Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Dates for

The standards and the specifications are in constant change and should, of course, be continuously kept up-to-date for several reasons ... [Pg.296]

Lump Sum contract contractor manages and executes specified work to an agreed delivery date for a fixed price. Penalties may be due for late completion of the work, and this provides an incentive for timely completion. Payment may be staged when agreed milestones are reached. [Pg.301]

As said earlier, the draft standard is now in the enquiry/revision circuit. The estimated date for the standard publication is, in the best case, the end of 1999. [Pg.927]

Eor many pigments, a period of time in which they had their widest use can be indicated (54,62,63). Dates of introduction are known either from documentary sources or from identification on paintings of known dates. Eor some pigments, an approximate date for the discontinuation of use can be assigned. In some cases, knowledge of the preparation process or even the very existence was lost over an appreciable time span. [Pg.420]

Site characterization studies include a surface-based testing program, potential environmental impact, and societal aspects of the repository. Performance assessment considers both the engineered barriers and the geologic environment. Among features being studied are the normal water flow, some release of carbon-14, and abnormal events such as volcanic activity and human intmsion. The expected date for operation of the repository is 2013. [Pg.230]

Stabihty studies ate developed to assure a desirable shelf-life period. These also estabhsh limits of acceptabiUty for impurities and degradation compounds, when present, and determine acceptable storage conditions for raw materials and the manufactured products. Stabihty studies are thus important to the deterrnination of expiration dates for dmg products. [Pg.225]

The laboratory units that have been employed to date for these experiments were designed to operate at a total system pressure of about 100 kPa (1 atm) and at near-ambient temperatures. In practical situations, it may become necessaiy to design a laboratory absorption unit that can be operated either under vacuum or at elevated pressures and over a reasonable range of temperatures in order to apply the Danckwerts method. [Pg.1366]

Ozone Layer was signed, which set a timetable for phasing out the production and use of CFCs, including halons. The date for phaseout of the manufacture of halons according to the latest Copenhagen Meeting was January 1, 1994 (UNEP, Montreal Protocol on Substances that Deplete the Ozone Layer—Final Act 1987, 1987). [Pg.2339]

In the cubicle construction of a switchgear assembly the busbar chamber is normally located at the top of the assembly and runs through the length of it. It is usually suitable for extension, through fish joints at either end, if required at a later date. For installations having top cable entry, the busbar chamber may also be located at the bottom of the assembly or the depth of the panel increased, with an additional shroud between the top busbar chamber and cable chamber. From these main busbars are tapped the vertical buses for each vertical panel. Manufacturers may adopt different practices for horizontal and vertical busbar arrangements to economize on their cost of production. We illustrate the most common types of busbar arrangements. [Pg.368]

Installation of a shut-off valve in the expander exhaust line prevents baekflow during expander isolation (Figure 6-37). Although the need for this valve may not be immediately obvious, it ean be very bene-fieial if the expander is operated for an extended period in the windmilling mode. Often this type of operation is not antieipated during the initial evaluation of valve requirements, but beeomes neeessary at some later date. For example, it is useful when it is deemed prudent... [Pg.375]

Classification and Attainment Dates for Ozone Nonattainment Areas... [Pg.398]

Nationwide, plants that emit SO2 at a rate below 1.2 Ibs/mm Btu will be able to increase emissions by 20% between a baseline year and 2000. Bonus allowances will be distributed to accommodate growth by units in states with a statewide average below 0.8 Ibs/mm Btu. Plants experiencing increases in their utilization in the last five years also receive bonus allowances, 50,000 bonus allowances per year are allocated to plants in 10 mid western states that make reductions in Phase I. Plants that repower with a qualifying clean coal technology may receive a 4 year extension of the compliance date for Phase II emission limitations. [Pg.401]

Since the adjustments for inflation are so large, it is important to fix the date for historical data as closely as possible. For instance, a historical cost estimate from a vendor or contractor for equipment to be delivered in two years would have escalation built in, so the index should be for two years later, when the equipment was expected to be manufactured. However, data based on purchased equipment delivered on a certain date should use the index for the date the equipment was manufactured. [Pg.234]

Temporary variance An OSH A variance issued to an employer who is unable to comply with a standard by its effective date for reasons beyond their control. The employer must demonstrate a plan for coming into compliance within a period not to exceed one year and provide all available measures to protect the employees in the interim. [Pg.1481]

As part of the verification plan, you should include an activity plan that lists all the planned activities in the sequence they are to be conducted and use this plan to record completion and conformance progressively. The activity plan should make provision for planned and actual dates for each activity and for recording comments such as recovery plans when the program does not proceed exactly as planned. It is also good practice to conduct test reviews before and after each series of tests so that corrective measures can be taken before continuing with abortive tests (see also under Design validation). ... [Pg.261]

Provide forms for recording the agreed corrective and preventive action and target dates for completion. [Pg.470]

Don t wait until the due date for the completion of the action to check if work has started. [Pg.472]

Any schedule you develop should reflect both the tasks you have defined and the resources available for accomplishing them. In addition, the implementation schedule in some cases may depend on a predetermined end date. For this reason, schedule and resource requirement tasks should be seen as interdependent it s realistic to expect that you may need more than one iteration before both are firmly established. [Pg.112]

I As you develop your network of tasks, you will quickly realize that not only are tasks within one priority area interrelated, but there are also relationships with other priority areas. These relationships will determine the order in which some tasks are completed and the resources you need to apply to complete them by a given date. For example, the team will need to develop programs and elements before they develop the contents of a training program, yet the training program itself may be a vital part of the process for developing individual responsibilities for that content. [Pg.77]

The recommended initial step is to determine the duration of the study period for the analysis by first defining a start date. The end date is determined by the maintenance records. For computerized systems, the last update of the overall system provides the end date. For manual systems, it may be necessary to define an end date to accommodate the lag time in updating records. The start and end dates define the maximum calendar time that a piece of equipment is available for service. The operating time for this equipment will be equal to or less than the calendar period, depending on plant operations and the equipment s operating mode. [Pg.219]

The best solution to date for the electronic ground state is that of Wind (1965) who found an electronic energy (relative to infinitely separated nuclei and electrons) of —0.602634 2 h, which corresponds to a dissociation energy... [Pg.76]

Microporous insulation materials consist mainly of highly dispersed silica with a particle size of only 5-30 nm. The highly dispersed silica powder is pressed to plates, which receive heat treatment up to 800 °C, after which the plates are self-supporting and possess a micropore structure with pore diameter of 0.1pm. The addition of opacifiers to the highly dispersed silica starting material reduces the loss of heat by radiation. The dates for such insulation boards are shown in Table 18. [Pg.588]

The highest ee s reported to date for the addition of achiral organometallic reagents in the presence of aprotic chiral additives were observed with the C2-symmetric diamines 10, 11 and 12 (Table 25)13 — 15. Enantioselectivities as high as 89% ee were observed with chiral auxiliary 1012. Addition of phenyllithium to pentanal proceeds with lower enantioselection that the analogous addition of butyllithium to benzaldehydeu. Generally, the enantioselcctivity in-... [Pg.148]


See other pages where Dates for is mentioned: [Pg.2754]    [Pg.350]    [Pg.335]    [Pg.346]    [Pg.418]    [Pg.419]    [Pg.34]    [Pg.38]    [Pg.74]    [Pg.324]    [Pg.265]    [Pg.270]    [Pg.876]    [Pg.69]    [Pg.128]    [Pg.226]    [Pg.6]    [Pg.523]    [Pg.412]    [Pg.283]    [Pg.622]    [Pg.2]    [Pg.88]    [Pg.96]    [Pg.771]    [Pg.818]    [Pg.34]   
See also in sourсe #XX -- [ Pg.12 ]




SEARCH



A Potential Tool for Groundwater Dating

Dates for Descendant or setting sign

Dates for Imum Coeli

Dates for Jupiter

Dates for Mercury

Dates for Midheaven

Dates for Neptune

Dates for Pluto

Dates for Saturn

Dates for Uranus

Dates for Venus

Dates for at work

Dates for described

Dates for in love

Dates for qualities

Dates for relationships

Dates for ruling planet

Dating method 4 Extinct nuclides for relative ages

Noble Gases as Dating Tools for Surficial Processes

Requirements for accurate dating

STEP-GROWTH POLYMERS FOR HIGH-PERFORMANCE MATERIALS Publication Date: May 5, 1996 doi

Some of the worlds most important crop plants and approximate dates for domestication

© 2024 chempedia.info