Have external mitigations which are effective and demonstrable and checked by regular site visits/audits... [Pg.91]

This annex of the Rules contains a flowchart identifying the key stages in the audit process from the initial request for certification through to issue of the certificate. Pre-audit is not a documentation audit. Supplier must provide all required data prior to site visit. [Pg.75]

Prior to a site visit, assess the vendor remotely through product literature and submission of a preaudit questionnaire. When a vendor site audit becomes necessary, plan the audit s scope and focus and identify the audit team. Audit team members should include user group lead, information services groups (IT/IS/MIS), compliance, purchasing, and validation personnel. [Pg.225]

An audit report will be produced for each supplier, documenting the positive and negative observations made during the assessment of the response to the postal audit questionnaire and/or the site audit. All corrective actions must be followed up, possibly requiring further site visits, in order to ensure that nonconformance issues have been appropriately addressed in a timely manner to minimize the impact on project success. [Pg.722]

Within OECD, the inspectors are also undertaking mutual joint visits to review all the national GLP-monitoring programs. Each country is visited by a team, comprising inspectors of three other countries, and the program, inspections, and on-site study audits done by the country which is visited are evaluated and discussed among the inspectors. [Pg.2945]

Audits are periodic independent surveys, assessments, or site visits to ensure that the QAP is appropriate and that radioanalytical chemistry laboratory operation follows the QAP. Generally, a client or accreditation program sends a crew of audit specialists, but internal audits also are performed. [Pg.236]

The OIVV team prepares phase reports and submits to regulatory authority for reference after accomplishing each phase. The report covers document review reports, site visit reports, thread audit reports, and anomaly reports completed by OIVV team during each phase. Also, all anomaly items are... [Pg.87]

Managers should start practicing management by walkabout and visit their respective work areas. They must speak to their anployees, who are vital sources of information and are often overlooked in a culture intervention. Employees love to talk about safety and can tell more about the current state of safety in the plant than the audit will. The scheduled site visits and safety walkabouts should be written into the key performance areas of managers at all levels. This would be part of assigning safety responsibility, as discussed. [Pg.133]

Hampshire County Council is one authority that has adopted the Standard with some variations. For example, the County Council regularly carries out Feasibility Stage Road Safety Audits on large schemes for small schemes the site visit may be carried out by one auditor at Stage 3 the audit team assesses the need to carry out a night-time visit. [Pg.14]

Delegates on a site visit during a Road Safety Audit training course... [Pg.19]

A site visit should be carried out as part of each Stage of the Road Safety Audit. [Pg.19]

It is very important that a comprehensive site visit is carried out not only of the scheme itself but also of the surrounding area. Particular attention needs to be given to the tie-ins between the proposed scheme and the existing road network. HD 19/03 specifies that the whole Audit Team should visit the site together at all Road Safety Audit stages. Some local authorities relax these requirements by having one auditor visiting the site on smaller schemes. [Pg.20]

The Road Safety Audit Team, together with advisors, visits the site during daylight. The site visit should extend beyond the limits of the scheme to cover any issues with tie-ins. [Pg.25]

The Road Safety Audit Team visits the site during darkness. One Road Safety Audit Team member produces a draft audit report and circulates to all present at the site visit. [Pg.25]

Performance review Based on databases Comprehensive - internal review, self-evaluation report, benchmarking, site visit, and audit... [Pg.51]

To get where you want to go, you must know where you are starting from. A variety of self-audit mechanisms can be employed to compare your site processes with other recognized models of excellence such as VPP sites. Visiting other sites to gain firsthand information is also invaluable [7]. [Pg.91]

The audit should be based on document review, selected interviews, and observations on operations during site visits. [Pg.325]

As in the case of aii active monitoring information, sources for the audit are likely to come from talking to people, undertaking site visits to observe physical conditions activities, etc. and the checking of documents and records... [Pg.277]

For those chapters proposing typical procedures with model forms concerning responsibilities on site, supplier site visits, quality plans and records, engineering queries, incoming inspection and maintenance, nonconformities, audits, management reviews and construction completion and turnover, the forms concerned can be downloaded from the Wiley-Blackwell website www.blackwellpublishing.com/noble. They can serve as a basis for the reader to create his/her own forms adapted to the needs of a specific project. [Pg.224]

Principal Address — Enter the address where the company s safety records are maintained. FMCSA will use this address for on-site visits to Motor Carriers for the purpose of conducting safety audits, compliance reviews, and other activities. For this reason, do not enter a P.O. Box as the Principal Address or processing of the company s application will be delayed. [Pg.42]

At Stage 3, it is recognised as good practice for the Road Safety Audit Team to be accompanied by a pohce officer and a representative of the organisation that will be responsible for future maintenance. These people are seen as advisors, and are not part of the Road Safety Audit Team. It is the responsibility of the Road Safety Audit Team Leader to invite these parties to the site visit. [Pg.23]


See other pages where Site visit audits is mentioned: [Pg.372]    [Pg.245]    [Pg.102]    [Pg.162]    [Pg.156]    [Pg.237]    [Pg.238]    [Pg.196]    [Pg.88]    [Pg.89]    [Pg.178]    [Pg.492]    [Pg.23]    [Pg.26]    [Pg.26]    [Pg.99]    [Pg.21]    [Pg.23]    [Pg.24]   
See also in sourсe #XX -- [ Pg.116 ]