceeds site capahilities. These resources could include corporate personnel or experts from outside the company. (The team leader may also he external if the incident is major since the leader s independence sets the tone for the investigation.) Company business unit leaders should confer with the team leader to determine whether external assistance is recommended. Factors to consider include significant offsite consequences such as environmental impact or product quality concerns. A team of trained specialists should formally investigate any process incident that could significantly affect the business. At the lower end of the scale, if a near miss or minor incident occurs that has no potential for significant consequences, local supervision or front-line personnel normally may perform the investigation without outside assistance. [Pg.106]

Promotion Seek promotion to team leader through hard work, night classes, and pursuit of excellence in personal and team performance. 12/2007... [Pg.40]

This book is intended for a broad audience, from environmental specialists working already in this field to newcomers who want to learn more about this issue. I would like to thank all the authors for their time and efforts in preparing their corresponding chapters, as well as my team leaders and I would also like to thank my team leaders and my co-workers for creating a motivating work environment, which allowed this project to come to life. [Pg.385]

Study Team Composition. HAZOP study is a team effort. The team consists of the leader, a scribe and working team members. The ideal size seems to be 6-7 (including the leader and scribe). The... [Pg.324]

A pharmaceutical company requires a postgraduate chemist in order to boost the level of synthetic chemistry in an R D team working on drugs for use in a particular therapeutic area. After a few years in this role the person will be expected to become a team leader and then possibly move into R D line management. [Pg.32]

A Preliminary Report is usually provided by the Team Leader to the project manager. These are usually issued immediately after the study sessions but no later than two working days of the conclusion of the review meetings. The report should be labeled "preliminary" and is considered a level "A" revision. [Pg.62]

The Final Report is to be provided by the Team Leader to the Project Manager. It should be issued within ten working days of receiving all comments on the Draft Report The report should be labeled "final and is considered a level "1" revision. [Pg.63]


See other pages where Work team leader is mentioned: [Pg.29]    [Pg.37]    [Pg.232]    [Pg.229]    [Pg.295]    [Pg.201]    [Pg.396]    [Pg.61]    [Pg.166]    [Pg.103]    [Pg.110]    [Pg.120]    [Pg.121]    [Pg.48]    [Pg.8]    [Pg.87]    [Pg.190]    [Pg.160]    [Pg.186]    [Pg.33]    [Pg.569]    [Pg.158]    [Pg.29]    [Pg.31]    [Pg.436]    [Pg.503]    [Pg.325]    [Pg.34]    [Pg.48]    [Pg.51]    [Pg.51]    [Pg.67]    [Pg.85]    [Pg.71]    [Pg.71]    [Pg.121]    [Pg.122]   