Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Procedure management

Create project management procedures (where applicable) that define interfaces with line departments, customers, and suppliers. [Pg.153]

Process design and review procedures Project management procedures... [Pg.2]

Manual of Policies and Procedures (MaPP6010.2). Review management. Procedures for tracking and reviewing phase 4 commitments, URL http //www.fda.-gov/cder/mapp/6010-2.pdf, accessed 3-10-2001. [Pg.792]

ISO 9000 requires what is called a third party assessment but involves developing first and second party strategies. First party refers to the supplier company that requests ISO 9000 certification. Second party refers to the customer whose needs have been met by the first party through the use of quality management procedures achieved by ISO 9000 compliance. Third party refers to an outside reviewer who certifies that the first party has satisfied ISO 9000 procedures. [Pg.701]

There was a disregard for the need to observe proper laboratory, animal care, and data management procedures. [Pg.13]

Future development efforts in source characterization should 1) develop new source sampling methods including tethered balloon and ground based sampling 2) standardize data reporting and management procedures and store validated data in a central data base and 3) create a chemical component analysis protocol to obtain maximum information from each source test. [Pg.101]

Registration. The registration of a chemical substance is the set of data management procedures which enables all information relating to a specific chemical substance to be linked together. The registration procedure is concerned with determining if a potentially new substance is equivalent to a substance already on file or if it is new, in which case the substance is added to the file. [Pg.134]

Setting up and maintaining adequate records and control procedures. Delegated responsibilities should be established, and lines of communication and management procedures clearly identified in writing. Proper records should be maintained in order to identify what... [Pg.320]

The overall project itself requires formally structured planning and control in addition to the validation plans for the computerized operation. To provide this, a project and quality plan from the pharmaceutical manufacturer (or its nominated main contractor) is normally developed as a separate and complimentary document and needs to overview all activities, resources, standards, and procedures required for the project. The plan should define project-execution procedures, quality management procedures, engineering standards, project program, and project organization (with authorities and reporting responsibilities), and reference the project validation plan. There are instances in which the project and quality plan and the project validation plan can be combined into one document. [Pg.582]

System management procedural controls verified and approved as-built... [Pg.69]

Change management procedural control must be in place when the validated system is released for use. These controls must address the identification and specification of the change. [Pg.98]

In any case, the software supplier or the developer must follow a documented change management procedure, so that changes to source code are specified and documented. [Pg.119]

A management procedure for global model precision was proposed by Kondratyev, Krapivin, and Pshenin (2000). The main idea behind this procedure consists in the use of evolutionary modeling for the synthesis of a combined model whose structure is subject to adaptation against the background of the history of a system of the biosphere and climate components. The form of such a synthesis depends on the spatiotemporal completeness of the global database. [Pg.512]

In a series of articles in 2001, Butler, Samdani, and McNish described the increase in LBOs in the chemical industry over the second half of the 1990s (Butler, P. Samdani, G. S. et al.). They labeled this phenomenon the Alchemy of Leveraged Buyouts and predicted a natural convergence between traditional chemical corporations and their new financial competitors in terms of management procedures and skills as well as how they created value. [Pg.403]

As described below, state scrap tire laws may include (1) funding sources (2) mandates to clean up tire dumps (3) scrap tire management procedures including stockpile, processor, and hauler regulations (4) market development incentives and (5) regulations regarding landfilling of tires. [Pg.86]

Ensure formalized change management procedures are in place during the submission process. [Pg.38]

Quality assurance processes that will be implemented to ensure that all data management procedures are compliant with regulatory governance. [Pg.75]

Not all factors that influence the reliability and representativeness of data are measurable. Those that are measurable will usually be found if proper data-handling processes are followed. However, there are many immeasurable factors that can severely bias data and that are not readily identified, even by good data-handling and data management procedures. Some of these nonmeasurable errors are ... [Pg.24]

Besides this quantitative problem (which may seem a luxury problem to many other industries) the very idea of focusing on just the negative outcomes of process control deviations neglects the valuable lessons to be learned on the basis of positive outcomes. Every time an operator, manager, procedure, or piece of equipment behaves in an unexpected way and thereby prevents a likely breakdown of the production system (e.g. as in reduced product quality, environmental releases, etc.) or restores the required levels of safety and reliability, these positive deviations could be detected, reported and analysed in order to improve the qualitative insight into system functioning on the whole. [Pg.85]

Food additives and flavourings in foodstuffs Unlike the chemicals investigated by this research study, these additives and flavourings are intended to be ingested orally. Current EC legislation on these substances requires specific risk assessment and risk management procedures for these substances. [Pg.367]

The management procedures developed by water suppliers can be described as a water safety plan. Such a plan, which is the basis of ensuring water safety, contains three key components ... [Pg.23]


See other pages where Procedure management is mentioned: [Pg.47]    [Pg.180]    [Pg.202]    [Pg.171]    [Pg.242]    [Pg.780]    [Pg.252]    [Pg.180]    [Pg.395]    [Pg.411]    [Pg.12]    [Pg.50]    [Pg.11]    [Pg.458]    [Pg.265]    [Pg.45]    [Pg.54]    [Pg.493]    [Pg.47]    [Pg.78]    [Pg.418]    [Pg.96]    [Pg.127]    [Pg.58]    [Pg.6]    [Pg.233]    [Pg.127]    [Pg.87]    [Pg.22]    [Pg.26]   
See also in sourсe #XX -- [ Pg.26 ]




SEARCH



© 2024 chempedia.info