Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Rebuilding

The analysis software rebuild a C-scan of every three reflectors and for every 160 acoustic apertures, and plots (see figure 5) ... [Pg.826]

Price. The 1993 U.S. price for fluorine in cylinders was 109/kg for 2.2 kg and 260/kg for 0.7 kg cylinders. The price in large volumes is determined by (/) the price of hydrofluoric acid (2) power costs, ca 4.5 kWh electricity is required for each kilogram of fluorine produced (J) labor costs (4) costs to maintain and rebuild cells and (5) amortization of fixed capital. Fluorine production is highly capital intense. In addition, purification, compression, packaging, and distribution in cylinders increase the cost significantly. [Pg.130]

Stainless steel develops a passive protective layer (<5-nm thick) of chromium oxide [1118-57-3] which must be maintained or permitted to rebuild after it is removed by product flow or cleaning. The passive layer may be removed by electric current flow across the surface as a result of dissinulat metals being in contact. The creation of an electrolytic cell with subsequent current flow and corrosion has to be avoided in constmction. Corrosion may occur in welds, between dissimilar materials, at points under stress, and in places where the passive layer is removed it may be caused by food material, residues, cleaning solutions, and bmshes on material surfaces (see CORROSION AND CORROSION CONTROL). [Pg.361]

Worldwide capacity for ethylene oxide should be boosted by ca 2 x 10 t/yr to a total of 11.6 x 10 t/yr by 1995. Projects underway are Hsted ia Table 13. Additions have been aimounced by Union Carbide ia the United States and Canada, Formosa Plastics and Shell ia the United States, BASF ia Belgium (rebuild of an existiag unit), and SABIC ia Saudi Arabia (100,101). Expansions have also been aimounced ia South Korea and India, and may occur ia other countries as well. [Pg.463]

The phenomenon of a switching surge is related to the performance of the switching device, i.e. its speed of operation and ability to quickly rebuild its dielectric strength (deionization of the arc phisma) between the parting contacts after a current zero. [Pg.629]

Vane Pass Syndrome Design / Maintenance Oversized impeller, inadequate aftermarket parts, repair or rebuild with incorrect specifications and measurements. [Pg.38]

The Cartridge Concept - has every component part of the sealing system in one unit. They re easier and faster to install and don t require total pump teardown. Most come with additional control ports and rebuild kits. [Pg.214]

The main plant s manufaeturing faeility was also responsible for produeing the new diffuser and first- and seeond-stage stator assemblies, in addition to many other miseellaneous parts. The owner/user s spare rotor was used as part of the rebuild. Complete disassembly, dimensional, and penetrant inspeetions of the rotor were eondueted. New blades were installed in the dises. Final qualifieations of the rotor ineluded rotor stud streteh tests, balaneing, and meehanieal and elee-trieal runout eheeks. [Pg.210]

Depreciation. This is a noncash cost that accumulates money to rebuild the facilities after the project life is over. There are usually two depreciation rates. One is the corporation s book depreciation, which reflects the expected operating life of the project. The other is the tax depreciation, which is usually the maximum rate allowed by tax laws. To be correct, the tax depreciation should now be called Accelerated Capital Cost Recovery System (ACRS). [Pg.241]

Recover Database restructures and re-indexes the data. The rebuild process recovers al I key indexes and cross references. [Pg.141]

Hoechst Celanese officials said it was too early to decide whether to rebuild the butane reactor, install a newer methanol-to-acetic acid process, or start up a standby acetic acid facility at Hay City, TX, to replace the idled 350-million-lb per year acetic acid plant. [Pg.257]

Prior to commencement of production, design changes do not require any modification documentation, the design changes being incorporated in prototypes by rework or rebuild. However, when product is in production, instructions will need to be provided so that the modification can be embodied in the product. These modification instructions should detail ... [Pg.272]

There are few shortcuts. If you want a powerful electric motor, it is going to have to he large and entail an extensive amount of copper windings. That is why it is much more cost-effective to rebuild many large (more than 100 horsepower) industrial motors than to replace them with new motors. [Pg.403]

The policy cover may be extended to include damage to assets from extra perils if the necessary additional premium is paid. These include storm damage, floodwater, burst water pipes or tanks, aircraft, riot, malicious damage or impact by mechanical vehicles. It is also possible to include an item to cover architects , surveyors and consultants fees and legal fees all incurred in the reinstatement of the property insured, as well as a sum to cover the costs of removing debris from the site before rebuilding can start. [Pg.163]

Predictive maintenance was shown to reduce the actual time required to repair or rebuild plant equipment. The average improvement in mean-time-to-repair, MTTR, was a reduction of 60 per cent. To determine the average improvement, actual repair times before the predictive maintenance program were compared to the actual time... [Pg.796]

A side benefit of predictive maintenance is the automatic ability to monitor the mean-time-between-failures, MTBF. This data provides the means to determine the most cost-effective time to replace machinery rather than continue to absorb high maintenance costs. The MTBF of plant equipment is reduced each time a major repair or rebuild occurs. Predictive maintenance will automatically display the reduction of MTBF over the life of the machine. When the MTBF reaches the point that continued operation and maintenance costs exceed replacement cost, the machine should be replaced. [Pg.797]

Several other benefits can be derived from a viable predictive maintenance management program verification of new equipment condition, verification of repairs and rebuild work and product quality improvement. [Pg.797]

The membrane tubules and lamellae of the endoplasmic reticulum (ER) are extended in the cell with the use of MTs and actin filaments. Kinesin motors are required for stretching out the ER, whereas depolymerization of microtubules causes the retraction of the ER to the cell centre in an actin-dependent manner. Newly synthesized proteins in the ER are moved by dynein motors along MTs to the Golgi complex (GC), where they are modified and packaged. The resulting vesicles move along the MTs to the cell periphery transported by kinesin motors. MTs determine the shape and the position also of the GC. Their depolymerization causes the fragmentation and dispersal of the GC. Dynein motors are required to rebuild the GC. [Pg.415]

A good estimate is that each of these areas comprise 25% of the capital cost. Membrane replacement and a pump rebuild may be required after 5 to 6 years, so some provision for these costs should clearly be made because they are not insubstantial. [Pg.361]

The change in surface wettability (measured by the contact angle) with concentration for the three surfactants is plotted in Fig. 2.54 (Zhang and Manglik 2005). The contact angle reaches a lower plateau around the CMC where bilayers start to form on the surface. Wettability of non-ionic surfactants in aqueous solutions shows that the contact angle data attains a constant value much below CMC. Direct interactions of their polar chain are generally weak in non-ionics, and it is possible for them to build and rebuild adsorption layers below CMC. The reduced contact an-... [Pg.67]


See other pages where Rebuilding is mentioned: [Pg.584]    [Pg.121]    [Pg.459]    [Pg.459]    [Pg.502]    [Pg.21]    [Pg.361]    [Pg.351]    [Pg.7]    [Pg.40]    [Pg.449]    [Pg.399]    [Pg.137]    [Pg.212]    [Pg.259]    [Pg.496]    [Pg.422]    [Pg.1144]    [Pg.269]    [Pg.462]    [Pg.344]    [Pg.404]    [Pg.1087]    [Pg.797]    [Pg.797]    [Pg.829]    [Pg.627]    [Pg.231]    [Pg.88]    [Pg.28]    [Pg.386]   
See also in sourсe #XX -- [ Pg.607 ]




SEARCH



Automotive Parts Rebuilders Association

Phase rebuilding

Phase rebuilding mechanism

Pulling the Pieces Together to Build or Rebuild a Safety Program

REPAIR AND REGENERATION REBUILDING, IN ADDITION TO PRESERVING, THE DAMAGED MYOCARDIUM

Rebuilding Hydrocarbons

Rebuilding Worn Screws and Barrels

Rebuilding after shear

Rebuilding of Extruder Barrels

Rebuilding the model at atomic resolution

Rebuilding within the Kaiser Wilhelm Society

Screw rebuilding and repair

Surface rebuilding

Workshop 2.1 -Rebuild Model Using Back-blending Procedure

© 2024 chempedia.info