Today, special cut process planning software is used to improve the work planning process. It links together ERP (enterprise recourse planning), fabric management... [Pg.221]

Selection of Cutting Tools Machining is realized by controller motion of cutting tools in relation to the workpiece. Appropriate selection of cutting tools is therefore a major part of process planning. The tools are chosen according to the attributes of the workpiece and product features as well as the machine tools and operations that have been selected to produce them. [Pg.270]

One important possibility to examine, analyze, and improve machining processes is the modeling and simulation. Using this technique the performance of cutting processes and characteristics of manufactured components can be predicted and planned in order to optimize productivity, quality, and cost (Tapoglou and Antoniadis 2012 van Luttervelt et al. 1998). [Pg.890]

Cut order planning (COP) is the first stage in the production workflow of a typical apparel manufacturing company, as shown in Fig. 5.1. It is a planning process to determine how many markers are needed, how many of each size of garment... [Pg.81]

In the apparel industry, production orders tend to split into smaller orders with different product features in response to growing requests for product customization. In order to shorten product time-to-market, apparel manufacturers work hard in the direction of just-in-time production. In the apparel manufacturing process, the effectiveness of fabric-cutting schedule planning extensively influences downstream assembly operations, and thus, in turn, is critical to the overall system performance. However, the demand from downstream operation... [Pg.149]

Setup and operation part manufacturing process model entities are created and captured in the process model mainly manually, with minor but important computer assistance. Some process planning activities, such as selection of machine tools, configuration of setups, selection of cutting tools, and sequencing of operations are assisted by automatic computer procedures in advanced systems. Some of the automatic functions for machining are ... [Pg.202]

Some analyses ensure economical process plans and control programs. The economical consequences of a process plan and control program can be assessed by cost estimation based on machining time, total cycle time, length of tool paths, number of cutting tools, etc. [Pg.219]

Human Solutions provide technology solutions for a number of areas in the apparel PD process. The company provides body-scanning solutions (both laser-based and depth-sensor-based), 2D and 3D CAD solutions, a web-based sizing and fit solution, a PLM solution, a cut-order planning solution, a marker solution, and a digital virtual try-on solution. [Pg.49]

The next stage is to follow a rough-cut capacity planning process to assess to what extent the capacity of manufacturing facihties could meet the master schedule. The feedback loop at this level tests the master plan against problem... [Pg.317]

Rough-cut capacity planning (RCCP) RCCP process considers only the critical work centres (bottlenecks, highly utilized resources, etc.) and attempts to balance longer-term workloads and demand at high level. [Pg.385]

To ensure that there is enough capacity and resources available to achieve the consensus forecast it is necessary to produce a rough cut capacity plan - otherwise known as a resource plan. Essentially the logic behind the rough cut capacity plan is to look at the aggregate product family forecast for the planning period and to translate that into the capacity and resources needed, e g. how much machine time, how much time in an assembly process, how much transport capacity and so on. [Pg.91]


See other pages where Cut process planning is mentioned: [Pg.221]    [Pg.221]    [Pg.221]    [Pg.221]    [Pg.222]    [Pg.222]    [Pg.222]    [Pg.223]    [Pg.221]    [Pg.221]    [Pg.221]    [Pg.221]    [Pg.222]    [Pg.222]    [Pg.222]    [Pg.223]    [Pg.635]    [Pg.455]    [Pg.463]    [Pg.472]    [Pg.494]    [Pg.586]    [Pg.2839]    [Pg.179]    [Pg.189]    [Pg.193]    [Pg.257]    [Pg.258]    [Pg.270]    [Pg.891]    [Pg.984]    [Pg.11]    [Pg.82]    [Pg.90]    [Pg.101]    [Pg.197]    [Pg.197]    [Pg.127]    [Pg.128]    [Pg.211]    [Pg.749]    [Pg.221]    [Pg.24]    [Pg.36]    [Pg.71]    [Pg.265]   