Small construction sites

This must be discussed, decided and documented before the site is opened. Some or all of the following approaches can be used to simplify structures and procedures  [Pg.33]

Integrate owner and EPCM contractor site management. Reduce the number of construction contractors, and combine related disciplines into one contract, mechanical and piping, or electrical and instrumentation and control, for example. [Pg.33]

Include in the construction contracts procurement and warehousing of material, pipes and fittings, or electric cables, for example. [Pg.33]

Most important of all is that senior management of all parties on site are motivated, believe in the validity and relevance of the simplified quality management system put in place, want to make it work and are able to transmit their commitment to their staff at all levels. [Pg.34]

This chapter examines how the EPCM contractor can organize its task on site, first of all in creating its quality plan and then in determining the composition of the site team. The attributes of key members of staff, whose actions and attitudes are crucial for attaining quality objectives, are then evoked, followed by a study of the division of responsibilities for quality control. [Pg.35]


A determination that stormwater controls are not necessary based on either (A) Total Maximum Daily Load (TMDL) approved or established by ERA that addresses the pollutant(s) of concern for construction activities or (B) For non-impaired waters that do not require TMDLs, an equivalent analysis that determines allocations for small construction sites for the pollutant(s) of concern or that determines that such allocations are not needed to protect water quality based on consideration of existing in-stream concentrations, expected growth in pollutant contributions from all soruces, and a margin of safety. [Pg.448]

Chapter 3 focuses on the site and the role of the various actors present, whose relationships are illustrated in system terms. The sharing of responsibilities for attaining quality is presented in the form of a matrix. Then plant extensions and modifications are discussed as well as adapting quality management principles to small construction sites. [Pg.222]

HSG 130 Health and safety for small construction sites 1995 (ISBN 0 7176 0806 9)... [Pg.202]

Large-scale models, to a scale of at least 1 30, are normally made for major projects. These models are used for piping design and to decide the detailed arrangement of small items of equipment, such as valves, instruments and sample points. Piping isometric diagrams are taken from the finished models. The models are also useful on the construction site, and for operator training. Proprietary kits of parts are available for the construction of plant models. [Pg.898]

Ambros could not have failed to note the increase in population No, Counselor, the last visit must have been the year before, 1941. Again, Dr. ter Meer was along. Snow was on the ground.. . . No, it was a summer day.. . . Anyway, it was some day before or after Christmas. The inmates were out in their shirt sleeves, arms bronzed by the sun. There could not have been more than 6000 inmates altogether. Ambros saw a small crematorium at the entrance, but it was not operating, and "I was told that if anyone of these 6000 human beings should happen to die, he would be cremated there. That was all." The camps were south of the construction site, south of the town, so he and Dr. ter Meer left the camps and walked north. [Pg.184]

Workers at factories, storage facilities, construction sites, and at small- and medium-sized enterprises are potentially exposed to industrial chemical hazards. The elements common to workplace hazard communications systems include labels, MSDS/SDS, and training. [Pg.509]

In Times Beach, Missouri, waste oil from 2,4,5-TCP/HCP manufacture, contaminated with 2,3,7,8-TCDD, was used to control dust on roads. The result was the well-known government buy-out of the town. Use of waste oil at several Missouri horse arenas resulted in acute human health effects and the death of sixty-five horses and several small animals. Subsequent use of the horse arena materials as fill at building construction sites resulted in further cleanup problems. [Pg.35]

The non-linear isobutane part-skeleton of three construction sites () each three carbons from the other has been omitted. The possible overlap of reactive strands is very small. Also omitted are three-construction sites linked in a ring in the synthon, which are cyclic forms of the patterns in Fig. 3. These are somewhat more restrictive than their linear counterparts in Fig. 3 but not significantly different. [Pg.171]

As shown in Table 3, the relocated natural calcium binding sites have small U(p) values (<25). They all have the smallest U(p) values among all the constructed sites for each protein. Therefore, the U(p) number can be used to rank the constructed potential sites according to their deviations from the target site. Our parameters used to describe the geometry of calcium binding sites allow us to accurately identify natural calcium binding sites. [Pg.135]

The context for this book is large UK construction sites (over 15 million in value) operated by large main contractors (found within the top 30 contractors in terms of annual work won by value in the UK), rather than those operated by small-to-medium sized enterprises (SMEs) or micro operations and sole traders. However, smaller industry organisations inevitably participate in work on large sites as they operate as subcontractors within industry supply chains. Research has shown that subcontractors take their ideas of safety with them when they move from project to project (Aboagye-Nimo eta/. 2012), and therefore SMEs and even micro-SMEs play a considerable part in helping to create and perpetuate what safety is on large construction sites. [Pg.2]

GPS combined with astronomical azimuth and latitude determination suffered of the (small) size of the data base as well. In addition, because of unfavourable weather conditions no reliable values of latitudes and of the derived deflections of the vertical in south/north direction could be obtained. Note that the construction site Sjaelland/ Sprogp has a south/north extension which is approximately 30% of its size in east/west direction. Therefore, an error in affects the calculated geoid height difference between Sjaelland and Sprog0 with about 30% of the magnitude of an error in rj. This may appear small, but it is definitly not negligible. [Pg.301]

Combustible materials are a fire hazard at any construction site. Tobacco products, portable heating equipment, small engine equipment, and welding equipment pose the greatest danger. [Pg.813]

A guide for small contractors. Site safety and concrete construction... [Pg.723]

The Package-Reactor is an ultra small reactor with small initial capital costs favourable to a reduction of the investment burden and risk. Simple and sound safety features could also be helpful for public acceptance around the construction sites. The power scale is suitable for energy demand in remote regions where it is difficult to construct long-distance power transmission and distribution facilities. [Pg.317]

People who work by themselves without close or direct supervision are found in many work situations. In some cases they are the sole occupant of small workshops or work position they may work in remote sections of a large construction site they may work out of normal... [Pg.90]

Another of these pieces of plant will be discussed in a little more detail here (see Figure 13.12). The small dumper truck is widely used on all sizes of construction site. Compact dumper trucks are involved in about... [Pg.224]

Subsection 611-03 recognises that many installations do not have isolating switches and are fed from the supply company s combined cut-out, neutral link and sealing box on the end of the service cable, so in such cases electrical maintenance is restricted to qualified persons. The restriction does not apply to relamping if an isolating switch is available. Supplies are sometimes taken from street furniture to feed temporary installations such as market stalls, Christmas decorative street lighting and small roadworks. Subsection 611-06 requires no impairment of the safety of the permanent installation so it must not be overloaded and the connection must be safe. The temporary installation should comply generally with section 604 for construction sites. [Pg.162]

The stakeholders did not agree on who are the winners and who are the losers of the NORSOK process, but a majority of the respondents seemed to agree on that the Norwegian state had been the great winner but also the oil companies. The results for the main contractors were more disputed, whereas almost everyone agreed that losers were the small sub-contractors and especially the engineers and workers at construction sites had suffered from extreme cost and time pressure. [Pg.69]


See other pages where Small construction sites is mentioned: [Pg.33]    [Pg.44]    [Pg.33]    [Pg.44]    [Pg.176]    [Pg.44]    [Pg.197]    [Pg.350]    [Pg.51]    [Pg.1100]    [Pg.31]    [Pg.245]    [Pg.258]    [Pg.196]    [Pg.100]    [Pg.10]    [Pg.78]    [Pg.766]    [Pg.118]    [Pg.155]    [Pg.391]    [Pg.437]    [Pg.39]    [Pg.253]    [Pg.405]    [Pg.447]    [Pg.360]    [Pg.144]    [Pg.349]    [Pg.24]   
See also in sourсe #XX -- [ Pg.33 ]




SEARCH



Construction sites

© 2024 chempedia.info