Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Constructing and Manufacturing

In contrast, as Halpin goes on to explain, with constructing the purchase begins with the client, owner, or customer who has need for a structure, facility, or system and, as a result, often retains an engineering firm to provide design services and later contracts for construction. The risks in this process include the possibility that the one-of-a-kind resulting structure, facility, or system will not function as required. [Pg.294]


Based on the results from the initial experiments ultrasonic equipment and transducers for the scanning system were selected. Also a measuring chamber with transducer fixtures was constructed and manufactured for measurement on the tubes directly on the drawing bench. [Pg.898]

Modern data acquisition and evaluation help to optimise the plant under review within a short period of time, to eradicate faults in plant operation and to determine the best materials for the operation of the chlorine electrolysis plant being examined. In this way, inter-relationships are examined between the energy consumption and variables such as membrane types, anode and cathode coatings, temperature, pressure, and concentrations as well as plant shutdowns, brine impurities, materials of construction and manufacturers. It is conceivable that other inter-relationships will come to light that have so far not been considered. [Pg.224]

Owing to safety aspects, apparatus is much more restricted than mechanical machines in plants. Construction and manufacturing of machines are widely unrestricted if basic principles, fixed, for example, in national regulation collections such as the German VDMA-Einheitsblatter are considered. [Pg.507]

An equipment layout affects the construction and manufacturing costs and must be engineered to prevent future problems in production. General arrangements (GAs) of the packaging operation should be completed to provide direction for the project team and possible vendors. Preliminary layouts are developed to illustrate the foflowing. [Pg.2645]

Furthermore, perlite has been reported to be a suitable support for titanium dioxide nanomaterials [516-520]. Basically an amorphous alumina silicate (see Table 13), Perlite is an industrial mineral and a commercial product, useful for its light weight after processing. Due to its low density and relatively low price, many commercial applications for perlite have been developed including construction and manufacturing fields, horticultural aggregates, filter aid and fillers [519]. [Pg.110]

Time resources represent our understanding of the time factor in our designing situation. This kind of resource not only includes times when our team members are available and when experts are available but also information about the timing of the construction and manufacturing of the individual structural members. It may also contain information on how much time is available for our project. Space resources provide information about available space for our system, access to it from various directions, penalties for using more space than originally assigned, and so on. [Pg.131]

Department of Construction and Manufacturing Engineering, Universidad Nacional de Educacion a Distancia (UNED) C/ Juan del Rosal, 12 Madrid 28040, Spain... [Pg.105]

Additionally, traditional occupational and industrial safety methods should be employed to identify and control construction and manufacturing hazards associated with the project. For the remainder of the life cycle, system safety efforts are complemented by existing occupational, industrial, or operations safety programs. [Pg.66]

Cases involving days away from work, the most serious injuries, also have proven difficult to improve nationwide. In 2009, the Bureau of Labor Statistics reported 965,000 DART cases (cases involving Days Away From Work, Job Transfer or Restriction Cases). In 2004, there were 1,259,000. But in the intervening years, severe economic recession and high unemployment, particularly in the dangerous fields of construction and manufacturing, have skewed the numbers. (See chart.)... [Pg.32]

In the case of thermosets, because of their composite construction, their HDB is determined not only by the properties of the materials used but also by the specific wall construction and manufacturing process. Typical HDBs for some machine-made RTRPs for water service at73°F (23°C) are given in Table 5.52. The pipe manufacturer should be consulted for HDBs for the specific pipe construction under consideration. [Pg.755]

The manufacturer of work equipment intended for use in potentially explosive atmospheres has to construct and manufacture his products in compliance with the basic requirements ofthe Directive 94/9/EC [1]. The products have to be subjected to a risk assessment and ignition hazard analysis. In the result of them the... [Pg.157]


See other pages where Constructing and Manufacturing is mentioned: [Pg.795]    [Pg.615]    [Pg.5]    [Pg.163]    [Pg.578]    [Pg.623]    [Pg.95]    [Pg.95]    [Pg.759]    [Pg.316]    [Pg.383]    [Pg.286]    [Pg.157]    [Pg.328]    [Pg.7]    [Pg.36]    [Pg.48]    [Pg.1469]    [Pg.137]    [Pg.20]    [Pg.237]    [Pg.283]    [Pg.283]    [Pg.284]    [Pg.284]    [Pg.284]    [Pg.285]    [Pg.286]    [Pg.288]    [Pg.290]    [Pg.292]    [Pg.294]    [Pg.294]    [Pg.294]    [Pg.294]    [Pg.294]    [Pg.296]    [Pg.457]    [Pg.460]   


SEARCH



Building Constructing and Manufacturing

© 2024 chempedia.info