Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Service requirements

Multielevation piperacks are usually needed to handle all the required services for piping, electrical, utilities, and instmmentation. The two-level rack is one of the most common but three-level ones are also used. The utility lines are usually mn in the upper level and the process lines in the lower levels. The larger-diameter lines are located to the outside of the rack to be closest to the column supports. Access platforms are required at the battery limit to provide operators access to the block valves and blinds. If long mns of hot pipe are required, a portion of the pipe rack needs to be dedicated to an expansion loop. A horizontal space in the piperack is provided for a set of lines to be flat-turned into a set of expansion loops with the large pipes located on the outside. AH of the pipe turns are in the same horizontal plane, which is an exception to normal piping practice. A flat turn takes up and blocks space for other pipes. Flat turns are generally only made from the outside of the rack to minimize this blockage. [Pg.80]

The PEEK resia is marketed as aeat or filled pellets for iajectioa mol ding, as powder for coatiags, or as preimpregaated fiber sheet and tapes. Apphcations iaclude parts that are exposed to high temperature, radiation, or aggressive chemical environments. Aerospace and military uses are prominent. At present, polyamideimide (PAl) resia and poly(arylene sulfides) are the main competitors for apphcations requiring service temperatures of 280°C. At lower temperatures, polyethersulfones, amorphous nylons, and polyetherimides (PEI) can be considered. [Pg.275]

In view of their easy adaptability, they are manufactured in standard sizes suitable for common types of load applications. They are therefore available on short deliveries, in smaller ranges, say, from I kW to 200 kW. They can be selected for the required service conditions, as a motor is selected to suit a particular load requirement from the available sizes of couplings. [Pg.199]

A blow-moulded container, cylindrical in shape but with one spherical end, is prepared from the polysulphone whose creep curves at 20°C are illustrated in Figure 9.9. The cylindrical part of the container has an outside diameter of 200 mm and is required to withstand a constant internal pressure of 7 MPa at 20°C. It is estimated that the required service lifetime of the part will be one year and the maximum allowable strain is 2%. What will be the minimum wall thickness for satisfactory operation ... [Pg.201]

Mass intensity. The idea behind focusing on the mass intensity of the product or service is dematerialisation using less physical material to produce the required service. [Pg.61]

In an Open collaboration, a requirement expressed as an invariant or joint action can span a group of objects a collaboration is a design for this requirement. Services (infrastructure services—transactions... [Pg.199]

After inspection and completion of required service, determine capacity of the cooling system from a cooling system protection chart or car owner s manual. A 50% concentration (—34°F [—37°C] freezing protection) is generally recommended. [Pg.14]

The required service factor is an important specification. The service factor is defined as the ratio of calculated basic horsepower to the applied horsepower. The service factor can be as high as 2 for spiral-bevel reducers, but with continuous service this factor could be as low as 1.25 to have a good reducer life. [Pg.167]

In the area of fuel cells, reliability and availability have much improved. Recent U.S. military experience with phosphoric acid fuel cells found that the mean time between failure (MTBF) was almost 1,800 h and the availability was 67%. This is comparable with the MTBF service intervals for diesel generators. These fuel cells also favorably compare with the service interval needed for a typical gas turbine generation set. Still, much more development is required to obtain a commercially viable product. Today, the typical fuel cell system still requires servicing every 3-4 days to replace its scrubber packs. [Pg.49]

The cost of running an ICP-MS is quite high. Ar is expensive, especially so because it is used in large volumes. Moreover, spare parts like skimmer and sampler cones, torches, and detectors have a limited lifetime. ICP-AES and ICP-MS have similar Ar consumptions. On the other hand, the former technique is somewhat cheaper to mn since the replacement rate of consumables is lower. The different forms of AAS require various amounts of different gases. These are, however, far less than the volumes consumed by the competing techniques. The cost for other items such as graphite tubes and cones is fairly moderate. All three techniques require service at regular intervals, which is in itself rather expensive. [Pg.76]

A company must purchase one reactor to be used in an overall operation. Four reactors have been designed, all of which are equally capable of giving the required service. The following data apply to the four designs ... [Pg.337]

New owner conduct Supplier Audit on divesting organization as external service provider Formal contract of supply required Service Level Agreement established for maintenance and inspection support... [Pg.319]

Blain P, Lightfoot N, Bannister B. Practicalities of warfare required service personnel to be vaccinated against anthrax. BMJ 1998 317(7165) 1077-8. [Pg.260]

Drug information practitioners in institutional and academic environments may work within a single institution or may be involved in a hospital system that requires services to multiple institutions, perhaps over a wide geographic region. [Pg.291]

Due to the significant reduction in ionizable salt concentrations, RO systems are often used as a pretreatment method before a DI system. An RO before a DI reduces the size of the deionizer, reduces the consumption of regenerate chemicals and may reduce the length of the deionizer required service cycle. [Pg.603]

Once the fluoropolymer sheet, film, etc., has been etched, it is an adherable surface. The choice of adhesive depends on the required service conditions and, to some extent, the substrate. Some of the considerations in the selection of adhesive include chemical resistance, flexibility, and temperature resistance. [Pg.256]

Erected cost of bare shell including foundation (add required services and equipment costs from Sec. H),... [Pg.336]


See other pages where Service requirements is mentioned: [Pg.355]    [Pg.54]    [Pg.161]    [Pg.226]    [Pg.797]    [Pg.261]    [Pg.89]    [Pg.127]    [Pg.194]    [Pg.43]    [Pg.224]    [Pg.70]    [Pg.562]    [Pg.255]    [Pg.80]    [Pg.54]    [Pg.68]    [Pg.187]    [Pg.80]    [Pg.78]    [Pg.80]    [Pg.80]    [Pg.310]    [Pg.96]    [Pg.348]    [Pg.226]    [Pg.61]    [Pg.462]    [Pg.1727]   
See also in sourсe #XX -- [ Pg.128 , Pg.168 ]




SEARCH



Customer service requirements

Customer service requirements communicating

In-service requirements of advanced fibre-reinforced polymer (FRP) composites for sustainable energy applications

Joint Services Operational Requirements for Chemical Agent Detectors

Reporting that services meet specified requirements

Service corridors requirements

Servicing requirements for

Supplemental Requirements for Equipment in Sour Service

The Service Requirements

United States Postal Service Mailing Requirements

© 2024 chempedia.info